My WebLink
|
Help
|
About
|
Sign Out
Home
2022.08.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.08.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 11:55:23 AM
Creation date
10/13/2022 11:46:41 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-0060PROJECT <br />ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION4/29/21CONSTRUCTION PLANS5/7/21CONSTRUCTION PLANS5/28/21CONSTRUCTION PLANS6/1/21WATERSHED RESUBMITTAL6/14/21CONSTRUCTION PLANS7/21/21SANITARY REVISIONSPROJECT NUMBER:DRAWN BY:REVIEWED BY:8/26/21UTIL REVISIONS8/30/21UTIL REVISIONS9/24/21UTIL REVISIONS10/18/21WATER/SANITARY SERVICE REVISIONS10/25/21REVISED WATERMAIN2/4/22APPROVED FOR CONSTRUCTION SET6/8/22FINAL PLAT SUBMITTAL PHASE 2COPYRIGHT CIVIL SITE GROUP INC.c44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.06/08/2212/13/20REVISED CITY SUBMITTAL12/23/20REVISED CITY SUBMITTAL1/5/20WATERSHED SUBMITTAL1/26/213/8/21REVISED WETLAND PLANS12/4/20CITY SUBMITTALCITY RESUBMITTAL3/26/21FINAL PLAT SUBMITTAL18301MP, KT, BJMP, KTThe Meadows at Hugo <br />Hugo, MN <br />11460 Robinson Dr. NW, Minneapolis, MN 55433 <br />Centra North, LLCREVISION SUMMARYDATEDESCRIPTIONC6.4CIVIL DETAILS8/2/21PAD REVISION..........BUILDING PAD - VILLA - SLAB ON GRADE PADN T S15'70' PAD ON 50' WIDE LOTS OR 60' PAD ON 44' WIDE LOTS5' OVERSIZING (TYP.)5' OVERSIZING (TYP.)10'BUILDING LINE <br />BUILDING LINE <br />1:1 SLOPECOMPACTED STRUCTURAL BACKFILLCONTRACTOR TO EXCAVATE SOIL MATERIAL AS REQUIRED BY SOILS ENGINEER.TOP OF STABLE SUBSOIL (PER SOILS ENGINEER)(PER SOILS ENGINEER)BACK OF CURBGARAGE FLOOR ELEV.PER PLANVARIESGRADE ELEVATION =GARAGE FLOOR ELEVATION6" BELOW TOP OF BLOCKPER ELEVATION ON PLAN0.5' TOPSOILTOPSOIL / GRADING GRADEFINISHED GRADEFINISHED GRADE10"HOLD DOWNGARAGE FLOOR ELEV.NOTE:1.THE DESIGNATED HOLD DOWN SHALL BE COMPLETED ACROSS THE ENTIRE WIDTH OF THE LOT (SIDE LOTLINE TO SIDELOTLINE)2.THE SOIL CORRECTION SHALL BE COMPLETED ACROSS THE ENTIRE WIDTH OF THE LOT (SIDE LOTLINE TO SIDE LOTLINE)15'BCROW/PROP LINEFRONT SETBACKSIDEWALK/TRAIL0.5'MIN <br />TOPSOIL / GRADING GRADE10'D&U EASEMENTSUBGRADE5% SLOPE1:1 SLOPE3:1 MAX1S4.2%TYPICAL LOT INFORMATION:GF=GARAGE FLOOR (ATFRONT OF GARAGE)RP=REAR PAD GRADE(GROUND GRADE ATREAR OF BUILDINGPAD)TYP. LOT DIMENSIOND & U EASEMENTBUILDING SETBACK
The URL can be used to link to this page
Your browser does not support the video tag.