My WebLink
|
Help
|
About
|
Sign Out
Home
2022.12.19 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.12.19 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 4:15:47 PM
Creation date
1/23/2023 4:08:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/19/2022
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The Shores of Oneka Lake 23 <br />cash escrow in the amount based on the final bid, plus 25% of the bid amount approved. The City <br />will then release or reduce the letter of credit by that amount. The City shall have the right to retain <br />the financial guarantee until the Improvements have been completed to the satisfaction of the City <br />and the warranty period has expired. <br /> <br /> c) Storm Water Trunk Fee. The Developer shall pay the City a Storm <br />Water Trunk Fee in the amount of $50,709.00. This sum is calculated to be $0.07 per square foot <br />for the 724,403 square feet of net developable area within the Plat. This fee shall be paid before the <br />Plat is signed by the City. <br /> <br /> d) Storm Water Ponding Fee. The storm water ponding requirement has <br />been met by the Developer through the incorporation of on-site ponding. No storm water ponding <br />fee will be applied. <br /> <br /> e) Snow Plowing. The Developer agrees to pay a one-time lump sum <br />cash escrow to the City to cover the cost of snow plowing the roads within the plat, during the first <br />snow season, before the roads are formally accepted by the City of $.50 per lineal foot. The <br />Developer shall post a cash escrow with the City in the amount of $1,762.50 ($0.50 x 3,525 = <br />$1,762.50). <br /> <br /> g) Street Maintenance. The Developer shall post a one-time lump sum <br />cash escrow with the City in the amount of $14,100.00 to cover the cost of the first street <br />maintenance the streets in the Plat. This sum is calculated to be $4.00 per foot for the 3,525 feet of <br />streets within the Plat. <br /> <br /> h) Park Dedication. The Developer agrees to pay a park dedication fee <br />of $2,023 per lot for residential development payable before the final plat is signed by the City. <br />Said fee shall be due for each of the 50 lots within the Plat (i.e. total due $101,150). <br /> <br /> i) Cul-de-sac Escrow. N/A <br /> <br /> j) Escrow for Street Signage. Developer shall deposit $12,000.00 into <br />an escrow account with the City. This amount represents an estimated cost of <br />$500/sign for 24 signs to be installed within the development. <br /> <br /> k) WCA Escrow. N/A <br /> <br />l) Sanitary Sewer Trunk Fee. The Developer shall pay the City a sanitary <br />sewer trunk fee in the amount of $81,600.00. This sum is calculated to be $1,632 per lot for the 50 <br />residential lots within this phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.