My WebLink
|
Help
|
About
|
Sign Out
Home
2024.03.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.03.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2024 8:43:51 AM
Creation date
3/14/2024 3:26:14 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/4/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2024-___ <br />The Shore of Oneka Lake 3rd Addition Final Plat and Development Agreement <br />8. The developer shall design and install a stormwater re-use system for irrigation of the <br />individual lots. <br /> <br />9. The developer shall establish a property owners association for the development to <br />own/operate/maintain common elements, monument signage, landscaping, and the water <br />re-use system. The property owners association documents shall be reviewed and <br />approved by staff prior to recording the plat. <br /> <br />10. The landscaping planned for the plat shall be installed in one phase. The developer shall <br />take proper precautions to protect the trees as the homes are being built. <br /> <br />11. Each home shall include a minimum of 2 parking spaces within the driveway. The <br />driveway widths shall be a maximum of 24 feet at the right of way line. <br /> <br />12. Staff will continue to work with the applicant on the street lighting plan. Exact locations <br />of the street lights shall be reviewed and approved by staff prior to installation. <br /> <br />13. When needed, a Letter of Map Revision will need to be prepared and submitted for <br />FEMA approval so that the existing floodplain boundaries and elevations can be revised <br />per the plans. <br />14. The developer shall obtain all necessary local, state, and federal permits. <br /> <br />15. The property owners association shall be responsible for maintenance of all development <br />signage (if any) and landscaping within the outlots, common space, and the 159th Street <br />roundabout. <br />16. Prior to recording the final plat: <br /> <br />a) The developer shall provide letter of credits for the development improvements and <br />round-about improvements. The developer shall provide an escrow to the City for the <br />roundabout improvements with the bids are received by the City, plus contingencies. <br />All fees outlined in Exhibit C shall be paid. <br /> <br />b) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br /> <br />c) The developer shall pay $155,771 ($2,023/lot) in full to satisfy the required cash in <br />lieu of parkland dedication requirement. A portion of the Park Dedication was <br />previously satisfied by dedication of 3.89 acres of upland on Outlot G. <br /> <br />d) The developer shall pay the sewer and water trunk fees for each lot at final plat. The <br />City’s SAC and WAC fees will be paid at the time building permits issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.