My WebLink
|
Help
|
About
|
Sign Out
Home
2022.10.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.10.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 12:02:51 PM
Creation date
10/13/2022 11:57:00 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREPARED FORCOVER SHEETC000PREMIER BANKAPPRODEVELOPMENT, INC.HUGOMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRIAN M. WURDEMAN09/09/202253113DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT160046002.109/09/2022AS SHOWNBMWCGMBMWNORTH <br />VICINITY <br />N.T.S. <br />SITE <br />HUGO, WASHINGTON COUNTY, MN <br />1.CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH <br />WHAT IS SHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION. <br />2.IF REPRODUCED, THE SCALES SHOWN ON THESE PLANS ARE BASED ON A 22x34 SHEET. <br />3.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR <br />UTILITY SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING <br />POSSESSION AND THE FINAL CONNECTION OF SERVICES. <br />4.ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, <br />AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. <br />NOTES: <br />LANDSCAPE ARCHITECT <br />KIMLEYPHORN AND ASSOCIATES, INC. <br />PREPARED BY: RYAN HYLLESTED <br />767 EUSTIS STREET, SUITE 100 <br />ST. PAUL, MN 55114 <br />TELEPHONE (612) 568-0698 <br />PROJECT TEAM: <br />SURVEYOR <br />ACRE LAND SURVEYING <br />9140 BALTIMORE STREET NE, SUITE 100 <br />BLAINE, MN 55449 <br />TELEPHONE (763) 238-6278 <br />ENGINEER <br />KIMLEY-HORN AND ASSOCIATES, INC. <br />PREPARED BY: BRIAN M. WURDEMAN <br />767 EUSTIS STREET, SUITE 100 <br />ST. PAUL, MN 55114 <br />TELEPHONE (651) 645-4197 <br />OWNER / DEVELOPER <br />APPRO DEVELOPMENT, INC. <br />21476 GRENADA AVENUE, <br />LAKEVILLE, MN 55044 <br />TELEPHONE (952) 469-2171 <br />PREMIER BANK <br />SECTION 20, TOWNSHIP 31N, RANGE 21W <br />FOR <br />SITE DEVELOPMENT PLANS <br />Know what'sbelow. <br />before you dig.Call <br />SITE BENCHMARKS: <br />(LOCATIONS SHOWN ON SURVEY) <br />SBM #1 MNDOT HARN POINT "PAUL MNDT RESET". <br />ELEVATION=932.38 <br />BENCHMARKS <br />Sheet List Table <br />Sheet Number Sheet Title <br />C000 COVER SHEET <br />C100 GENERAL NOTES <br />C200 DEMO & EROSION CONTROL - PHASE 1 PLAN <br />C300 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 <br />C301 EROSION AND SEDIMENT CONTROL DETAILS <br />C400 SITE PLAN <br />C401 SITE DETAILS <br />C500 GRADING PLAN <br />C502 GRADING DETAILS <br />C600 UTILITY PLAN <br />L100 LANDSCAPE PLAN <br />L101 LANDSCAPE DETAILS <br />This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2022 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\APPRO\Hugo, MN - Premier Bank\3 Design\CAD\PlanSheets\C0-COVER SHEET.dwg September 09, 2022 - 1:33pmBYREVISIONSNo.DATEPRELIMINARY - NOT FOR CONSTRUCTION1RESPONSE TO CITY COMMENTS09/09/22CGM
The URL can be used to link to this page
Your browser does not support the video tag.