Laserfiche WebLink
EXTERIOR MATERIAL FINISH SCHEDULE <br /> MATERIAL ID MATERIAL MANUFACTURER FINISH COLOR LOCATION p(3pE <br /> PCAST- 1 PRECAST CONCRETE MOLIN EXPOSED BUFF TO MATCH BRICK BASE OF COLUMNS <br /> WALL PANELS AGGREGATE <br /> MP- 1 ALUMINUM ALPOLIC KYNAR BNT WHITE REFACE EXISTING CANOPY <br /> COMPOSITE <br /> FLASH- 1 CAP FLASHING CGM KYNAR BONE WHITE NEW CANOPY COPING <br /> FLASH-2 MISC. SIDING FIRESTONE KYNAR BONE WHITE MISC.-SEE ELEVATIONS 0.1 0.2 <br /> POPE ARCHITECTS, INC. <br /> FLASHING FLASH-1 <br /> 1295 BANDANA BLVD N, SUITE 200 <br /> FIELD PAINTED FC-4 ST. PAU L, M N 55108-2735 <br /> FC- 1 FIBER CEMENT LAP JAMES HARDIE SMOOTH FINISH COLOR: BENJAMIN MOORE SEE ELEVATIONS (651) 642-9200 FAX (651) 642-1101 <br /> SIDING WHITE DOVE OC-17 <br /> FIELD PAINTED FC-1 ENTRY PARAPET www•popearch.com <br /> FC-2 FIBER CEMENT JAMES HARDIE SMOOTH FINISH COLOR: BENJAMIN MOORE SEE ELEVATIONS <br /> PANELS(SOFFIT) WHITE DOVE OC-17 <br /> FC-3 FIBER CEMENT JAMES HARDIE SMOOTH FINISH FIELD PAINTED <br /> VENTED SOFFIT 16" COLOR: BENJAMIN MOORE - SEE ELEVATIONS <br /> MP-1 <br /> WHITE DOVE OC-17 <br /> FIELD PAINTED <br /> FC-4 FIBER CEMENT TRIM JAMES HARDIE SMOOTH FINISH COLOR: BENJAMIN MOORE SEE ELEVATIONS OPENING HT <br /> BOARD 5.5" WHITE DOVE OC-17 109'-0" <br /> FCR 1 FIBER CEMENT JAMES HARDIE SMOOTH FINISH FIELD PAINTED VE� — --- $ <br /> COLOR: BENJAMIN MOORE SEE ELEVATIONS <br /> IT <br /> REVEAL WHITE DOVE OC-17 FC-4 B.O. EXIST 108F0" <br /> FLASH-2 <br /> IBE- RTY <br /> NOTE: Classical Academy <br /> y <br /> THE "BASIS OF DESIGN" MATERIALS FOR THE PROJECT ARE LISTED ON THE SCHEDULE ABOVE. SEE SPECIFICATIONS FOR <br /> ADDITIONAL MATERIAL INFORMATION AND OTHER APPROVE D SUBSTITUTIONS. <br /> FLASH-2 FLASH-2 <br /> 4PRECAST-1 PRECAST-1 LIBERTY CLASSICAL <br /> FIRST LEVEL <br /> 100'-0" ACADEMY PHASE 1 <br /> BID PACKAGE 2 <br /> 10158122nd ST N, <br /> HUG 0, MN 55038 <br /> 3 CANOPY WEST ELEVATION <br /> C3.1 1/411 = 1 '-011 <br /> G G.1 H I J <br /> PINMOUNT CAST ALUM SIGN-ALIGN WITH LAP <br /> FLASH-1 SIDING AND CENTER OVER OPENINGS <br /> _1___i FONT TYPE:VERDANA <br /> FC-4 HEIGHT: V-0" <br /> COLOR:TO BE SELECTED BY ARCHITECT <br /> FC-1 ENTRY PARAPET <br /> WALL SCONCES PROVIDED 114A" <br /> BY OWNER INSTALLED BY <br /> CONTRACTOR <br /> _ OPENING HT <br /> 109'-0" <br /> FC 4 B.O.EXIST FFIT <br /> 108'-0" <br /> FLAS 2 <br /> FLASH-2 <br /> LjPRECAST-1 <br /> FIRST LEVEL <br /> 100'-0" <br /> EXTERIOR <br /> ELEVATIONS, <br /> 2 CANOPY SOUTH ELEVATION <br /> EXTERIOR MATERIAL <br /> C3.1 1/411 = 11-011 FINISH SCHEDULE <br /> z Issues crd Revisions. <br /> 0 1 CITY SUBMITTAL 03/18/22 <br /> I— <br /> C) <br /> H <br /> U) <br /> 0.2 0.1 z <br /> FLASH-1 O <br /> U <br /> FC-4 NN <br /> L.� <br /> FC-1 ENTRY PARAPET 0jL 0 <br /> 114'-0" L L_ <br /> MP-1 <br /> O <br /> T.O.EXIST ROOFKAB z <br /> 111'-0" <br /> OPENING HT J <br /> 109'-0" Q <br /> FC-4 <br /> FLASH-2 <br /> m <br /> FLASH-2 <br /> PRECAST-1 <br /> FIRST LEVEL U ommisslon No: 41129-21249 <br /> 100-0 <br /> Drcwr b�: Author <br /> Checked b : A Che er <br /> ■ <br /> 1 CANOPY EAST ELEVATION SHEET <br /> C3.1 1/411 = 1 '-011 <br /> TRUE SHEET SCALE <br /> C:\Revit Projects\2021\41129-21249 LIBERTY PHASE 1-BP2 <br />