STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE, CONTINUEDPOLLUTION PREVENTION NOTES (CONT.)3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CREATING AND FOLLOWING A WRITTEN DISPOSAL PLAN FOR ALL HAZARDOUS WASTE MATERIALS. THE PLAN SHALL INCLUDE HOW THE MATERIAL SHALL BE DISPOSED OF AND THELOCATION OF THE DISPOSAL SITE AND SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO WORK ON SITE. LEAKS, SPILLS, OR OTHER RELEASES SHALL BE RESPONDED TO IN ACCORDANCE WITH MPCA SPILL CONTAINMENT ANDREMEDIAL ACTION PROCEDURES.4.THE CONTRACTOR SHALL USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT DISCHARGE OR PLACEMENT OF BITUMINOUS GRINDINGS, CUTTINGS, MILLINGS, AND OTHER BITUMINOUS WASTES FROM AREAS OFEXISTING OR FUTURE VEGETATED SOILS, AND ALL WATER CONVEYANCE SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES.5.THE CONTRACTOR SHALL USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST, PARTICLES, SAW CUT SLURRY, PLANING WASTE AND OTHER CONCRETE WASTES FROM LEAVING PUBLIC RIGHT OF WAY,DEPOSITING IN EXISTING OR FUTURE VEGETATED AREAS OR ENTERING STORMWATER CONVEYANCE SYSTEM INCLUDING INLETS AND CURB FLOW LINES. ONSITE RELEASE OF CONCRETE SLURRY IS PERMISSIBLE IF MINNESOTAPOLLUTION CONTROL GUIDANCE FOR ROAD CONSTRUCTION CONCRETE SLURRY AND THE REQUIREMENTS OF THE SPECIAL PROVISIONS ARE FOLLOWED.EROSION CONTROL SUPERVISOR, INSPECTIONS AND MAINTENANCE NOTES1.IN ACCORDANCE WITH SPEC. 2573.3 A1, THE CONTRACTOR SHALL PROVIDE A CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO IS KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSIONPREVENTION AND SEDIMENT CONTROL BMPS. PROVIDE PROOF OF CERTIFICATION (UNIVERSITY OF MINNESOTA - CONSTRUCTION SITE MANAGEMENT) AT THE PRECONSTRUCTION MEETING. WORK SHALL NOT BE ALLOWED TOCOMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED. THE EROSION CONTROL SUPERVISOR IS INCIDENTAL.2.THE EROSION CONTROL SUPERVISOR SHALL WORK WITH THE PROJECT ENGINEER TO OVERSEE THE IMPLEMENTATION OF THE SWPPP AND THE INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTIONAND SEDIMENT CONTROL BMPS BEFORE, DURING AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA.3.THE EROSION CONTROL SUPERVISOR IS RESPONSIBLE FOR COMPLYING WITH ALL THE INSPECTION AND MAINTENANCE REQUIREMENTS STATED IN THE NPDES PERMIT PART IV. E. INSPECTIONS OF THE ENTIRE CONSTRUCTION SITESHALL OCCUR A MINIMUM OF ONCE EVERY SEVEN DAYS (3 DAYS FOR PROHIBITED WATERS) DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS (IN NOCASE SHALL THE TIME BETWEEN INSPECTIONS EXCEED 7 DAYS; 3 DAYS FOR PROHIBITED WATERS). RAINFALL AMOUNTS SHALL BE OBTAINED USING A PROPERLY MAINTAINED RAIN GAUGE ONSITE OR BY A WEATHER STATIONTHAT IS WITHIN ONE MILE. THE EROSION CONTROL SUPERVISOR SHALL THOROUGHLY INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO ENSURE INTEGRITY AND EFFECTIVENESS OF EACH BMP.4.ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION SHALL BE RECORDED IN WRITING WITHIN 24 HOURS AND THESE RECORDS SHALL BE RETAINED WITH THE SWPPP. INSPECTION REPORTS SHALL BESUBMITTED TO THE PROJECT ENGINEER AND SWPPP DESIGNER IN A FORMAT APPROVED BY THE ENGINEER. INSPECTION RECORDS SHALL INCLUDE:A.DATE AND TIME OF INSPECTIONS;B.NAME OF PERSONS CONDUCTING INSPECTIONS;C.FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS;D.CORRECTIVE ACTIONS TAKEN INCLUDING DATES, TIMES, AND THE PARTY COMPLETING MAINTENANCE ACTIVITIES;E.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS;F.LOCATION, DESCRIPTION AND PHOTO OF ANY DISCHARGES OFF THE PROJECT SITE.G.DOCUMENTS AND CHANGES MADE TO THE SWPPP.5.THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING INSPECTION AND MAINTENANCE REQUIREMENTS (INSPECTIONS MAY BE REDUCED UNDER CERTAIN CONDITIONS AS COVER IS ESTABLISHED AND CONDITIONS CHANGEAS DESCRIBED IN PART IV. E OF THE NPDES PERMIT):A.SILT FENCE SHALL BE REPAIRED, REPLACED OR SUPPLEMENTED WHEN IT BECOMES NONFUNCTIONAL OR SEDIMENT REACHES 1/2 THE HEIGHT OF THE SILT FENCE. REPAIRS SHALL BE MADE WITHIN 24 HOURS OFDISCOVERY.B.INLET PROTECTION DEVICES SHOULD BE REPAIRED WHEN THEY BECOME NONFUNCTIONAL OR SEDIMENT REACHES 1/2 THE HEIGHT AND/OR DEPTH OF THE DEVICE.C.TEMPORARY SEDIMENT BASINS, IF REQUIRED, SHALL HAVE THE SEDIMENT REMOVED ONCE THE SEDIMENT HAS REACHED 1/2 THE STORAGE VOLUME WITHIN 72 HOURS OF DISCOVERY.D.REMOVE ANY SEDIMENT DEPOSITED IN SURFACE WATERS. SEDIMENT SHALL BE REMOVED AND ANY AREA DISTURBED BY THE REMOVAL RESTABILIZED WITHIN 7 DAYS OF DISCOVERY. A SITE MANAGEMENT PLAN ISREQUIRED FOR WORK IN ANY SURFACE WATER AND APPROPRIATE AUTHORITIES SHALL BE CONTACTED PRIOR TO COMMENCING WORK.E.TRACKED SEDIMENT SHALL BE REMOVED WITHIN 24 HOURS OF DISCOVERY OF TRACKING ONTO PAVED SURFACES.F.ALL OTHER NONFUNCTIONAL BMPS SHALL BE REPAIRED, REPLACED, OR SUPPLEMENTED WITHIN 24 HOURS OF DISCOVERY.G.REINSTALL AS QUICKLY AS POSSIBLE ANY BMP REMOVED TO ACCOMMODATE SHORT TERM ACTIVITIES.H.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THEMPCA IN ACCORDANCE WITH NPDES PERMIT OR PART II.C OF THE CONSTRUCTION GENERAL PERMIT. SEDIMENT REMOVAL AND MAINTENANCE OF BMPS IS INCIDENTAL.6.CLEAN OUT ALL PERMANENT STORMWATER BASINS REGARDLESS OF WHETHER USED AS A TEMPORARY SEDIMENT BASIN OR SEDIMENT TRAP TO THE DESIGN CAPACITY AFTER ALL UPGRADIENT LAND DISTURBING ACTIVITY ISCOMPLETED.STABILIZATION AND SEDIMENT CONTROL NOTES1.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS NECESSARY TO MINIMIZE EROSION FROM DISTURBED SURFACES AND CAPTURE SEDIMENT ONSITE. ALL EROSION CONTROL MEASURES SHALL BEIN PLACE PRIOR TO ANY REMOVAL WORK AND/OR GROUND DISTURBING ACTIVITIES AND SHALL BE MAINTAINED UNTIL THE POTENTIAL FOR EROSION HAS BEEN ELIMINATED. IF SEDIMENT CONTROLS ARE OVERLOADED (BASEDON FREQUENT FAILURE OR EXCESSIVE MAINTENANCE), ADDITIONAL UPGRADIENT OR REDUNDANT BMPS SHALL BE PLACED.2.SEDIMENT CONTROL DEVICES SHALL BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE ANY UP GRADIENT LAND DISTURBING ACTIVITIES BEGIN. SEDIMENT CONTROL DEVICES INCLUDE, BUT ARE NOT LIMITED TOTHE FOLLOWING:A.PERIMETER CONTROL SHALL BE LOCATED ON THE CONTOUR TO CAPTURE OVERLAND, LOW-VELOCITY SHEET FLOWS DOWN GRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE WATERS. THE BMPSHALL BE J-HOOKED AT A MAXIMUM OF 100 FOOT INTERVALS AND EACH SECTION SHALL CONTAIN NO MORE THAN 1/4 ACRE OF DRAINAGE AREA.B.SEDIMENT DAMAGE FROM STOCKPILES SHALL BE MINIMIZED BY PLACING A ROW OF SUPER DUTY SILT FENCE A MINIMUM 5 FEET FROM THE TOE. IF THERE IS NOT ADEQUATE PROJECT AREA TO PLACE THE SILT FENCEMORE THAN 5 FEET FROM THE TOE OF THE SLOPE, THE CONTRACTOR MAY SUBMIT AN ALTERNATIVE TO THE PROJECT ENGINEER FOR APPROVAL.C.DITCH CHECKS (IF REQUIRED) SHALL BE PLACED AS INDICATED ON THE PLANS DURING ALL PHASES OF CONSTRUCTION.C.A.TEMPORARY DITCH CHECKS (IF REQUIRED) SHALL CONSIST OF USING ROCK DITCH CHECKS, SEDIMENT CONTROL LOGS AND ROCK WEEPERS IN FRONT OF CULVERT INLETS. IN LIEU OF REMOVING TEMPORARY DITCHCHECKS, THE ROCK MAY BE PUSHED INTO THE GROUND.C.B.FILTER LOGS (IF REQUIRED) SHALL BE PLACED DURING PERMANENT TURF ESTABLISHMENT AT THE INTERVALS IDENTIFIED IN THE PLAN.D.FLOTATION SILT CURTAIN MAY BE USED AS PERIMETER CONTROL BUT ONLY FOR WORK ON THE SHORELINE OR BELOW THE WATERLINE. IMMEDIATELY AFTER THE CONSTRUCTION IN THE AREA IS COMPLETE, AN UPLANDBMP SHALL BE PLACED IF EXPOSED SOILS CONTINUE TO DRAIN TO THE SURFACE WATER.E.TEMPORARY SEDIMENT BASINS ARE REQUIRED WHERE TEN OR MORE ACRES DRAIN TO A COMMON LOCATION (FIVE IF DRAINING TO A SPECIAL OR IMPAIRED WATER).DATE AND AMOUNT OF ALL RAINFALL EVENTSGREATER THAN 0.5 INCH IN 24 HOURS;E.A.BASIN VOLUME SHALL BE A MINIMUM OF 1,800 CUBIC FEET PER ACRE OF DRAINAGE AREA TO THE BASIN (3,600 CUBIC FEET PER ACRE IF NO CALCULATIONS ARE PERFORMED)E.B.OUTLET SHALL ALLOW COMPLETE DRAWDOWN FOR MAINTENANCE AND A STABILIZED OVERFLOW. THE OUTLET SHALL WITHDRAW WATER FROM THE SURFACE EXCEPT DURING FROZEN CONDITIONS.E.C.IF A TEMPORARY BASIN OF THE REQUIRED SIZE IS INFEASIBLE THE REASONS SHALL BE DOCUMENTED IN THE SWPPP AND ALTERNATE BMPS SHALL BE PLACED.3.PRESERVE A NATURAL BUFFER OF AT LEAST 50 FEET (100 FEET IF WITHIN 1 MILE OF AND DRAINS TO A SPECIAL OR IMPAIRED WATER) BETWEEN DISTURBED AREAS AND FLOWS TO A SURFACE WATER (NOT REQUIRED AT DITCHESOR STORMWATER CONVEYANCE CHANNELS, STORM DRAIN INLETS OR SEDIMENT BASINS). IF A BUFFER IS INFEASIBLE, PROVIDE AS LARGE A BUFFER AS POSSIBLE AND REDUNDANT SEDIMENT CONTROLS.4.STORM SEWER INLETS SHALL BE PROTECTED AT ALL TIMES WITH THE APPROPRIATE INLET PROTECTION FOR EACH SPECIFIC PHASE OF CONSTRUCTION. PROVIDE INLET PROTECTION DEVICES WITH EMERGENCY OVERFLOWCAPABILITIES. SILT FENCE PLACED IN THE INLET GRATE IS NOT AN ACCEPTABLE INLET PROTECTION BMP FOR GRADING OPERATIONS (THIS BMP SHALL BE ACCEPTED ONLY FOR SHORT INTERVALS DURING MILLING OR PAVINGOPERATIONS). INLET PROTECTION DEVICES MAY NEED TO BE PLACED MULTIPLE TIMES IN THE SAME LOCATION OVER THE LIFE OF THE CONTRACT. INLET PROTECTION DEVICES SHALL BE PAID FOR ONCE PER INLET REGARDLESS OFTHE NUMBER OF TIMES THE BMP IS PLACED. ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE KEPT IN GOOD FUNCTIONAL CONDITION AT ALL TIMES. IF THE PROJECT ENGINEER DEEMS AN INLET PROTECTION DEVICE TOBE NONFUNCTIONAL, IN POOR CONDITION, INEFFECTIVE OR NOT APPROPRIATE FOR THE CURRENT CONSTRUCTION ACTIVITIES IT SHALL BE REPLACED WITH A SUITABLE ALTERNATIVE AT NO COST TO THE OWNER.5.PAVEMENT SURFACES SHALL BE SWEPT WITHIN 24 HOURS OF DISCOVERY OF SEDIMENT OR TRACKING ONTO PAVEMENT THAT DRAINS TO CURB, INLETS, DITCHES OR PONDS. PAVEMENT SHALL BE LIGHTLY WETTED PRIOR TOSWEEPING. THIS WORK IS INCIDENTAL.6.OUTLETS INTO SURFACE WATERS SHALL BE STABILIZED WITH ENERGY DISSIPATION WITHIN 24 HOURS OF BEING CONSTRUCTED.7.DITCHES AND EXPOSED SOILS SHALL BE KEPT IN AN EVEN ROUGH GRADED CONDITION IN ORDER TO BE ABLE TO APPLY EROSION CONTROL MULCHES AND BLANKETS.8.INITIATE STABILIZATION OF ALL EXPOSED SOIL AND STOCKPILE AREAS IMMEDIATELY AFTER CONSTRUCTION ACTIVITY ON THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY OR PERMANENTSTABILIZATION SHALL BE COMPLETED WITHIN NO MORE THAN 14 DAYS (7 DAYS IF IT IS WITHIN 1 MILE OF AND DRAINS TO A SPECIAL OR IMPAIRED WATER). ALL EXPOSED SOIL WITHIN 200 LINEAL FEET OF AND DRAINING TO APUBLIC WATER WITH "WORK IN WATER RESTRICTIONS" AND DURING SPECIFIED FISH SPAWNING TIME FRAMES, SHALL BE STABILIZED WITHIN 24 HOURS. IN MANY INSTANCES, THIS SHALL REQUIRE STABILIZATION TO OCCURMORE THAN ONCE DURING ROUGH GRADING. RAPID STABILIZATION METHOD 3 SHALL BE USED TO PROVIDE TEMPORARY COVER IN THESE AREAS AS APPROPRIATE. SUBSTITUTE SEED MIXTURE 21-112 OR 21-111 FOR THESPECIFIED SEED MIXTURE AS APPROPRIATE FOR THE SEASON. SEE NPDES PERMIT FOR EXCEPTIONS.9.THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH THAT DRAINS WATER FROM THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE CONSTRUCTION SITE, SHALL BE STABILIZEDWITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR POINT OF DISCHARGE TO ANY SURFACE WATER. STABILIZATION SHALL OCCUR WITHIN 24 HOURS OF CONNECTION TO A SURFACE WATER, EXISTING GUTTER, STORMSEWER INLET, DRAINAGE DITCH, OR OTHER STORMWATER CONVEYANCE SYSTEM ACCORDING TO SPEC 1717.2. RAPID STABILIZATION METHOD 4 SHALL BE USED TO STABILIZE THESE AREAS (SUBSTITUTE SEED MIXTURE 21-112 OR21-111 FOR THE SPECIFIED SEED MIXTURE AS APPROPRIATE FOR THE SEASON). THE REMAINDER OF THE DITCH SHALL BE STABILIZED WITHIN 14 DAYS (7 DAYS IF IT IS WITHIN 1 MILE OF AND DRAINS TO A SPECIAL OR IMPAIREDWATER)OF CONNECTING TO THE SURFACE WATER. PERMANENT EROSION CONTROL BLANKET OR RAPID STABILIZATION METHOD 4 (SUBSTITUTE SEED MIXTURE 21-112 OR 21-111 FOR THE SPECIFIED SEED MIXTURE ASAPPROPRIATE FOR THE SEASON) SHALL BE USED TO STABILIZE THESE AREAS AS INDICATED IN THE PLANS. IN LOCATIONS WHERE THE DITCH SLOPE IS LESS THAN 2 PERCENT, DISC ANCHORED MULCH AND HYDRAULIC SOILSTABILIZERS MAY BE USED FOR DITCH BOTTOM STABILIZATION AS INDICATED IN THE PLANS OR WITH THE APPROVAL OF THE ENGINEER.10.ALL EXPOSED SOIL AREAS SHALL BE STABILIZED PRIOR TO THE ONSET OF WINTER. ANY WORK STILL BEING PERFORMED SHALL BE SNOW MULCHED, SEEDED, OR BLANKETED WITHIN THE TIME FRAMES LISTED IN THE NPDESPERMIT.11.ALL TOPSOIL BERMS SHALL BE STABILIZED AS FOLLOWS:A.BETWEEN APRIL 1 - AUGUST 31, SEED WITH SEED MIXTURE 21-111B.BETWEEN SEPTEMBER 1 AND MARCH 31, SEED WITH SEED MIXTURE 21-112 AND TOP WITH RAPID STABILIZATION 2.12.TILLING FOR BEDS OR TREE HOLES SHALL BE PLANTED AND MULCHED WITH WOODCHIP WITHIN 7 DAYS OR STRAW MULCHED UNTIL PLANTING OPERATIONS CAN BE COMPLETED. FILTER LOGS SHALL BE PLACED, AS NEEDED, TOTRAP SEDIMENT ON THE LOWER EDGE OF BEDS OR TREE HOLES. FILTER LOGS SHALL BE LEFT TO PHOTO DEGRADE.SHEETSHEET TITLEPROJECT INFODRAWN:DESIGNED:CHECKED:PROJECT NO:ISSUE RECORDSignature Name:Date:Lic. No.:DENNIS PROPERTIES2214 FIFTH STREET, UNIT 3,WHITE BEAR LAKE, MN 55110651-247-7007Print Name:CERTIFICATIONSignature Name:Date:Lic. No.:PREPARED FORPROJECTPrint Name:I hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly LicensedProfessional Engineer under the laws of theState of Minnesota.3701 WAYZATA BOULEVARDSUITE 100MINNEAPOLIS, MN 55416-3791PH: 763-475-0010www.srfconsulting.comNO. DATE DESCRIPTION010-22-2021CITY SUBMITTAL103-18-2022CITY RESUBMITTALDOWNTOWN HUGO <br />NORTHEAST CORNER OF HIGHWAY 61 / 146TH STREET N, <br />HUGO, MN 55038 <br />P. SCHROEDER14356.00N. SCHAUFENBUELN. SCHAUFENBUELP. SCHROEDERXXXXX25721MICHAEL C. AARONC3.4PHASE 1 -SWPPP NOTES