My WebLink
|
Help
|
About
|
Sign Out
Home
2022.08.01 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.08.01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 11:46:41 AM
Creation date
10/13/2022 11:41:14 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oneka Prairie Sketch Plan <br /> <br />The applicant is required to dedicate land, pay a fee, or a combination of land and fee to satisfy <br />park dedication per Sec. 90-324 of the City Code. The applicant is required to dedicate 10% of <br />the developable acres for park land with a density of less than 3.99 units per acre. With 21.4 <br />buildable acres, 2.14 acres of land would be required to be dedicated. <br /> <br />The developer is proposing to dedicate a combination of land and fee. The developer is <br />proposing to dedicate a tot lot that is 29,089 square feet or .66 acres which would satisfy 30% of <br />the requirement. To satisfy the remaining requirement, 70% of the fee would be paid per unit. <br /> <br />Park <br />Dedication <br />Calculations <br /> Required <br />*Land OR Fee Proposed <br />Land 10% of the developable acres 2.14 acres .66 acres and <br />Fee $3,400 per unit $200,600 $146,420 <br /> <br />The developer is proposing to construct amenities on the future city park including a shelter, <br />playground, and sidewalk loop in exchange for PUD flexibility. The site plan also includes trees <br />as a buffer to adjacent homes. There is a wetland shown on the proposed park. Wetlands are not <br />given credit for park dedication and this may result in an adjustment to the final calculations. <br /> <br />At its July 20, 2022, the Parks Commission provided feedback on the proposed sketch plan and <br />amenities as it is anticipated that it will become a city park. They generally liked the park layout <br />and the proposed amenities. They recommended approval of the proposed park dedication <br />request by the applicant. <br /> <br />Landscaping <br /> <br />The developer has not submitted a landscape plan. In exchange for PUD flexibility, the City <br />could expect a landscape plan that goes beyond the minimum requirements to provide street <br />trees, entrance streetscaping, plantings around a monument sign, plantings in openspace, etc. <br /> <br />Streets & Access <br /> <br />The property is located north of Empress Avenue North (constructed as part of the Oneka Place <br />Development), south of 165th Street and east of the extension of Oneka Parkway. Thea applicant <br />is proposing to extend Oneka Parkway 700 feet to the north. An existing 100-ft right-of-way <br />exists for the construction of Oneka Parkway. Additional right-of-way is not necessary to be <br />dedicated. The remaining portion of Oneka Parkway is proposed to be constructed as adjacent <br />properties develop. <br /> <br />Two new access points along Oneka Parkway are proposed. There will be a new access point <br />into the development coming from the extension of Fairoaks Avenue that was constructed as part
The URL can be used to link to this page
Your browser does not support the video tag.