Laserfiche WebLink
"""""""""""""""""""""""""""" <br />" <br />"" <br />" <br />" <br />" <br />" <br />" <br />""" <br />## <br />9 <br />1 <br />4906 926916920916 <br />928926 <br />922928 <br />9209 <br />1 <br />4 <br />910 91890691 <br />6 <br />912912912 <br />912906908924914922922 <br />924920 920906910918918908916914912 <br />910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_A Date Saved: 3/31/2023¯1 inch = 450 feet <br />0 450 <br />FeetNorth Star Wetland Bank <br />Hugo, MN <br />Figure 3a - Project Plan (Option 1) <br />Proposed Easement Boundary <br />Proposed Wetland Boundary <br />Proposed Upland Buffer (5.12 ac) <br />Proposed Rehabilitation (98.71 ac) <br />Proposed Restoration (19.6 ac) <br />Potential Future ELC Trail <br />StormSewer <br />Utility Easement <br />LiDAR Contours <br />#Outlet Control Structure <br />"Ditch Plug