My WebLink
|
Help
|
About
|
Sign Out
Home
2022.05.16 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.05.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 2:48:23 PM
Creation date
5/16/2022 2:45:58 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/16/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K:\020118-000\Admin\Docs\020118-000 LTR RJuba- Oneka Elementary School 2022-04-22.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM April 22, 2022 <br /> <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br /> <br />Re: Site Plan Review <br /> Oneka Elementary School <br /> WSB Project No. 020118-000 <br /> <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the site plan submittal for the Oneka Elementary School Addition site located <br />west of Oneka Parkway and north of Heritage Parkway. In particular, we have reviewed the <br />following plans related to this particular request: <br /> <br /> Oneka Site Submittal (2022.3.4 - Oneka ES City Submittal.pdf) dated 3/4/2022 by Larson <br />Engineering and Wold Architects and Engineers <br /> Stormwater Report (22.03.23 Oneka Elementary School Stormwater Report.pdf) dated <br />3/23/2022 by Larson Engineering <br /> <br />Based on the review of the above documents, we offer the following comments related to this <br />application: <br /> <br />Grading, Street, and Utility Plans <br /> <br />1. The site is not impacting either of their existing access points and only modifying their <br />northern parking lot to provide an additional row of parking. <br />2. The applicant is constructing an addition on their building that conflicts with their existing <br />looped water service. They will be rerouting the water service around the building addition <br />and providing a new stub to service it. All construction for the rerouting and new water service <br />connection will be outside the City right of way and on private property. <br />3. The sanitary service to the new addition will be provided by constructing a manhole and <br />connecting to their existing sanitary sewer service. All construction for the sanitary sewer <br />service connection will be outside the City right of way and on private property. <br />4. Grading is proposed adjacent to the building addition to blend into the surround existing <br />topography. Additional grading is also proposed to accommodate drainage from the parking <br />lot addition. <br />5. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.