My WebLink
|
Help
|
About
|
Sign Out
Home
EDA PACKET 04.18.23
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2023 EDA Packets
>
EDA PACKET 04.18.23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:14:41 PM
Creation date
3/26/2024 2:12:03 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/18/2023
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120th Street N <br />180th Street N <br />J <br />ROAD <br />COUNTY <br />50 <br />ROAD <br />COUNTY202nd Street <br />Headwaters Pwky <br />190th Street N <br />170th Street N <br />165th Street N <br />O n e k a L a k e B lv d N <br />Fre <br />n <br />c <br />h <br />m <br />an Rd <br />Egg Lake Rd N <br />Highway 61 Visioning Study <br />PROJECT OVERVIEW <br />Washington County, MnDOT and the City of Hugo are partnering on a corridor visioning study of Hwy 61 <br />through Hugo city limits. A traffic, land use and engineering analysis, along with community input will <br />help identify the long-range vision for the corridor that will be used to define future improvements and <br />guide a potential jurisdictional transfer of the roadway from MnDOT to Washington County. <br />Maddie Dahlheimer <br />Washington County Senior Planner <br />651-430-4338 |madeline.dahlheimer@co.washington.mn.us <br />STUDY GOALS <br />• Define a corridor vision that supports economic growth, community investment and long-term transportation goals <br />while increasing safety for all users. <br />• Evaluate access and intersection locations onto Hwy 61 and recommend future improvements at key locations. <br />• Determine right-of-way needs for the corridor based on the needs of each travel mode (e.g., cars, trucks, transit, <br />pedestrians, bicyclists). <br />• Identify pedestrian and bicycle safety and connectivity improvements throughout <br />the corridor. <br />• Determine a financial plan and timeline for the Hwy 61 jurisdictional transfer <br />through Hugo and Forest Lake. <br />SCHEDULE <br />Explore <br />Winter/ <br />Spring 2023 <br />Evaluate <br />Summer <br />2023 <br />Define <br />Fall/Winter <br />2023 <br />Collect data and assess existing/forecasted conditions. <br />Consider future development in Hugo and Forest Lake. <br />Explore corridor issues and opportunities. <br />Develop and evaluate corridor improvement <br />alternatives with consideration to community priorities <br />and traffic engineering solutions. <br />Define a preferred corridor vision. <br />Compile study report summarizing process and outcomes. <br />Outline jurisdictional transfer plan including <br />implementation, financial and timeline considerations. <br />Rachel Juba <br />Hugo Community Development Director <br />651-762-6304 |rjuba@ci.hugo.mn.us <br />WANT MORE INFO? <br />Visit the project webpage for more information, study updates and to sign up for email notifications! <br />STUDY AREA <br />www.co.washington.mn.us/Highway61
The URL can be used to link to this page
Your browser does not support the video tag.