My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 102722
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 102722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:27:29 PM
Creation date
3/21/2024 11:31:47 AM
Metadata
Fields
Template:
Commissions
Meeting Date
10/27/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOL LEGEND <br /> O STORM MANHOLE M CABLE UNDERGROUND LINE 00 <br /> Lo <br /> O GE ELECTRIC OVERHEAD LINE <br /> Z � <br /> CATCH BASIN <br /> U E ELECTRIC UNDERGROUND LINE (Loo 0 <br /> CURB INLET FO FIBER OPTIC UNDERGROUND LINE O •i 0 Y <br /> GAS NATURAL GAS UNDERGROUND LINE co o o <br /> ® FLARED END L a� c <br /> SANITARY SEWER PIPE o ca o <br /> O ■� -.0 <br /> � L SANITARY MANHOLE �� STORM SEWER PIPE m00 <br /> � <br /> HYDRANT T TELEPHONE UNDERGROUND LINE J a? <br /> WATERMAIN PIPE J W M 3: ('0 � <br /> ►t GATE VALVE & BOX DRAINTILE PIPE J <br /> N <br /> N <br /> ® WATER SHUTOFF <br /> LIGHT POLE <br /> O <br /> LLJ <br /> � N <br /> UTILITY NOTES Wo 00 <br /> U L0 <br /> 1. It is the responsibility of the contractor to perform or coordinate all necessary utility connections and 0 LO <br /> relocations from existing utility locations to the proposed building, as well as to all onsite amenities. J > Z <br /> These connections include but are not limited to water, sanitary sewer, cable TV, telephone, gas, J J <br /> electric, site lighting, etc. Im <br /> 2. All service connections shall be performed in accordance with state and local standard 0. <br /> W W <br /> LU <br /> �_ CB specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) I..L <br /> z 'a ��5 GQ I I Q Q <br /> it f th Cit TOP=929.2 may require a permit e y. <br /> I I l I l l l 1 > z `� INV=925.6 S >J <br /> 0o W 0 ` I INV=925.6 W <br /> �� Q J I 3. The contractor shall verify the elevations at proposed connections to existing utilities prior to any J J <br /> m °> ilw _ demolition or excavation. <br /> o Z c� a� ^ I (n <br /> U w I�' I 4. The contractor shall notify all appropriate engineering departments and utility companies 72 hours <br /> Q I prior to construction. All necessary precautions shall be made to avoid damage to existing utilities. <br /> / L TOP"-927.4 SAN LL `� o I I 5. Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where Z U O <br /> II 54. I I INV=922.3 S TOP=929.1 = EX SAN MH <br /> / RCP ST T/ / INV=921.9 W INV=917.9 BOTH located within 10 feet of waterlines or the building. O <br /> II IS/ CC / TSAN SANOP=928.4 INV=923.3 E No FLOW . CORE DRILL & <br /> INV=919.1 NW&SW �� CONNECT TO EXISTING <br /> INV_918.7 E > > -> > > I 6. All roof drainage storm sewer piping shall be Schedule 40 PVC, unless noted otherwise. �^ <br /> �pSTS RIM = 929.10* V J <br /> DITCH 6" PVC ROOF LEADERS (TYP EACH g� << �� <� Qa�24"RCP ST S < ° INV = 917.90* I 7. HDPE storm sewer piping shall meet ASTM F2306 and fittings shall meet ASTM D3212 joint v, <br /> O COORD. LOCATIONS W/MECH &ARCH SMH ° a 11 a�4.9 S p p g g t W <br /> 151 LF 8" PVC /SANS 66 LF 8 PVC CB 12 .8 W I pressure test. Installation shall meet ASTM C2321. <br /> ' ��� ^� @ 0.40% RIM = 928.2* .0 N <br /> CO o CO � z � _ <br /> INV- 930.77 @ 0.40/o INV- 830.17 8 LF 8" PVC @ A INV _ 925.3* (W) 8. All RCP pipe shown on the plans shall be MN/DOT class 3. <br /> I / 8 LF 6" PVC 0.40% � � o INV - 925.1 N � � <br /> INV= 930.66 9. Maintain a minimum of 7 /z of cover over all water lines and sanitary sewer lines. Where 7 /2 of v <br /> CO 1 1 `�L 10 LF 15" RCP @ 3.0% 7 _ Z <br /> I cover is not provided, install 2" rigid polystyrene insulation (MN/DOT 3760)with a thermal L <br /> INV = 930.81 CO 68 LF 6" PVC 0.50% I I I ( I SAN MH 1 <br /> 75 LF 8" PVC @ 0.40% A @ � - CB 13 * I resistance of at least 5 and a compressive strength of at least 25 psi. Insulation shall be 8'wide, <br /> I I INV= 930.14 I I I I I I I I RIM = 930.00 <br /> 15135 I-III CB 7 I1 I RIM = 928.2 I centered over pipe with 6" sand cushion between pipe and insulation. Where depth is less than 5, 0 � ID <br /> I INV= 918.16 INV= 925.6* use 4" of insulation. J co 00 <br /> N .. FOREST 53 LF 12" HDPE RIM = 932.91 Z <br /> 60 LF 6" PVC 0.40% n S BLV[ <br /> p0 STMH 2 @ 0.40% INV= 930.32 (NE) _ = I I n/ m O <br /> I / CLEANOUT RIM = 933.70 10. Install water lines 12" above sewers. Where the sewer is less than 12" below the water line (or IJ_ �/ LO <br /> i � INV= 929.82 (W/S) I I I.J� � � <br /> / INV= 925.95 INV = 929.84 �> 15' EXISTING above), install sewer piping of materials approved for inside building use for 10 feet on each side ofi-1 J <br /> O 'LLJ CO 9 LF 8" PVC @ 2.0% 88 LF 6" PVC CB 8 67 LF 12" HDPE S BUILDING - - I I 107 LF 8" PVC N I I the crossing. 0 m w CZ <br /> INV = 931.05 INV = 930.19 @ 0.40% RIM - 933.00 @ 0.40/o - - @ 0.40% NNOOT FIND U- <br /> c <br /> / I 11. All watermain piping shall be C-900 PVC, or class 52 ductile iron pipe, unless noted otherwise. O <br /> 54 UNIT INV= 930.03 U- - OUTLET FOR PIPE. I w O <br /> LjJ ILL <br /> APARTMENT • )> rillV w SMH CB 11 <br /> L TOP=931.4 RIM = 828.60* I I 12. Pressure test and disinfect all new watermains in accordance with state and local requirements. 0 <br /> o - - �- � QO <br /> c BUILDING CB 5 CB 6 INV=923.15 N O <br /> 15 LF 10" PVC INV=923.2E INV = 823.35* N O = <br /> I FFE = 934.50 o RIM - 932.78 RIM - 933.00 * 13. Sanitary sewer piping shall be PVC, SDR-35 for depths less than 12, PVC SDR-26 for depths Z LL 6 <br /> o @ 0.40/o INV - 929.78 INV - 930.05Ev INV = 923.15 W/SW I I rY p p g p p <br /> 3 ' CO COORD. W/MECH - - ) ) 44 LF 15" I SAN MH 2 I between 12 and 26, and class 52 D.I.P. for depths of 26 or more, unless specifically noted ` LO <br /> INV = 929.55 N/S - 290 LF 8" r <br /> INV = 931.07 INV= 926.13 RCP @ 0.52% h RIM - 931.15 otherwise on plans. M <br /> ° 78 LF 8" PVC @ 2.0% PVC @ 2.0% I I �/ � <br /> 83 LF 6" PVC @ 0.40% 8" GV& BOX 45 INV= 918.59 - LL <br /> COORD W/ MECH BEND (2) > > > > > �" Q O Z O <br /> O / 66 LF 6" PVC CO SAN MH 3 - . . - . . - . . - . . 7 r Q <br /> L o INV = 930.32 47 LF 6" PVC 0.50% _ STMH 5 Z v <br /> @ JNIT GARAGE INV- 929.40 5 L @ 0.40/o RIM = 933.26 � G <br /> t RIM = 93138 <br /> INV = 930.29 FFE=933.50 I I I O �o C H <br /> STMH 1 INV= 924.39 C) � c <br /> 11i I I v 64 LF 6" PVC 0.50% INV = 923.38 rT202 U U a' <br /> CO RIM = 934.06 T \ J v @ 94 LF 15" RCP W I Lu J o 06 <br /> INV= 930.06 106 LF 15" w w <br /> INV= 930.74 0 84 LF 12" HDPE CB 1 @ 0.52% w w a <br /> 40 LF 10" _ HDPE @ 0.40/oUJ <br /> 8 LF 6" PVC 00 @ 0.40% RIM = 932.67 „ U) (� 15097 15095 15093 <br /> o PVC @ 134 LF 10" CB 3 INV= 928.58 (W/E) 19 LF 24 HDPEw I w <br /> @ 0.40/o 0 /73 LF 18" HDPE @ 0.40% w w 27'x76' I hereby certify that this plan, <br /> 040/o SCH40PVC RIM = 932.50INV = 929.08 (SW/N) W W HOME PAD <br /> CO o 0.40% INV- 929.36 @ 0.40% FES INV - 928.50I specifications or report was prepared <br /> INV = 930.71 @ - SUMP = 924.58 „ z z (TYP) 4"x8"WYE TYP 16 Y Y p <br /> » » » » 62 LF 16 SCH 40 �_ _ ( ) b me or under m direct supervision <br /> JJ ° I- ~ J J COORD. LOCATIONS and that I am a duly licensed <br /> 3 Itl <br /> � CB4 38 LF 18" HDPE @ 0.40% CB 2 PVC @ 0.52/o Z = _`O 70 LF 6" PVC RIM = 933.00 85 LF 20 HDPE w U U W/MECH & OWNERProfessional Engineer under the laws <br /> I I 0.40% U STMH 3 RIM = 932.65 � _ <br /> I 0.40% 22.5° BEND w 2 I of the state of Minnesota. <br /> @ INV = 929.90 6 HYDRANT ,� <br /> / �� RIM = 933.02 INV = 928.92 �� N U w a Q <br /> FES INV= 930.10 ' CO STMH 4 CB 10 Q Q <br /> 83 LF 8" PVC 0.40% 6" GV& BOX INV= 929.21 270 LF 6" PVC 0.50% z w SAN MH 4 <br /> INV= 930.43 @ @ RIM = 931.00 RIM = 930.00 Q 22.x24� <br /> CONNECT TO 8 LF 6" PVC 6"x8" TEE » » » �> INV= 923.87 INV= 924.19 o I RIM = 932.37 GARAGE <br /> - 16 LF 12" RCP @ 0.81% INV= 920.61- (TYP) <br /> EX. 12" WM @ 0.40% - - INV = 930.43 io uNlr GARAGE I� - I �I <br /> 6 PVC ROOF LEADER 6 x8 TEE L <br /> ® CO FFE=933.50 o I INV 930.40 - TYP 12 TOTAL BETWEEN 4 GARAGES) I I I I I-8"WM I Date: Lic. No.: <br /> L . . . - . <br /> �� \ <br /> 6" HYDRANT <<_ 92RCPSTSco l( Rev. Date Description <br /> �I I--8"WM-1 I �8"WM I - �- - - 6" GV& BOX - - - - - - - p <br /> // 1IIIIIIIIIIIE I I STMH X <br /> 12"x8" TEE 8"x8"TEE - 22.5° BEND RIM = 930.25 <br /> FUTURE 8" x 8" TEE <br /> 12" PLUG OE - OE 8" GV& BOX - � INV= 924.32* <br /> 8" GV& BOX H e STUB TO 8„ GV& BOX OE OE OF OE 29 LF 15" RCP @ 0.52% OE OE OE OE <br /> WELL#1 <br /> 60 LF 15" CMP @ 0.50 % � � CB9 <br /> FES INV = 930.40* w 15'RCP RIM = 930.00 <br /> O , t N Lu 1_� srs INV= 924.35* <br /> z w O 1 1 1 1 Project#: 12226070.000 <br /> Drawn By: BDM <br /> c� T I Checked By: MJW <br /> o D >T > > > > > > > L> GEC Issue Date: 08.05.22 <br /> cn I T7 0 < <br /> cry CO > T < < < 1 N`� Sheet Title: <br /> ro <br /> M N� <br /> m�CY) <br /> 0 0 <br /> Q�» <br /> I D I I I � �, I I � ; I I ,., I I I I I I � � ��� UTILITY PLAN <br /> NORTH <br /> Sheet: <br /> 0 20 40 80 01 <br /> P:\Projects\Projects-2022\12226070-Hugo East Apartments& Manufactured Homes\C. Design\Drawing Files\12226070 C400- Utility.dwg <br />
The URL can be used to link to this page
Your browser does not support the video tag.