My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 06.21.23
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2023
>
Parks Packet 06.21.23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 1:13:09 PM
Creation date
4/4/2024 12:59:28 PM
Metadata
Fields
Template:
Commissions
Meeting Date
6/21/2023
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Line Item Unit Quantity Unit Price Total Price <br />1 MOBILIZATION L S 1 $4,000.00 $4,000 <br />2 CLAY EMBANKMENT C Y 170 $65.00 $11,050 <br />3 TOPSOIL C Y 70 $40.00 $2,800 <br />4 EROSION CONTROL BLANKET S Y 535 $4.00 $2,140 <br />5 SEDIMENT CONTROL LOG L F 400 $4.00 $1,600 <br />6 STABILIZED CONSTRUCTION EXIT EA 1 $1,500.00 $1,500 <br />7 OUTLET CONTROL STRUCTURE EA 2 $10,000.00 $20,000 <br />8 SILT FENCE L F 50 $5.00 $250 <br />$43,340 <br />$8,668 <br />$52,008 <br />$5,201 <br />$57,209 <br />INDIRECT COSTS TOTAL (10%) <br />GRAND TOTAL <br />Engineer's Estimate of Cost - Northstar Wetland Bank Project <br />05.23.2023 <br />WSB Project Number 020552-000 <br />CONSTRUCTION SUBTOTAL <br />CONTINGENCY TOTAL (20%) <br />SUBTOTAL
The URL can be used to link to this page
Your browser does not support the video tag.