Laserfiche WebLink
CITY OF HUGO <br />ATTACHMENT TO ORDINANCE NO. 2022- <br />2023 FEES, RATES AND CHARGES <br />ESCROW <br />FEES AND OTHER <br />PLANNING & ZONING RELATED: (continued) <br />STREET & ROADWAY RELATED: <br /> Street and Easement Vacation 110.00$ 1,000.00$ <br />SUBDIVISION RELATED: Payable with Preliminary AND Final Plat Applications <br /> Minor Subdivision - Rural (3 lots or less) 220.00$ 1,000.00$ <br /> Minor Subdivision - Urban (3 lots or less) 220.00$ 2,000.00$ <br /> Subdivision - 4 to 15 lots 540.00$ 5,000.00$ <br /> Subdivision - 16 to 30 lots 700.00$ 10,000.00$ <br /> Subdivision - 31 to 100 lots $25 per lot 20,000.00$ <br /> Subdivision - Over 100 Lots $25 per lot 30,000.00$ <br />VARIANCE RELATED: <br /> Variance to Zoning Ordinance 200.00$ <br /> Minor Deviations to Zoning Ordinance 200.00$ <br />PUBLICATIONS: <br /> Audit/Comprehensive Plan 55.00$ <br /> Municipal Code 125.00$ <br /> Zoning Map 7.00$ <br /> Zoning Ordinance 65.00$ <br /> Other Publications Cost + 10% <br /> DVD Recordings 10.00$ Official Newspaper Exempt <br />PUBLIC WORKS RELATED: <br /> Grass/Weed Mowing 75.00$ first half hour (minimum charge) <br /> Grass/Weed Mowing 60.00$ each additional hour or fraction thereof <br /> Maintenance Worker (no equipment) 60.00$ per hour <br /> Maintenance Worker w/pickup truck 90.00$ per hour <br /> All Other Equipment w/operator 150.00$ per hour <br />ROADWAY RECONSTRUCTION/REHAB: <br />Single-Family Residential/Duplex Rates: <br /> Complete Reconstruction 5,200.00$ per unit <br /> Partial Reconstruction 4,100.00$ per unit <br /> Roadway Reclamation/Overlay 3,400.00$ per unit <br /> Urban Roadway Overlay 2,100.00$ per unit <br /> Rural Roadway Overlay 1,800.00$ per unit <br />UTILITY RELATED: <br /> Water Utility Permit 30.00$ <br /> Water Infrastructure Fee (in lieu of assessment) 3,100.00$ per SAC unit as determined by MCES <br /> Sewer Utility Permit 30.00$ <br /> Sewer Infrastructure Fee (in lieu of assessment) 3,100.00$ per SAC unit as determined by MCES <br /> City Sewer Availability Charges (SAC): <br /> - Sewer Infrastructure Trunk Fee 1,632.00$ per SAC unit as determined by MCES <br /> - Sewer Infrastructure Connection Fee 588.00$ per SAC unit as determined by MCES <br /> - Total SAC Fee 2,220.00$ <br /> City Water Availability Charges (WAC): <br /> - Water Infrastructure Trunk Fee 1,960.00$ per SAC unit as determined by MCES <br /> - Water Infrastructure Connection Fee 680.00$ per SAC unit as determined by MCES <br /> - Total WAC Fee 2,640.00$ <br /> Water Meter Rental - Standard Residential 3/4"430.00$ plus sales & transit tax of $31.71 <br /> Water Meter Rental - Commercial - 1" M70 623.00$ plus sales & transit tax of $45.95 <br /> Water Meter Rental - Commercial - 1&1/2" Meter 1,095.00$ E-Series plus sales & transit tax of $80.76 <br /> Water Meter Rental - Commercial - 2" Meter 1,400.00$ E-Series plus sales & transit tax of $103.25 <br /> Water Meter Rental - Commercial - Larger than 2" Cost + 10% Not a stocked item Call for availability and pricing <br /> Water Meter Rental - Irrigation - 1" M70 623.00$ + 1 WAC Fee $2,640 plus sales & transit tax of $45.95 <br /> Water Meter Rental - Irrigation - 1&1/2" Meter 1,095.00$ + 2 WAC Fees $5,280 plus sales & transit tax of $80.76 <br /> Water Meter Rental - Irrigation - 2" Meter 1,400.00$ + 2 WAC Fees $5,280 plus sales & transit tax of $103.25 <br /> Water Meter Rental - Irrigation - Larger than 2" Cost + 10% + WAC Fees as determined by City Engineer <br />Page 3