Laserfiche WebLink
STEEL FENCE POST (T-POST), <br /> MINIMUM 5' LONG, 6' ATTACH FABRIC TO POSTS 3701 WAYZATA BOULEVARD <br /> MAXIMUM SPACING. WITH MINIMUM 3 ZIP TIES <br /> (50 LB. TENSILE) PER POST DEFLECTOR PLATE SUITE 100 <br /> IN TOP 8" OF FABRIC. MINNEAPOLIS, MN 55416-3791 <br /> OVERFLOW 1 -CENTER OF FILTER ASSEMBLY PH: 763-475-0010 <br /> MONOFILAMENT GEOTEXTILE OVERFLOW 2-TOP OF CURB BOX www.srfconsulting.com <br /> FABRIC PER MNDOT TABLE <br /> 3886-1 (MACHINE SLICED). 10"FILTER ASSEMBLY PREPARED FOR <br /> 20'RADIUS MINIMUM <br /> POST NOTCHES / properties <br /> TO FACE AWAY MACHINE SLICE �/ <br /> FROM FABRIC. 8"-12" DEPTH (PLUS 6" FLAP) CURB <br /> DENNIS PROPERTIES <br /> �\C' �oPo o�RFc MS 4, 2214 FIFTH STREET, UNIT 3, <br /> WHITE EAR LAKE,MN 5110 <br /> 01 Foe 4f <br /> ���G�FF a ••: . 651-247-7007 <br /> 20'RADIUS MINIMUM R <br /> / \ DIRECTION OF SURFACE FLOW <br /> I I <br /> PROJECT <br /> III OCG-23 HIGH-FLOW <br /> A <br /> 1"TO 2' 24" MINIMUM HIGH-FLOW FABRIC <br /> CRUSHED ROCK 2��`�� POST EMBEDMENT <br /> LU <br /> LU <br /> 6"MIN. <br /> DEPTH <br /> NOTE: ~ <br /> l0 <br /> THE MACHINE SLICED METHOD (THIS DETAIL) IS THE STANDARD SILT <br /> FENCE INSTALLATION METHOD. HEAVY-DUTY (ERO-113) OR STANDARD r-I <br /> ERO-1C SILT FENCE INSTALLATION METHODS SHOULD ONLY BE USED NOTES: <br /> ( ) 1. THE ROAD DRAIN-CURB&GUTTER MODEL CONSISTS OF A REUSABLE OPEN TOPPED RECEPTACLE THAT SETS � <br /> WHEN APPROVED OR DIRECTED BY THE CITY. INSIDE THE STORM SEWER GRATE.AN INCORPORATION REAR DEFLECTOR PLATE IS CONNECTED TO THE <br /> RECEPTACLE DIRECTING THE WATER INTO THE BASIN FOR FILTRATION. <br /> 2. THE ROAD DRAIN-CURB&GUTTER MODEL HAS A REPLACEABLE FILTER CARTRIDGE. 110 <br /> 3. THE FILTER MEDIA SHALL MEET ALL LOCAL SPECIFICATIONS FOR INLET PROTECTION. <br /> NOTES: AO COMPACTION: Q <br /> 1. CRUSHED CONCRETE IS NOT ALLOWED AFTER "SLICING" IN THE FABRIC AND BEFORE INSTALLATION MAINTENANCE: <br /> 2. GEOTEXTILE FABRIC REQUIRED UNDERNEATH COARSE AGGREGATE OF STEEL POSTS DRIVE INSTALLATION EQUIPMENT OVER THE 1. CHECK FILTER MEDIA AFTER EACH RAIN EVENT.CLEAN OR REPLACE IF SEDIMENT CLOGS FILTER. <br /> 3. MAINTENANCE IS INCIDENTAL "SLICE" WHILE FABRIC IS LAYING ON THE GROUND. THEN 2. REMOVE SEDIMENT AND DEBRIS FROM THE RECEPTACLE AFTER EACH RAIN EVENT. T <br /> INSTALL STEEL POSTS AND PULL UP FABRIC TO ATTACH AT Ur <br /> A UNIFORM HEIGHT. z - <br /> LL <br /> CITY OF <br /> Special Details Special Details Special Details Q <br /> r� <br /> ROCK CONSTRUCTION CITY OF SILT FENCE MACHINE SLICED Date CITY OF WIMCO CURB & GUTTER Date <br /> 04-01-15 09-01-15 04-01-15 <br /> ENTRANCE Revised: tHU Revised: Revised:HU-EC-1 HU-EC-2 INLET PROTECTION (CG23) HU-EC-4 <br /> n <br /> _ EST.1906 03-12-20 EST.1906 03-12-20 EST.1906 03-12-20 Z �1 <br /> vv <br /> ro <br /> O O <br /> Z U Ln <br /> z <br /> 111<J c <br /> CONCRETE WASHOUT CONTAINMENT = 1 <br /> 1. THE OWNER REQUIRES THE USE OF CONTAINED CONCRETE WASHOUT AREAS. O <br /> 2. CONTAINED CONCRETE WASHOUT AREA LOCATIONS SHALL BE IDENTIFIED ON THE STORM WATER O <br /> SEDIMENT CONTROL LOG AND INLET PROTECTION BAG POLLUTION PREVENTION PLAN (SWPPP). CONTAINERS SHALL BE PLACED IN SAFE, EASILY ACCESSIBLE, <br /> AND IN LOCATIONS APPROVED BY THE ENGINEER. O <br /> 3. CONTAINED CONCRETE WASHOUT AREA MUST BE CLEARLY LABELED "CONCRETE WASHOUT AREA" <br /> 4. CONTAINED CONCRETE WASHOUT AREA MUST BE WATERTIGHT. <br /> 5. CONTAINED CONCRETE WASHOUT AREA'S OVERALL CONDITION AND APPROXIMATE VOLUME MUST BE <br /> STORM SEWER GRATE WITH NOTED ON EACH WEEKLY EROSION CONTROL INSPECTION REPORT. <br /> INLET PROTECTION BAG OVERFLOW 6. CONTAINED CONCRETE WASHOUT AREA MUST HAVE A MINIMUM CAPACITY SIZE OF 12' X 8' X 2'OR 10 CERTIFICATION <br /> GAP 1 2" X 1 X 18" (MIN.) CENTER STAKE IN <br /> CUBIC-YARDS VOLUME. WOODEN STAKE CONTROL LOG I hereby certify that this plan, specification, or <br /> 7. CONTAINED CONCRETE WASHOUT AREA MUST BE MAINTAINED ONCE LEVELS REACH 1/2 FULL. report was prepared by me , Under my direct <br /> CURB AND GUTTER INLET 8. CONCRETE WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE TO MPCA REQUIREMENTS, BLOWN/PLACED FILTER <br /> STATE, AND FEDERAL LAWS. MEDIA OR SOIL 8" DIAMETER supervision and that I am a duly Licensed <br /> 9. DAMAGE TO THE CONTAINED CONCRETE WASHOUT CONTAINMENT SYSTEM MUST BE REPORTED TO THE 8" DIAMETER (MIN) COMPOST (MIN) COMPOST Professional Engineer under the laws of the <br /> OWNER WITHIN 24 HOURS OF DISCOVERY. 3'- SEDIMENT CONTROL LOG SEDIMENT State of Minnesota. <br /> 10. AN OWNER-APPROVED CONCRETE WASHOUT VENDOR MUST BE USED AND A MINIMUM OF A MONTHLY MAX. CONTROL LOG <br /> MAINTENANCE CONTRACT ISSUED. A COPY OF THIS CONTRACT MUST BE KEPT ON FILE WITH THE Ax FLOW-► <br /> OWNER. ' <br /> JIL-IIIJIL 'WIIIIIIIIII III IJ W IIII III��II-III III <br /> ll3rl-III�II=III_ III-III-' <br /> -u1-1Ti1- W W WW _ <br /> -III=III=III=III=m m m QI- <br /> CORRECTIVE ACTION -1�I=ITr'ITI=ITI=ITi=1T1=1Tl=ulau=ulau=lila1- Signature Name: <br /> i• '-III-III-II.L--ITi=1Tl-iTl-11171F_IIIaIF_IT�- <br /> THE OWNER RESERVES THE RIGHT TO DIRECT ANY REQUIRED MAINTENANCE OR REMOVAL OF ANY -III--- MICHAEL C. AARON <br /> •► CONCRETE WASTE ON SITE. THIS INCLUDES, BUT IS NOT LIMITED TO, LEAKING CONTAINERS, CONTAINERS 8" DIAMETER Print Name: <br /> THAT ARE MORE THAN 1/2 FULL FOR ONE INSPECTION PERIOD, ANY CONCRETE WASHOUT PILES (MIN) COMPOST <br /> �`. THROUGHOUT THE SITE, AND CONCRETE SLURRY RESULTING FROM CUTTING AND MASONRY WORK. THE SEDIMENT Date: XXXXX LIc. NO.: 25721 <br /> FEES INCURRED FROM THE MAINTENANCE OR REMOVAL OF CONCRETE WASTE IS INCIDENTAL TO THE WORK CONTROL LOG <br /> GENERATING THE WASTE, AND NO ADDITIONAL COMPENSATION WILL BE MADE THERETO. <br /> LIFTING STRAPS •. ' • ISSUE RECORD <br /> NO. DATE DESCRIPTION <br /> CURB FILTER <br /> 1 " X 1 " X 18" (MIN.) 0 10-22-2021 CITY SUBMITTAL <br /> CONCRETE <br /> WOODEN STAKE (TYP.) 1 03-18-2022 CITY RESUBMITTAL <br /> LOW PROFILE WITH GUTTER FOR WASHOUT AREA 12" OVERLAP (MIN.) <br /> SAFETY AND CURB APPEAL <br /> NOTES: <br /> 1. SEDIMENT CONTROL LOGS ARE TO BE A MINIMUM OF 8 LB/FT. SEE PLAN VIEW FOR LOCATION AND LENGTH OF SEDIMENT CONTROL <br /> LOGS. <br /> CIO CONCRETE WASHOUT SIGN DETAIL <br /> C',Q 2. SEDIMENT CONTROL LOGS THAT ACT AS A PERIMETER CONTROL SHALL BE INSTALLED PRIOR TO ANY UPGRADIENT LAND-DISTURBING <br /> MINIMUM SIZE: F ACTIVITIES. <br /> 12'LX8'WX2'H OR A MINIMUM GJi 3. SEDIMENT CONTROL LOGS PLACED ON PAVEMENT SHALL BE WEIGHTED DOWN RATHER THAN STAKED. PLACE LOGS AGAINST SIDEWALK <br /> INLET PROTECTION BAG DETAIL VOLUME OF 7.1 CUBIC YARDS. ��� \� OR BACK OF CURB WHEN ADJACENT TO THESE FEATURES. <br /> GT CON NOV'C �N\NOV-1 4. SEDIMENT CONTROL LOGS FILL MATERIAL SHALL CONSIST OF EITHER STRAW, WOOD FIBER, WOOD CHIP, OR COMPOST, AND FREE OF <br /> MAINTENCE BPS SN0 ANY NOXIOUS WEED SEEDS OR DEFECTS INCLUDING RIPS, HOLES AND OBVIOUS WEAR. FILL MATERIAL TO BE ENCASED IN <br /> Ncc SSRPMPSNO FROM0112 TOD24BMONTHS, DIA EOTERNSHALL BE APPROXIMATELY 8 OR NATURAL FIBER CASING INCHES WITH ENDS/PROPERINCH LY S CUREDH A TARGET SERVICE LIFE <br /> MAINTENANCE: 5. SEDIMENT CONTROL LOGS MAY BE USED AS SMALL CHECK DAMS IN DITCHES AND SWALES. HOWEVER, THEY SHOULD NOT BE USED IN PROJECT INFO <br /> BAG TO BE HELD IN PLACE BY 1. CONTAINER MUST BE MONITORED ON A WEEKLY BASIS AND CONDITION NOTED ON EROSION& PERENNIAL STREAMS,EXISTING GRATE DRAWN: N. SCHAUFENBUEL <br /> SEDIMENT CONTROL INSPECTION REPORT. 6. IT IS RECOMMENDED THAT SEDIMENT CONTROL LOGS BE TRENCHED INTO THE GROUND TO A DEPTH OF APPROXIMATELY 3 OF THE <br /> FRONT, BACK AND BOTTOM TO BE 2. CONCRETE MUST BE REMOVED ONCE THE CONTAINER IS 1/2 FULL.CONCRETE MUST BE DIAMETER OF THE LOG. IF TRENCHING TO THIS DEPTH IS NOT FEASIBLE AND/OR DESIRABLE (SHORT TERM INSTALLATION WITH DESIRE DESIGNED: N. SCHAUFENBUEL <br /> MADE FROM SINGLE PIECE OF FABRIC DISPOSED OF PROPERLY. NOT TO DAMAGE LANDSCAPE) A LESSER TRENCHING DEPTH MAY BE ACCEPTABLE WITH MORE ROBUST STAKING. COMPOST LOGS THAT <br /> AREA 8 LB/FT DO NOT NEED TO BE TRENCHED,CONTAINER SPECIFICATIONS: CHECKED: P. SCHROEDER <br /> 1. CONTAINER MUST BE CLEARLY LABELED"CONCRETE WASHOUT AREA" 7. THE UPHILL SIDE OF THE SEDIMENT CONTROL LOG SHALL BE BACKFILLED WITH SOIL OR FILTER MATERIAL THAT IS FREE OF ROCKS <br /> AND DEBRIS. THE SOIL SHALL BE TIGHTLY COMPACTED INTO THE SHAPE OF A RIGHT TRIANGLE USING A SHOVEL OR WEIGHTED LAWN PROJECT NO: 14356.00 <br /> 2. CONTAINER MUST BE PLACED IN AN EASILY ACCESSIBLE AND UNSIGHTLY ROLLER OR BLOWN IN PLACE. <br /> LOCATION <br /> 8. FOLLOW MANUFACTURERS' GUIDANCE FOR STAKING. IF MANUFACTURERS' INSTRUCTIONS DO NOT SPECIFY SPACING, STAKES SHALL BE <br /> 3. THE CONTAINER MUST BE PORTABLE AND WATER TIGHT. PLACED ON 4' CENTERS AND EMBEDDED A MINIMUM OF 6" INTO THE GROUND. 3" OF THE STAKE SHALL PROTUDE FROM THE TOP OF SHEET TITLE <br /> 4. THE CONTAINER MAY HAVE ACCESS RAMPS. THE LOG. STAKES THAT ARE BROKEN PRIOR TO INSTALLATION SHALL BE REPLACED. COMPOST LOGS SHOULD BE STAKED 10' ON <br /> 5. THE CONTAINER MUST HAVE A MINIMUM HOLDING CAPACITY OF 10 CUBIC YARDS CENTER. <br /> OF WASHED CONCRETE. CONCRETE WASHOUT DETAIL <br /> Special Details Special Details EDIMENT CONTROL LOGS CIVI L DETAI LS <br /> r CITY OF INLET PROTECTION i� CITY OF CONCRETE WASHOUT C>N�OTTOSCALE <br /> Date: Date: <br /> 01-20-17 04-30-18 <br /> Revised: H U-EC-5 DETAIL Revised: H U-EC-10 <br /> EST.1906 03-12-20 EST.1906 03-12-20 <br /> SHEET <br /> C5e0 <br />