My WebLink
|
Help
|
About
|
Sign Out
Home
2022.12.19 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.12.19 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 4:15:47 PM
Creation date
1/23/2023 4:08:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/19/2022
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2022-____ <br />The Shore of Oneka Lake Final Plat and Development Agreement <br />a) The developer shall provide letter of credits for the development improvements and <br />round-about improvements. The developer shall provide an escrow to the City for the <br />roundabout improvements with the bids are received by the City, plus contingencies. <br />All fees outlined in Exhibit C shall be paid. <br /> <br />b) The plat shall comply with the City’s street naming system. Prior to the recording of <br />the plat the plans shall be revised to the City’s street naming system. <br />c) The plans shall be revised to remove proposed development for Outlot C. No <br />development approvals are implied or approved for Outlot C. <br />d) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br /> <br />e) The developer shall pay $101,150 ($2,023) in full to satisfy the required cash in lieu <br />of parkland dedication requirement. Park Dedication shall be satisfied by dedication <br />of 3.89 acres of upland on Outlot G and a combination of fee. <br /> <br />f) The developer shall pay the sewer and water trunk fees for each lot at final plat. The <br />City’s SAC and WAC fees will be paid at the time building permits issued. <br /> <br />g) The developer shall obtain approval from Xcel Energy on the crossing and <br />encroachment of the powerline easement for improvements within the easement such <br />as grading and trail. <br /> <br />h) The applicant shall provide copies of the property owners association <br />documents/covenants for City review and approval. A copy of the document shall be <br />filed for recording with the final plat. <br /> <br />i) A stormwater reuse agreement shall be reviewed and approved by staff and recoded <br />at Washington County. <br />j) The developer shall enter into a development agreement, shall agree to complete all <br />improvements, and pay all fees as required by the agreement. <br /> <br />Landscaping and Lighting <br /> <br />k) The landscape plan shall be revised to include: <br /> <br />1. A landscape buffer, with evergreen trees, from commercially zoned property to the <br />west. <br />2. A landscape plan for the roundabout, including irrigation. <br />3. Additional landscaping at key locations and focal points in the development. <br />4. The off-road trail system throughout the development. <br />5. Details for any monument signage and landscaping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.