Laserfiche WebLink
21 <br /> <br />flexibility. The Parks Commission shall review and approve the improvements/amenities prior to <br />construction. <br /> <br /> h) Cul-de-sac Escrow. N/A <br /> <br />i) Escrow for Street Signage. Developer shall deposit <br />$______________ into an escrow account with the City. This <br />amount represents an estimated cost of $500/sign for __________ <br />signs to be installed within the development. <br /> <br /> j) WCA Escrow. N/A <br /> <br />k) Sanitary Sewer Trunk Fee. The developer shall pay the City a sanitary <br />sewer trunk fee in the amount of $_______________. This sum is calculated to be $1,632 per lot for <br />the 59 residential lots within this phase. <br /> <br />l) Water Trunk Fee. The Developer shall pay the City water trunk fee in the <br />amount of $____________. This sum is calculated to be $1,960 per lot, with credit provided for the <br />stormwater reuse/irrigation system based on the anticipated reduction in water demand. The <br />reduction is calculated at ___________, resulting in a trunk water fee amount of $_______ per lot. <br />The total is based on the reduced per unit fee applied to the 59 lots in the plat.