My WebLink
|
Help
|
About
|
Sign Out
Home
4.19.23 Park Minutes
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Minutes
>
2023 Park Minutes
>
4.19.23 Park Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 1:54:11 PM
Creation date
6/27/2023 1:53:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All Aye. <br /> Motion approved. <br /> 4. U dates on ongoing projects <br /> 1. Park Sign Replacement plan <br /> Staff has continued researching pylon signs and potential vendors for the park sign replacement plan. <br /> Next step will be to contact vendors <br /> 2. Bernin Property Planning <br /> WSB and Associates is working on the Bernin Park master plan. The next step is reviewing the drafted plan <br /> and scheduling a community workshop in June. <br /> 3. North Star Wetland Bank&Trails <br /> A draft prospectus has been prepared for TEP review for the North Star Wetland Bank and scheduled to be <br /> reviewed on April 282h, 2023. After the review is completed the TEP recommendations will be discussed at <br /> the June Parks Commission meeting. This meeting will also review the drafted cost estimates determined <br /> with WSB and Associates. <br /> Plan A: Wetland hydrology would be restored by constructing ditch plugs with construction grade clay, <br /> topsoil and vegetation. One plug would be located at the intersection of the eastern lateral ditch and the east <br /> west main ditch. 2—plugs would also be in Southern ditches.An outlet control structure with a set elevation <br /> would be installed at the southwestern edge of the parcel where the ditch connects to JD3. <br /> Plan B:The Western and Central north/south lateral ditches would be filled.A ditch plug would be at the <br /> western extent of the south ditch. an OCS with a set elevation would be installed at the southwestern edge <br /> of the parcel where the ditch connects to JDL. <br /> 4. Lions Volunteer Park Veterans Memorial <br /> The Hugo American legion Commander requested a memorial be constructed in the Lions Volunteer park. <br /> 5. AdjOLJrnment <br /> Rauschendorfer made a motion, Moore-Arcand seconded to adjourn the meeting at 7:50pm. <br /> All ayes. <br /> Motion approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.