My WebLink
|
Help
|
About
|
Sign Out
Home
2022.10.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.10.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 12:02:51 PM
Creation date
10/13/2022 11:57:00 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED BUILDING <br />+/-4,500 SF932 933 933933934934 <br />93293293393 <br />4 934934 93493393493493 <br />4 <br />9339339349 <br />3 <br />4935935933 93493493593593593 <br />5933934 934935935 9349344.31% <br />3.7 <br />0 <br />% <br />2. <br />0 <br />2 <br />% <br />2.76 <br />% <br />INLET PROTECTION <br />INLET PROTECTION <br />INLET PROTECTION <br />INLET PROTECTION <br />INLET PROTECTION <br />INLET PROTECTION <br />LIMITS OF GRADING <br />LIMITS OF GRADING <br />SILT FENCE <br />SILT FENCE <br />SILT FENCE <br />SILT FENCE <br />SILT FENCE <br />BIOROLL <br />BIOROLL <br />BIOROLL <br />BIOROLL <br />CONSTRUCTION ENTERANCE <br />This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2022 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\APPRO\Hugo, MN - Premier Bank\3 Design\CAD\PlanSheets\C3-EROS PH2 PLAN.dwg September 09, 2022 - 1:33pmBYREVISIONSNo.DATEPRELIMINARY - NOT FOR CONSTRUCTION1RESPONSE TO CITY COMMENTS09/09/22CGMPREPARED FOREROSION ANDSEDIMENTCONTROL PLAN -PHASE 2C300PREMIER BANKAPPRODEVELOPMENT, INC.HUGOMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRIAN M. WURDEMAN09/09/202253113DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT160046002.109/09/2022AS SHOWNBMWCGMBMWNORTH <br />Know what'sbelow. <br />before you dig.Call <br />UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, <br />LAYDOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUEL AND MATERIAL <br />STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE <br />THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR <br />THROUGHOUT THE CONSTRUCTION PROCESS. <br />BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS FOLLOWS: <br />1.TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DENUDED AREAS THAT WILL <br />BE INACTIVE FOR 7 DAYS OR MORE. <br />2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, UNDERGROUND SYSTEM, <br />CURBS AND GUTTERS. <br />3.INSTALL APPROPRIATE INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS <br />EACH INLET STRUCTURE IS INSTALLED. <br />4.PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO <br />FINAL GRADE. <br />5.PREPARE SITE FOR PAVING. <br />6.PAVE SITE AND INSTALL STRIPING. <br />7.INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK <br />PROGRESSES. <br />8.COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL <br />AREAS. <br />9.OBTAIN CONCURRENCE WITH THE CIVIL ENGINEERING CONSULTANT THAT THE <br />SITE HAS BEEN FULLY STABILIZED THEN: <br />1.REMOVE ALL REMAINING TEMPORARY EROSION ADN SEDIMENT CONTROL <br />DEVICES <br />2.STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF BMPS. <br />SEQUENCE OF CONSTRUCTION: <br />ROCK ENTRANCE <br />INLET PROTECTION <br />SILT FENCE <br />LIMITS OF DISTURBANCE <br />SAFETY FENCE <br />BIOROLL <br />LEGEND <br />EROSION CONTROL BLANKET <br />EROSION CONTROL PLAN NOTES <br />1.ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BE <br />INSTALLED PRIOR TO CONSTRUCTION. <br />2.THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE GRADING. <br />3.THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES. <br />4.WITHIN TWO WEEKS (14 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BE <br />STABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR <br />MATERIALS. <br />5.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN <br />ACCORDANCE WITH CITY, STATE, AND WATERSHED DISTRICT PERMITS. <br />6.THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING <br />THE REMOVAL OF SILT IN FRONT OF SILT FENCES DURING THE DURATION OF THE <br />CONSTRUCTION. <br />7.ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THE <br />CONTRACTOR. <br />8.REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED. <br />9.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO <br />EXISTING STREETS AND PAVED AREAS AND SHALL SWEEP ADJACENT STREETS AS <br />NECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS. <br />10.IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATER <br />FROM A TANK TRUCK TO ALL CONSTRUCTION AREAS. <br />11.COMPLETE AREA WITHIN LIMITS OF CONSTRUCTION TO BE CLEARED AND GRUBBED
The URL can be used to link to this page
Your browser does not support the video tag.