Laserfiche WebLink
Civil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-0060PROJECT <br />ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION4/29/21CONSTRUCTION PLANS5/7/21CONSTRUCTION PLANS5/28/21CONSTRUCTION PLANS6/1/21WATERSHED RESUBMITTAL6/14/21CONSTRUCTION PLANS7/21/21SANITARY REVISIONSPROJECT NUMBER:DRAWN BY:REVIEWED BY:8/26/21UTIL REVISIONS8/30/21UTIL REVISIONS9/24/21UTIL REVISIONS10/18/21WATER/SANITARY SERVICE REVISIONS10/25/21REVISED WATERMAIN2/4/22APPROVED FOR CONSTRUCTION SET6/8/22FINAL PLAT SUBMITTAL PHASE 2COPYRIGHT CIVIL SITE GROUP INC.c44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.06/08/2212/13/20REVISED CITY SUBMITTAL12/23/20REVISED CITY SUBMITTAL1/5/20WATERSHED SUBMITTAL1/26/213/8/21REVISED WETLAND PLANS12/4/20CITY SUBMITTALCITY RESUBMITTAL3/26/21FINAL PLAT SUBMITTAL18301MP, KT, BJMP, KTThe Meadows at Hugo <br />Hugo, MN <br />11460 Robinson Dr. NW, Minneapolis, MN 55433 <br />Centra North, LLCREVISION SUMMARYDATEDESCRIPTIONC6.4CIVIL DETAILS8/2/21PAD REVISION..........BUILDING PAD - VILLA - SLAB ON GRADE PADN T S15'70' PAD ON 50' WIDE LOTS OR 60' PAD ON 44' WIDE LOTS5' OVERSIZING (TYP.)5' OVERSIZING (TYP.)10'BUILDING LINE <br />BUILDING LINE <br />1:1 SLOPECOMPACTED STRUCTURAL BACKFILLCONTRACTOR TO EXCAVATE SOIL MATERIAL AS REQUIRED BY SOILS ENGINEER.TOP OF STABLE SUBSOIL (PER SOILS ENGINEER)(PER SOILS ENGINEER)BACK OF CURBGARAGE FLOOR ELEV.PER PLANVARIESGRADE ELEVATION =GARAGE FLOOR ELEVATION6" BELOW TOP OF BLOCKPER ELEVATION ON PLAN0.5' TOPSOILTOPSOIL / GRADING GRADEFINISHED GRADEFINISHED GRADE10"HOLD DOWNGARAGE FLOOR ELEV.NOTE:1.THE DESIGNATED HOLD DOWN SHALL BE COMPLETED ACROSS THE ENTIRE WIDTH OF THE LOT (SIDE LOTLINE TO SIDELOTLINE)2.THE SOIL CORRECTION SHALL BE COMPLETED ACROSS THE ENTIRE WIDTH OF THE LOT (SIDE LOTLINE TO SIDE LOTLINE)15'BCROW/PROP LINEFRONT SETBACKSIDEWALK/TRAIL0.5'MIN <br />TOPSOIL / GRADING GRADE10'D&U EASEMENTSUBGRADE5% SLOPE1:1 SLOPE3:1 MAX1S4.2%TYPICAL LOT INFORMATION:GF=GARAGE FLOOR (ATFRONT OF GARAGE)RP=REAR PAD GRADE(GROUND GRADE ATREAR OF BUILDINGPAD)TYP. LOT DIMENSIOND & U EASEMENTBUILDING SETBACK