Resolution 2022-66 <br />Page 3 <br />6. The developer shall comply with all items in the MnDOT letter dated September 9, <br />2022. All access points require a permit to be issued from MnDOT. <br />7. The applicant shall obtain all necessary local, state, and federal permits. <br />8. The docks shall be reviewed and approved by the MnDNR and the Technical <br />Evaluation Panel (TEP). <br />9. PUD flexibility is granted to allow flexibility on the following: <br />a. Shoreland regulations <br />a. Allow structures to be 0 feet from the OHW of Egg Lake, where 75 <br />feet is required by ordinance. <br />b. Allow the maximum building height to be 27 feet where, 25 feet is <br />required by ordinance. <br />c. Allow the maximum impervious surface to be 46%, where 25 is <br />required by ordinance. <br />b. Parking regulations <br />a. Allow a reduction in parking, but uses shall to be reviewed with each <br />phase of development. <br />c. Rear setback regulations <br />a. Allow a rear yard setback of 0 feet, where 30 feet is required by <br />ordinance. <br />10. The preliminary phasing plan is generally approved per plans dated March 18, 2022. <br />Any major revisions to the phasing plan shall require PUD amendment. Minor <br />modifications shall be reviewed and approved by staff. <br />a. Phase 1 shall include: <br />i. An approximately 6,888 square foot restaurant building. <br />ii. All improvements shown in the phase 1 plan, including <br />boardwalks. <br />b. Phase 2 shall include: <br />i. All improvements shown in the phase 2 plan, including and <br />boardwalks. <br />11. Each phase be required to apply for PUD final plan, and other applicable applications, <br />to be reviewed and approved by the City Council. <br />12. The building setbacks and impervious surface requirements for the development are <br />as follows: <br />Front Setback 10 feet <br />min) <br />Side Setback 0 feet <br />min