Laserfiche WebLink
wsb <br /> May 4, 2022 <br /> Ms. Rachel Juba <br /> Community Development Director <br /> City of Hugo <br /> 14669 Fitzgerald Avenue North <br /> Hugo, MN 55038 <br /> Re: Site Plan Review <br /> Liberty Classical Academy <br /> WSB Project No. 020119-000 <br /> ° Dear Ms. Juba: <br /> U <br /> w We have reviewed the site plan submittal for the Liberty Classical Academy site located east of <br /> Keller Avenue/County Road 57 and north of 122"d Street/County Road 7. In particular, we have <br /> reviewed the following plans related to this particular request: <br /> 0 <br /> LO <br /> • Civil Plan Set(Liberty Classcial Academy- Civil Plans 4-11-22 bcwd revs.pdf) dated <br /> cc <br /> 4/11/2022 by Larson Engineering <br /> CO0 Stormwater Report Liberty(Classical Academy Stormwater Report 2022.04.10.pdt) dated <br /> 4/10/2022 by Larson Engineering <br /> Based on the review of the above documents, we offer the following comments related to this <br /> application: <br /> LO <br /> Grading, Street, and Utility Plans <br /> J <br /> a1. Applicant is proposing to expand their eastern parking lot to the north while constructing a <br /> new drop-off area and playground. <br /> Q 2. Applicant is proposing to maintain the two accesses (one-way in, one-way out)that exist <br /> rn along 122"d Street/County Road 7. <br /> 3. Applicant is proposing two centrally located rows of parking (52 spaces total)with a circling <br /> CD <br /> CD drop-off area to replace the previous 30-some spaces distributed between three rows <br /> N <br /> W including up against the school. The new configuration allows for a much easier turnaround <br /> D and a designated area for drop off. <br /> 4. Applicant is proposing installing curb around the perimeter which better directs drainage and <br /> creates a barrier for dropping off students. <br /> W 5. Water service to the site is provided through an onsite well while sanitary sewer service to the <br /> W <br /> site is achieved through an on-site septic system with drain fields. The utilities are not <br /> U) proposed to be impacted with the project. <br /> 6. Detailed redline comments have been provided on the plans and sent to the applicants <br /> W engineer so they can be addressed in future submittals. <br /> 00 <br /> C:\Users\rachel.juba\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\O7PY7DSU\020119-000 LTR RJuba-Liberty Classical Academy 2022-05- <br /> 04.docx <br />