Laserfiche WebLink
Resolution 2022-____ <br />Page 3 <br /> <br /> <br />11. Prior to the release of the final plat for recording, the developer shall comply with the <br />following conditions. <br /> <br />a. The developer shall comply with the City standards for street lighting <br />within the public right-of-way. The street lights shall be a decorative style <br />light. <br /> <br />a. The developer shall comply with all conditions in the City Engineer’s <br />letter dated December 1, 2022, and red-lined comments provided to the <br />developer. <br /> <br />b. The development shall comply with the Fire Chief’s requirements <br />regarding fire flow calculations, the location of fire hydrants, fire <br />department connections, and fire lane signage. <br /> <br />c. The developer shall obtain all necessary stormwater management and <br />WCA permits from the City. <br /> <br />d. The development shall obtain the necessary permits from the Army Corp <br />of Engineers for the wetland replacement plan. <br /> <br />e. The developer shall obtain all necessary local, state, and federal permits. <br /> <br />f. A stormwater reuse agreement shall be reviewed and approved by staff <br />and recorded at Washington County. <br /> <br />g. The Homeowners Association (HOA) documents for review and approval <br />by staff. <br /> <br />h. The City’s development fees will apply to this project. The fee amounts <br />will be calculated and included as part of the Development Agreement. A <br />development agreement shall be executed and all fees shall be paid. <br /> <br />i. A formula has been developed to determine the amount that the water <br />trunk fee can be reduced based on the water reuse system, which results in <br />a 35% reduction in the trunk fee. This provision will be included in the <br />development agreement for each phase. <br /> <br />12. Prior to the issuance of building permits, the developer shall comply with the <br />following conditions. <br /> <br />a. The applicant shall record the final plat, development agreement and all <br />other documentation at Washington County and provide the City with <br />proof of recording. <br />