Laserfiche WebLink
<br /> <br /> <br />Feasibility Report <br />2023 Birch Tree Ponds Area Street Improvements <br />City of Hugo <br />WSB Project No. 020855-000 Page 7 <br />6. Necessity and Effectiveness <br />The improvements proposed in this study are necessary, cost-effective, and feasible. The partial <br />reconstruction and mill and overlay of streets within the Birch Tree Ponds Area provides the City of Hugo <br />with a cost-effective means of continuing the City’s Street improvement efforts and providing an adequate <br />means of transportation for residents. These improvements will provide a longer lasting street section <br />needing less maintenance over the expected service life. The proposed improvements constitute a <br />project large enough to provide a competitive bidding environment, economy of scale, and are therefore <br />deemed to be cost-effective. Based on the information contained within this report, the proposed <br />improvements as described can be considered necessary, cost-effective, and feasible from an <br />engineering standpoint. <br /> <br />