My WebLink
|
Help
|
About
|
Sign Out
Home
2024.03.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.03.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2024 8:43:51 AM
Creation date
3/14/2024 3:26:14 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/4/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1 – Repairs to Schoolhouse Roof <br />On September 14, a crew from Precise Exterior LLC, owned by Doug and DJ Amundson of Hugo, <br />began the replacement of the schoolhouse roof, which was mostly complete by the end of the day <br />on September 15. The crew held off on placing the shingles around the chimney until the masonry <br />work was complete to avoid damaging the shingles. The cost of replacing the roof was limited to the <br />purchase of materials and a fraction of labor, because of the generous donations from Doug and DJ <br />Amundson of Precise Exteriors LLC. The warranty for the shingles is enclosed in this report. <br />Of note, the conditions report that the City of Hugo had completed on the building identified some <br />asbestos in the roofing sealant on the roof by the chimney. Ron Trudeau, of Red Pine Industries, <br />donated his time to evaluate the report and confirm the material was being addressed <br />appropriately. <br />ATTACHMENT 8 - PHASE 1 REPAIRS TO ROOF, CHIMNEY, & SOFFIT Page 67 of 89
The URL can be used to link to this page
Your browser does not support the video tag.