My WebLink
|
Help
|
About
|
Sign Out
Home
2024.03.04 CC Minutes
Hugo
>
City Council
>
City Council Minutes
>
2024 CC Minutes
>
2024.03.04 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 2:33:30 PM
Creation date
3/21/2024 2:33:25 PM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
3/4/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council Meeting Minutes for March 4, 2024 <br />Page 3 of 7 <br />HSHC Board President Liz Cinqueonce began by thanking the Council for allowing the project <br />to move forward and said the Council’s confidence in them made a difference in their <br />fundraising and what they were able to accomplish. Highlights in 2023 included finalizing the <br />agreement with the City that included partnership with the Forest Lake Historical Society, which <br />serves as the fiscal host until the non-profit has been formed. Liz explained that once the <br />determination letter from the IRS was received there were steps to take to become a non-profit. <br />Once that happens, the agreement would transition to the HSHC. <br /> <br />There are nine board members and currently 35 volunteers. A group of MBA students had <br />worked on their business plan. Restoration activities included trash removal, and some artifacts <br />were cataloged. Precise Exterior and The Sealant Technicians repaired the roof and chimney. <br />The soffit was repaired by Northern Bedrock, and Floyd Petty completed the painting of it. The <br />stairs did not get done, but the poured concrete will happen in the spring. Trail cameras were <br />installed. Volunteers provided input on the site plan for the schoolhouse grounds. <br /> <br />Liz talked about how they met, or didn’t meet, their Measures of Success. Enough money was <br />raised through fundraising to complete the roof, chimney, and soffits. They were still working on <br />money for siding. They saw interest from the community increase when things started <br />happening on the site. They expected the repairs on the window and siding to be completed this <br />fall. Other unexpected accomplished included interest by Connexus Energy to bring power to <br />the site. Materials had been secured for glass block windows, display cases were donated by <br />Rolseth Drug in Forest Lake, and the Petty’s were gathering donations for a garage sale. <br />Fourteen of their 20 Measures had been completed. Four of the uncompleted were due to the <br />IRS determination. <br /> <br />A video was presented of the proposed site that showed 11 parking spaces, watering station for <br />horses and dogs, hitching post for horses, picnic area with bike racks, shelter with trash <br />receptacles, and enclosures for portable restrooms. Also included on the drawing was a building <br />the Snowmobile Club had talked about last year, though there had been no recent conversations <br />with them. The volunteer who put the plan together owned a landscape design company and <br />was donating the labor and plans for making this come to life. She acknowledged formal <br />approval of the site plan would be needed from the City Council. <br /> <br />Liz talked about the goals they had for 2024 that included completing the 2023 goals, advancing <br />progress on the site, and raising community engagement and fundraising. Restoration plans for <br />this year were to replace stairs, windows, siding and side door, and running basic electric to the <br />site. They also wanted to have an approved site plan for the grounds and continue with grounds <br />cleanup. They were also looking for engagement from students and other history groups. <br />Planning components included ADA compliance by adding a ramp and the preparation of plans <br />for septic system, well, and plumbing inside the building, and other structural components. <br /> <br />Klein asked if they were working with the Hugo Historical Commission. Liz replied that <br />Commission Member Brad LeTourneau was a member of the Board of Directors and took the <br />lead on the plans that were presented. He was also an ex-officio member of the Forest Lake <br />Historical Society. Klein also inquired whether they approach Anderson Windows for donations. <br />Liz replied they were on their list, and the HSHC was also considering having community <br />members purchase a window for the school. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.