My WebLink
|
Help
|
About
|
Sign Out
Home
2022.11.21 RESO 2022-77 Site Plan for Xcel Energy-13620 Fenway Blvd
Hugo
>
City Council
>
City Council Resolutions
>
2022 CC Resolutions
>
2022.11.21 RESO 2022-77 Site Plan for Xcel Energy-13620 Fenway Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 8:56:18 AM
Creation date
11/23/2022 8:56:08 AM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
11/21/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2022-77 <br /> APPROVING A SITE PLAN FOR XCEL ENERGY FOR A BUILDING AND OUTDOOR <br /> TRAINING FACILITIES ON PROPERTY LOCATED AT 13620 FENWAY BOULEVARD <br /> NORTH <br /> WHEREAS, Xcel Energy has requested approval of a site plan to allow construction of an <br /> approximately 35,000 square foot building and outdoor training facilities on the property located at <br /> 13620 Fenway Boulevard North and legally described as follows: <br /> See Attachment. <br /> WHEREAS, the Planning Commission has reviewed the site plan at a duly called a Public Hearing on <br /> November 10,2022, and recommends approval; <br /> NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br /> HUGO, MINNESOTA, that it should and hereby does approve the request by Xcel Energy for a site <br /> plan, subject to the following conditions: <br /> 1. A site plan is approved for an approximately 35,000 square foot building and outdoor training <br /> facilities in accordance with the application received by the City on August 5, 2022 and November <br /> 7, 2022, except as amended by this resolution. <br /> 2. The site plan is subject to approval of a conditional use permit (Resolution#2022-XX) and variance <br /> (Resolutions#2022-XX) <br /> 3. A sign permit is required for all signs. The sign permit application shall be reviewed and approved <br /> by City staff prior to installation. <br /> 1. The applicant will be responsible for maintaining stormwater facilities and vegetation proposed as a <br /> part of the project. A maintenance agreement between the City and the applicant shall be reviewed <br /> and approved by the City then recorded against the property prior to the start of grading activities on <br /> the site. Drainage and utility easements shall be dedicated to the City over the stormwater <br /> management facilities. <br /> 4. Prior to issuance of building permits, the developer must comply with the following conditions: <br /> a. The applicant shall comply with all conditions from the City Engineer's memo dated <br /> November 3, 2022 <br /> b. The developer shall obtain all necessary local, state, and federal permits. <br /> c. The developer shall pay all fees as required in the fee schedule, subject to change each <br /> year. <br /> d. The applicant shall provide a plan for screening roof top or ground mounted mechanical <br /> equipment. Roof top mechanical equipment shall be screen with building materials <br /> consistent with the building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.