My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 08.24.23
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2023 PC Packets
>
PC PACKET 08.24.23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 12:08:57 PM
Creation date
3/21/2024 12:06:55 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/24/2023
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A great place to live, work and play…today and tomorrow <br /> <br />Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006 <br />P: 651-430-6655 | F: 651-430-6730 | TTY: 651-430-6246 <br />www.co.washington.mn.us <br /> <br />Washington County is an equal opportunity organization and employer <br /> <br />PUBLIC HEALTH & ENVIRONMENT <br />David Brummel, Director <br />Jill Timm, Deputy Director <br /> <br />Subdivision/Lot Split Review <br /> <br />On June 26th, 2023, the Department received a subdivision/lot split septic permit application for a lot <br />split in the City of Hugo. On July 20th, 2023, representatives from the Department conducted soil <br />observations on the parcel 3603121240001. Based on the soil observations conducted by the <br />Department representatives, and the submitted soil observations conducted by Ed Eklin Septic Systems <br />Design & Inspection LLC, the proposed lots appear to have 10,000 ft2 of suitable soil for individual <br />sewage treatment systems. <br /> <br />It should be noted that the soil testing conducted for these lots was preliminary and only for the purpose <br />of determining suitability of these lots to support long-term sewage treatment. Section 9.5 of the <br />Washington County Development Code, Chapter Four, Individual Sewage Treatment System Regulations <br />(Washington County Ordinance #206) states: <br /> <br />Complete soil testing on each individual lot must be conducted prior to permit issuance <br />independent of any prior subdivision or lot approval testing. For permit issuance, a minimum of <br />four (4) soil observations encompassing the proposed sewage treatment area are required. At <br />least one soil observation must be performed in the portion of the soil treatment area anticipated <br />to have the most limiting conditions. Larger areas may be required where conditions of use, soils, <br />topography, or vegetation require. <br /> <br />If you have any questions or comments, please contact me at 651-430-6819. <br /> <br />Sincerely, <br /> <br /> <br />Jonathan Hinks <br />Environmental Specialist
The URL can be used to link to this page
Your browser does not support the video tag.