|
PLANT 5C;HF=[:)ULF=
<br /> TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER
<br /> RM 70 Acer rubrum 'Northwood' Northwood Red Maple 2.5" Cal. B&B
<br /> FM 42 Acer x freemanii 'Sienna' Sienna Glen Maple 2.5" Cal. B&B
<br /> RB 21 Betula nigra River Birch Multi-Trunk 8' Ht. B&B
<br /> Clump Form, 2.5" Cal Equivalent
<br /> HB 49 Celtis occidentalis Common Hackberry 2.5" Cal. B&B
<br /> HL 53 Gleditsia triacanthos inermis 'Harve' Northern Acclaim Thornless Honey Locust 2.5" Cal. B&B
<br /> 0 KC 57 Gymnocladus dioica 'Espresso' Kentucky Coffeetree 2.5" Cal. B&B
<br /> LANDSCAPE SPECIFICATIONS
<br /> 1. TREE PROTECTION. ALL TREES NOT SPECIFICALLY NOTED OR MARKED ON SITE FOR REMOVAL SHALL REMAIN PROTECTED AND WO 50 Quercus bicolor Swamp White Oak 2.5" Cal. B&B
<br /> UNDISTURBED DURING CONSTRUCTION. TREE PROTECTION SHALL EXTEND TO THE DRIP LINE, WITHIN WHICH NO CONSTRUCTION
<br /> ACTIVITY, MATERIAL STORAGE, OR VEHICLE PARKING SHALL BE PERMITTED. TREE PROTECTION FENCING SHALL BE ERECTED PRIOR
<br /> TO CONSTRUCTION START PER PLANS OR AS DIRECTED BY OWNER/LANDSCAPE ARCHITECT AND SHALL CONSIST OF 4' TALL
<br /> HEAVY DUTY ORANGE CONSTRUCTION FENCING WITH 6' STEEL FENCE POSTS SPACED 6' O.C. MAX.
<br /> RO 5 Quercus rubra Red Oak 2.5" Cal. B&B
<br /> 2. EROSION CONTROL. REFER TO CIVIL PLAN SHEETS FOR STORMWATER POLLUTION PREVENTION PLAN (SWPPP), AND TEMPORARY
<br /> AND PERMANENT STORMWATER BMPS, INCLUDING SILT FENCE, BIO-ROLLS, INLET PROTECTION, EROSION CONTROL BLANKETING,
<br /> DUST CONTROL, SWEEPING AND ROCK CONSTRUCTION ENTRANCE. ALL DISTURBED AREAS SHALL RECEIVE PERMANENT
<br /> STABILIZATION IN ACCORDANCE WITH THE LANDSCAPE PLAN WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE DISTURBED
<br /> AREA HAS CEASED. IN THE EVENT PERMANENT STABILIZATION CANNOT BE IMPLEMENTED WITHIN 7 DAYS, TEMPORARY BL 73 Tilia americana 'Boulevard' Boulevard Linden 2.5" Cal. B&B
<br /> STABILIZATION BMPS MUST BE IMPLEMENTED WITHIN 7 DAYS USING.
<br /> 3. CLEARING AND GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING ALL AREAS INDICATED AS BEING
<br /> DISTURBED OR OTHERWISE SHOWN ON PLANS. CLEARING AND GRUBBING SHALL INCLUDE REMOVAL AND DISPOSAL OF ALL TREES,
<br /> STUMPS, BRUSH, GRASS, ROOTS AND OTHER ORGANIC MATERIAL AT AN APPROVED OFF-SITE DISPOSAL LOCATION. AE 41 Ulmus americana 'Princeton' American Elm 2.5" Cal. B&B
<br /> 4. SOIL PREPARATION. REFER TO GEOTECHNICAL REPORT FOR ANY REQUIRED SOIL CORRECTIONS, AMENDMENTS OR ADDITIONAL
<br /> INFORMATION (IF APPLICABLE). EXISTING TOPSOIL SHALL BE STRIPPED FROM ALL DISTURBED AREAS AND STOCKPILED IN AN
<br /> APPROVED LOCATION FOR RE-SPREAD. ALL AREAS WHERE SOIL HAS BEEN COMPACTED BY CONSTRUCTION ACTIVITY AND THAT
<br /> ARE INDICATED TO BE SODDED, SEEDED OR PLANTING BED SHALL BE DE-COMPACTED TO A MINIMUM DEPTH OF 12 INCHES BY CONIFEROUS TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER
<br /> SOIL RIPPING, TILLING OR OTHER APPROVED SOIL LOOSENING METHOD.
<br /> WP 52 Pinus strobus White Pine 6' Ht. B&B
<br /> 5. TOPSOIL MATERIAL. ALL EXISTING, AMENDED OR IMPORTED TOPSOIL SHALL MEET THE REQUIREMENTS OF MNDOT TOPSOIL TYPE A.
<br /> A MINIMUM 4 INCH DEPTH OF TOPSOIL SHALL BE PLACED ON ALL AREAS TO BE SODDED OR SEEDED. A MINIMUM 12 INCH DEPTH 3 r
<br /> OF TOPSOIL SHALL BE PLACED WITHIN ALL PLANTING BED AREAS. ALL TOPSOIL SHALL BE FINE GRADED, RAKED AND DRAGGED
<br /> TO PROVIDE A SMOOTH, UNIFORM SURFACE. TOPSOIL GRADES SHALL BE WITHIN .1 FEET OF INDICATED FINISHED GRADE AND
<br /> SHALL BE TRUE TO GRADIENTS SHOWN ON PLANS. REFER TO CIVIL PLAN SHEETS FOR FILTRATION BASIN SOIL REQUIREMENTS. ORNAMENTAL TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER
<br /> 6. SEEDING AND TURF ESTABLISHMENT. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES SB 6 Amelanchier x grandiflora Autumn Brilliance' Autumn Brilliance Serviceberry 7' Ht. B&B
<br /> AND TOPSOIL PREP PRIOR TO SEEDING. APPLY 12-12-12 GRANULAR STARTER FERTILIZER AT A RATE OF 250 LBS PER ACRE Clump Form, Red Fall Color, 1.5" Cal
<br /> PRIOR TO SEEDING.. SEEDS SHALL BE SOWED IN 2 PERPENDICULAR PASSES, EACH PASS AT ONE-HALF THE INDICATED RATE, VIA Equivalent
<br /> BROADCAST SPREADER, DROP SEEDER OR DRILL SEEDER. FOLLOWING SEED APPLICATION, INSTALL TYPE 3N EROSION CONTROL q
<br /> BLANKET ON ALL SLOPES GREATER THAN 4:1. IN ALL OTHER AREAS, APPLY HYDROMULCH COVER (MUST BE A SEPARATE
<br /> OPERATION FROM SEEDING) AT A TARGETED DRY WEIGHT RATE OF 3500 LBS PER ACRE. SOIL SHALL BE KEPT MOIST DURING PD 3 Corpus alternifolia 'Wstackman' Golden Shadows Pagoda Dogwood 1.5" Cal. B&B
<br /> ESTABLISHMENT WITH ADDITIONAL RE-SEEDING AS NECESSARY TO ACHIEVE A HEALTHY, UNIFORM STAND OF GRASS, FREE OF Pale Yellow Flowers, Maroon Fall Color
<br /> WEEDS AND WITH COVERAGE EXCEEDING 75% IN ANY 10'x10' AREA PRIOR TO FINAL ACCEPTANCE.
<br /> 7. SODDING. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES AND TOPSOIL PREP PRIOR
<br /> TO SODDING. APPLY 12-12-12 GRANULAR STARTER FERTILIZER AT A RATE OF 250 LBS PER ACRE PRIOR TO SODDING AND ROLL CA 2 Malus x 'Prairifire' Prairifire Crabapple 1.5" Cal. B&B
<br /> TOPSOIL TO CREATE A UNIFORM SURFACE FOR LAYING SOD. SOD SHALL NOT BE CUT MORE THAN 24-HOURS IN ADVANCE OF Red Flowers
<br /> INSTALLATION. CONTRACTOR SHALL KEEP SOD MOIST FOR A MINIMUM OF 30 DAYS AND SHALL BE RESPONSIBLE FOR MAINTAINING
<br /> THE SOD UNTIL FINAL ACCEPTANCE.
<br /> 8. PLANT MATERIAL. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," ANSI-Z60, GROUND COVERS CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER
<br /> LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS
<br /> FOR PLANT MATERIALS. OWNER/LANDSCAPE ARCHITECT RESERVE THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED TI 244,659 sf Type I -Turf Seed Mix MnDOT Seed Mix 25-151 seed
<br /> UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. NO SUBSTITUTION OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS Refer to notes for acceptable seeding
<br /> APPROVED IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. methods
<br /> 9. PLANT MATERIAL SUBSTITUTIONS. ALL REQUESTS FOR PLANT SUBSTITUTIONS SHALL BE MADE IN WRITING TO THE I I Seeding Rate 180 Ib/ac
<br /> OWNER/LANDSCAPE ARCHITECT AND MUST BE APPROVED BY THE CITY. TII 282,149 sf Type II - Stormwater Seed Mix MnDOT Seed Mix 33-261 seed
<br /> 10. PLANT INSTALLATION AND ESTABLISHMENT. REFER TO STANDARD PLANTING DETAILS. CONTRACTOR SHALL STAKE TREE LOCATIONS Refer to notes for acceptable seeding
<br /> FOR APPROVAL BY OWNER/LANDSCAPE ARCHITECT PRIOR TO PLANTING. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR Bob" methods. Seeding Rate 52.0 Ib/ac
<br /> DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH , , TIII 1,851,518 sf Type III - Native Construction Seed Mix MnDOT Seed Mix 32-241 seed
<br /> MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE. ' Refer to notes for acceptable seeding
<br /> 11. MULCH MATERIAL. DOUBLE SHREDDED HARDWOOD MULCH OR ROCK MULCH AS INDICATED ON PLANS. ALL MULCH SHALL BE ' methods. Seeding Rate 57.0 Ib/ac
<br /> CLEAN AND FREE OF NOXIOUS WEEDS, SOIL, OR OTHER DELETERIOUS MATERIAL, AND SHALL BE INSTALLED OVER A NON-WOVEN TIV 482,160 sf Type IV- Buffer Seed Mix MnDOT Seed Mix 35-241 seed
<br /> GEOTEXTILE FABRIC (INCIDENTAL) OR OTHER APPROVED WEED BARRIER TO A MINIMUM SETTLED DEPTH OF 4". MULCH SHALL BE seeding
<br /> o no Refer to for acceptable
<br /> HELD BACK FROM PLANT STEMS/TRUNKS A MINIMUM OF 3". WOOD MULCH SHALL BE PLACED AROUND INDIVIDUAL TREES TO A 4' p g
<br /> MINIMUM DIAMETER. MULCH SHALL BE INSTALLED WITHIN 48-HOURS OF PLANT INSTALLATION. methods. Seeding Rate 55.0 Ib/ac
<br /> 12. LANDSCAPE EDGING. INSTALL LANDSCAPE EDGING BETWEEN ALL MULCH AREAS AND TURF. EDGING SHALL BE COMMERCIAL GRADE
<br /> BLACK POLYETHYLENE OR VINYL EDGING, 0.1 INCH THICK BY 5 INCHES DEEP, V-LIPPED BOTTOM, HORIZONTALLY GROOVED,
<br /> 1-INCH ROUND TOP, EXTRUDED IN STANDARD LENGTHS, WITH 9-INCH STEEL ANGLE STAKES.
<br /> 13. IRRIGATION. DESIGN, FURNISH AND INSTALL A COMPLETE UNDERGROUND IRRIGATION SYSTEM FROM APPROVED
<br /> POINT(S)-OF-CONNECTION WITHIN THE SITE COVERING ALL TURF AND PLANTING AREAS AS SHOWN ON THE LANDSCAPE PLAN.
<br /> INCLUDES FLOW/PRESSURE TESTING, PLANS WITH DESIGN CALCULATIONS, AS-BUILT DRAWINGS, LABOR, MATERIALS, EQUIPMENT,
<br /> AND SERVICES FOR THE TESTING, ADJUSTING, RETESTING AND READJUSTING AS REQUIRED TO PLACE THE SYSTEM IN AN
<br /> APPROVED OPERATING CONDITION. THE IRRIGATION SYSTEM SHALL INCLUDE THE DESIGN AND INSTALLATION OF THE FOLLOWING:
<br /> PIPING, METER AND BACKFLOW ASSEMBLIES, SPRINKLER HEADS, CABINETS, VALVES AND VALVE BOXES, CONTROLLERS, CONTROL
<br /> WIRING, FITTINGS, ELECTRICAL CONNECTIONS, QUICK-COUPLERS, ALL OTHER NECESSARY ACCESSORIES, SYSTEM MANUALS, 1-YEAR
<br /> MAINTENANCE PERIOD INCLUDING 1 FALL WINTERIZATION AND 1 SPRING START-UP. IRRIGATION PLANS TO BE PREPARED BY A
<br /> QUALIFIED IRRIGATION DESIGNER AND SUBMITTED TO OWNER/LANDSCAPE ARCHITECT FOR APPROVAL.
<br /> 14. MAINTENANCE. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL
<br /> SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE,
<br /> AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE MOWING, TRIMMING, WATERING, I. SCARIFY BOTTOM AND SIDES OF HOLE
<br /> FERTILIZING, WEED AND PESTICIDE CONTROL, MULCHING, REMOVAL OF DEAD MATERIALS, RE-SETTING PLANTS TO PROPER GRADE PRIOR TO PLANTING NOTE GUY ASSEMBLY OPTIONAL BUT
<br /> a CONTRACTOR ASSUMES FULL
<br /> AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES, 2. TRIM OUT DEAD WOOD AND WEAK AND/OR RESPONSIBILITY FOR MAINTAINING TREE
<br /> HOWEVER, THE CONTRACTOR SHALL RETAIN RESPONSIBILITY FOR ALL PLANT MATERIAL THROUGH THE COMPLETION OF THE \ IN A PLUMB POSITION FOR THE
<br /> WARRANTY PERIOD. DEFORMED TWIGS. DO NOT GUT A LEADER. DO NOT PAINT GUTS. DURATION OF THE GUARANTEE PERIOD
<br /> 15. WATERING. UPON ESTABLISHMENT OF SEED AND INSTALLATION OF PLANTS, CONTRACTOR SHALL MAINTAIN A WATERING SCHEDULE PLAN 3. SET PLANT ON UNDISTURBED NATIVE SOIL GUY ASSEMBLY- I&`
<br /> WHICH WILL THOROUGHLY WATER ALL PLANTS AND TURF AREAS A MINIMUM OF ONCE A WEEK. MORE FREQUENT WATERING MAY OR THOROUGHLY COMPACTED BAGKFILL SOIL. POLYPROPYLENE OR POLYETHYLENE
<br /> BE REQUIRED DURING PERIODS OF HOT, DRY WEATHER. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. INSTALL PLANT SO THE ROOT FLARE IS AT OR (40 MIL)1-112" WIDE STRAP(TYP)
<br /> IN THE ABSENCE OF PERMANENT IRRIGATION, TEMPORARY IRRIGATION, TREE WATERING BAGS, OR HAND-WATERING ARE 5 2-PLY NYLON STRAPS UP TO 2 ABOVE THE FINISHED GRADE. DOUBLE STRAND 10 GA. WIRE,ROLLED STEEL POSTS(MNDOT 34 3401)
<br /> ACCEPTABLE. 4. PLACE PLANT IN PLANTING HOLE WITH (4 lea,O.G. (SEE STAKING DIAGRAM)
<br /> DOUBLE STRAND 12 GAUGE WIRE BURLAP AND WIRE BASKET, (IF USED), INTACT.
<br /> 16. NATIVE PLANT ESTABLISHMENT. THIS PROJECT INCLUDES ONE OR MORE NATIVE PLANT SEED MIXES CONSISTING OF A VARIETY OF PAINTED FLUORESCENT ORANGE BAGKFILL WITHIN APPROXIMATELY 12" OF THE COORDINATE
<br /> GRASSES, SEDGES AND FLOWERING FORBS. BECAUSE THESE PLANTS TYPICALLY HAVE A LONGER GERMINATION PERIOD, A COVER TOP OF ROOTBALL, WATER PLANT. REMOVE STAKING TO INSURE
<br /> CROP SPECIES IS REQUIRED TO PROVIDE TEMPORARY COVER AND STABILIZATION. MAINTENANCE OF THESE SEEDED AREAS IS WHITE FLAGGING (TYP.) TOP I/3 2 12 UNIFORM
<br /> CRITICAL DURING THE FIRST SEVERAL YEARS TO ESTABLISH A SUCCESSFUL NATIVE PLANT COMMUNITY. SEEDED AREAS SHALL BE �4� TREE WRAP OF THE BASKET HORIZONTAL RINGS,
<br /> THE TOP TWO ORIENTATION OF GUY
<br /> WHICHEVER IS GREATELE, 12 LINES AND STAKES
<br /> MOWED / WEED-WHIPPED TO A HEIGHT OF 6-10 INCHES IN MID-JULY AND EARLY SEPTEMBER DURING THE FIRST 2-3 YEARS REMOVE ALL BURLAP AND NAILS FROM TOP Ly
<br /> OF ESTABLISHMENT. IN ADDITION, ALL NON-NATIVE SPECIES WEEDS SHALL BE SPOT SPRAYED NO LESS THAN 3 TIMES A YEAR 4 INCHES HARDWOOD MULCH /3 OF THE BALL. REMOVE ALL TWINE.
<br /> / �� 4 INCH DEEP SAUCER =_ STAKING DIAGRAM
<br /> WITH HERBICIDE BY A LICENSED APPLICATOR. RE-SEEDING AS NECESSARY SHALL OCCUR IN MAY. A NATIVE PLANT COMMUNITY .. 12 - 5. PLUMB AND BAGKFILL WITH
<br /> SHALL BE CONSIDERED SUCCESSFULLY ESTABLISHED NO SOONER THAT 3 YEARS AFTER INITIAL SEEDING - ONCE THE COVER Z 8 STEEL TEE POST- BAGKFILL SOIL. GUT WIRE WITH WEBBING
<br /> CROP HAS BEEN SUFFICIENTLY REPLACED BY NATIVE PLANTS AND THE AREA IS FREE OF ALL NON-NATIVE AND INVASIVE 3 REQUIRED AT 120 6. WATER TO SETTLE PLANTS AND FILL .� FLAGGING- ONE PER WIRE
<br /> SPECIES. AT THIS TIME, MAINTENANCE CAN BE REDUCED TO MOWING / WEED-WHIPPING TO A HEIGHT OF 6-10 INCHES ONCE A
<br /> BAGKFILL MIX VOIDS. 4'-r,' SHREDDED BARK
<br /> CIAYEAR IN EARLY SEPTEMBER AND SPOT SPRAYING OF HERBACIDE ONLY AS NEEDED. UNDISTURBED SUBSOIL 1. WATER WITHIN TWO HOURS OF _ �exISTING GRADE
<br /> INSTALLATION. WATERING MUST BE ,k._
<br /> 17. FINAL ACCEPTANCE. UPON SUBSTANTIAL COMPLETION OF THE WORK, CONTRACTOR SHALL REQUEST FINAL ACCEPTANCE OF THE SUFFICIENT TO THOROUGHLY SATURATE : ® MINIMUM 1/2 WIDTH OF ROOT BALL
<br /> REMOVE BURLAP ; ROPE ROOT BALL AND PLANTING HOLE. =III
<br /> WORK IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT. IF ANY WORK IS FOUND TO BE INCOMPLETE OR UNSATISFACTORY IN FROM TOP 1/3 OF THE BALL 8. PLACE MULCH WITHIN 48 HOURS OF I PLANTING SOIL MIXTURE (SEE SPEC.)
<br /> � IIIIIIIIIII IIIIIIII�II I�IIIII�IIIIII
<br /> THE OPINION OF THE OWNER/LANDSCAPE ARCHITECT, A WRITTEN PUNCH LIST WILL BE PREPARED LISTING ALL ITEMS THAT THE SECOND WATERING UNLESS SOIL ��UNDISTURBED OR STABILIZED
<br /> REQUIRE COMPLETING OR CORRECTING BEFORE FINAL ACCEPTANCE. NOTE SEE PLANTING NOTES FOR THE TYPE OF MULCH MATERIAL TO USE. MOISTURE IS EXCESSIVE. SUBSOIL
<br /> 18. WARRANTY. ALL PLANTS, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR FROM THE DATE OF FINAL DECIDUOUS TREE PLANTING DETAIL CONIFEROUS TREE PLANTING DETAIL
<br /> ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR
<br /> AND MATERIAL. A NOT TO SCALE B NOT TO SCALE
<br /> 3890 PHEASANT RIDGE DR NE Revisions:
<br /> I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA Drawn: RJR 1. 2/25/22 Revise Layout per City Comments. L4
<br /> ENGINEERING SUITE100 y p y M I HOMES OF MINNEAPOLIS LLC PRELIMINARY
<br /> CARLSON BLAINE MN 55449 or report was prepared by me or under my 2. 4/27/22 Revise Layout per City Comments. THE SHORES OF O N E KA LAKE
<br /> SURVEYING direct supervision and that I am a duly Signature: 12 Designed: RJR of
<br /> TEL763.489.790o p y 5354 Parkdale Drive #100
<br /> M CAI N ENVIRONMENTAL FAX763.489.7959 Licensed Landscapetale of
<br /> sofa Hugo, Minnesota LANDSCAPE PLAN 4
<br /> CARLSONMCCAIN.COM the laws of the State of Minnesota Date: 10/21/21 License #: 56346 Date: 10/21/21 St. Louis Park, Minnesota 55416
<br /> Save Date: 04/27/22 f:\jobs\8861-8880\8869-dell webb-hugo\cad c3d\landscape\8869_landscape-old.dwg #8869
<br />
|