My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 052622
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 052622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:15:00 PM
Creation date
3/21/2024 10:15:33 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/26/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsb <br /> May 4, 2022 <br /> Ms. Rachel Juba <br /> Community Development Director <br /> City of Hugo <br /> 14669 Fitzgerald Avenue North <br /> Hugo, MN 55038 <br /> Re: Shores of Oneka Lake <br /> Preliminary Plat Review <br /> WSB Project No. 019275-000 <br /> Dear Ms. Juba: <br /> We have reviewed the Preliminary Plat submittal for the Shores of Oneka Lake. We have <br /> reviewed the following information related to this application: <br /> • The Updated Shores of Oneka Lake Preliminary PlabPUD Submittal dated April 27, 2022 <br /> by Carlson McCain <br /> o 0 Phasing Plan dated February 25, 2022 by Carlson McCain <br /> U <br /> z Based on the review of the documents, we offer the following Engineering comments related to <br /> m this application: <br /> General/Access <br /> 0 LO <br /> 00 1. The subject property is located east of Highway 61 at 159t" Street and north of the existing <br /> Co Oneka Ponds development. <br /> N 2. Access will occur from the proposed roundabout project at 1591" Street and Highway 61 to the <br /> Ln <br /> ID west as well as from the existing street stubs of Goodview Avenue and Goodview Trail from <br /> the Oneka Ponds development to the south. <br /> 3. The Collector streets through the development(Street 'A' and Street 'AA') should be 32' face- <br /> to-face to match the existing roads (Goodview Avenue, etc.). <br /> 4. Applicant will need to install speed advisory signs on curves that do not meet 30 MPH <br /> z minimum requirements <br /> 5. Detailed redline comments have been provided on the plans and sent to the applicants <br /> engineer so they can be addressed in future submittals. <br /> a <br /> a <br /> Z Utility Plan <br /> a <br /> 6. As identified in the City's Comprehensive Water Supply and Distribution Plan, a 12"trunk <br /> CD watermain is proposed to be extended north from the Oneka Ponds development, through <br /> N the proposed site and both, connected to the 12" crossing at the 159t" St roundabout and <br /> stubbed to a future through street at the northern end of the site. <br /> 7. The construction plans identify this 12"trunk watermain being extended through the <br /> development to the northern property line, with the City of Hugo paying for oversizing costs. <br /> 8. The sanitary sewer will be connecting into the 10" trunk line at the southwest corner of the <br /> w development and will be serving the proposed development including apartments to the <br /> northwest as well as several lots on the eastern side of Highway 61/Forest Blvd. No <br /> = additional areas to the north will be served from this connection as the City's Comprehensive <br /> Sanitary Sewer Plan identifies them as being served from the north. <br /> w 9. The development to the south, Oneka Ponds, currently connects to the same 10" trunk line in <br /> Co <br /> an adjacent lot. The City is requiring, to avoid redundant connections and maintenance, that <br /> S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Shores of Oneka Lake\Engineers Memo Shores of Oneka Lake Pre Plat-PUD-20220504.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.