My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 052622
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 052622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:15:00 PM
Creation date
3/21/2024 10:15:33 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/26/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• It is likely that county road improvements in this area in the future could include dedicated left and right turn <br /> lanes from CSAH 7 (122"d St)to CR 57 (Keller Ave). Because both of the existing school driveways are within the <br /> extent of the future right turn lane for CR 57, construction of such turn lanes could also cause some safety and <br /> operational concerns for the driveways if they are not relocated. <br /> • The cost of any future turn lanes serving the school site driveways would be borne by the driveway owner, <br /> however we are not requiring such construction at this time because, as noted above,these are preexisting <br /> driveways maintaining the same usage, and therefore not requiring a new access permit at this time. <br /> • As the site expands and its traffic increases, it would be beneficial to remove the direct driveway access(es)from <br /> CSAH 7 (122"d St) and instead service the site via CR 57 (Keller Ave). Doing so would further elongate the <br /> internal loop thus allowing more internal stacking, and also allow for the driveway to connect to a road with <br /> significantly lower volumes and lower operating speeds. <br /> Ensuring safe operations around schools is of paramount importance, and such issues can be much more difficult to <br /> address traffic issues once site plans and permits are finalized, so we thank you again for the opportunity to review and <br /> comment on this proposal. Please feel free to contact us with any questions. <br /> Joe Gustafson, PE, PTOE I Traffic Engineer <br /> Washington County Public Works—Traffic Operations <br /> 11660 Myeron Road North, Stillwater, MN 55082 <br /> Main: 651-430-4300 1 Direct: 651-430-4351 <br /> A great place to live, work and play...today and tomorrow <br /> From: Rachel Juba <RJuba@ci.hugo.mn.us> <br /> Sent:Tuesday, May 3, 2022 3:15 PM <br /> To:Joe Gustafson <Joe.Gustafson@co.washington.mn.us> <br /> Subject: RE: Liberty Academy-Site Plan <br /> 'External message alert:This message originated from outside the Washington County email system. Use caution <br /> when clicking hyperlinks, downloading pictures or opening attachments.*** <br /> Joe: <br /> Just making sure you received this email. Let me know if you have any questions. <br /> Thanks, <br /> RACHELJUBA <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> CITY OF HUGO- MINNESOTA <br /> 14669 Fitzgerald Ave. N., Hugo, MN 55038 <br /> o: 651.762.6304 1 www.ci.hugo.mn.us <br /> From: Rachel Juba <br /> Sent: Wednesday, April 27, 2022 10:15 AM <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.