My WebLink
|
Help
|
About
|
Sign Out
Home
2022.11.21 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.11.21 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 4:19:47 PM
Creation date
11/21/2022 4:16:09 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/21/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo City Council November 11, 2022 Page 2 <br />S:\Community Development\LGU\WCA 2022\22.15 Xcel Energy 13620 Fenway Blvd\Replacement Plan\MEMO_HugoCityCouncil_XcelHTCWetlandReplacement_111122.docx <br />building and associated parking lot in the northeast corner of the parcel. The transmission line and substation training facilities are located throughout the central and northwest portions of the site. A stormwater management pond is proposed immediately west of the new building and parking area to provide stormwater management for the new impervious. This would provide the comprehensive training needed by Xcel and provides an effective in-processing facility to facilitate nuclear plant maintenance outages. This alternative would require impacts (excavation) to wetland 1. The total amount of impact to W etland 1 using the preferred alternative is 0.39 acres. This amount of impact must be replaced and is proposed to be replaced using wetland bank credits. The required wetland replacement ratio is 2.5:1; however, the proposed wetland bank is within the same bank service area (BSA) 7, which allows a reduction of 0.5:1; resulting in a required replacement ration of 2:1. The proposed wetland bank is bank #1722 which is located within the same BSA and major watershed (Mississippi River-Metro). A total of 0.78 acres of wetland credit are proposed to be withdrawn from this bank to meet the required 2:1 replacement ration. It is important to note, that while the proposed wetland replacement meets rule requirements, wetland functions identified for W etland 1 will be permanently lost within the City of Hugo. Special considerations required to be considered as part of the application process have been addressed and no impacts to these considerations have been identified by the applicant. Based on the application materials submitted by the applicant and subsequent review of those materials against MN Rule 8420, the WCA, the applicant has met all of the rule requirements for wetland impact sequencing and replacement. The TEP recommends approval of this application for wetland impacts sequencing and replacement. Application materials and site plans are attached to this memo.
The URL can be used to link to this page
Your browser does not support the video tag.