My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 052622
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 052622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:15:00 PM
Creation date
3/21/2024 10:15:33 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/26/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2022- <br /> Page 3 <br /> 6. Outlot Use and Ownership: <br /> Outlot Acres Ownership Use <br /> A 1.54 Current Owner(Fenway Land Wetlands/Future <br /> Company) Development <br /> B 11.37 City of Hugo Stormwater management, <br /> wetlands, and right-of-way <br /> C 5.04 Current Owner(Fenway Land Future Development <br /> Company) <br /> D 8.30 City of Hugo Stormwater management/ <br /> Wetlands <br /> E 4.41 City of Hugo Stormwater management <br /> F 0.54 City of Hugo Powerline easement/Future <br /> Trail Corridor <br /> G 31.3 City of Hugo Public open space, <br /> wetlands, trail corridor <br /> H 1.68 City of Hugo Stormwater management <br /> I 1.70 City of Hugo Stormwater management <br /> 1 6.44 City of Hugo Stormwater management <br /> 7. The developer shall comply with the City standards for street lighting within the <br /> public right-of-way. <br /> 8. Prior to the release of the final plat for recording, the developer must comply with the <br /> following conditions. <br /> a. The developer must comply with all conditions outlined in the City <br /> Engineer's memos dated May 4, 2022. <br /> b. The developer must comply with Resolution 2022- , for the PUD. <br /> c. The development shall comply with the Fire Chief s requirements <br /> regarding fire flow calculations, the location of fire hydrants, fire <br /> department connections, and fire lane signage. <br /> d. A permit from Rice Creek Watershed District shall be issued for the ditch <br /> crossing for construction of Street A. <br /> e. The developer must obtain all necessary stormwater management and <br /> WCA permits from the City. <br /> f. The developer shall obtain all necessary local, state, and federal permits. <br /> g. The developer shall provide the Homeowners Association documents for <br /> review and approval by staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.