Laserfiche WebLink
Line Item Unit Quantity Unit Price Total Price <br />1 MOBILIZATION L S 1 $4,000.00 $4,000 <br />2 CLAY EMBANKMENT C Y 170 $65.00 $11,050 <br />3 TOPSOIL C Y 70 $40.00 $2,800 <br />4 EROSION CONTROL BLANKET S Y 535 $4.00 $2,140 <br />5 SEDIMENT CONTROL LOG L F 400 $4.00 $1,600 <br />6 STABILIZED CONSTRUCTION EXIT EA 1 $1,500.00 $1,500 <br />7 OUTLET CONTROL STRUCTURE EA 2 $10,000.00 $20,000 <br />8 SILT FENCE L F 50 $5.00 $250 <br />$43,340 <br />$8,668 <br />$52,008 <br />$5,201 <br />$57,209 <br />INDIRECT COSTS TOTAL (10%) <br />GRAND TOTAL <br />Engineer's Estimate of Cost - Northstar Wetland Bank Project <br />05.23.2023 <br />WSB Project Number 020552-000 <br />CONSTRUCTION SUBTOTAL <br />CONTINGENCY TOTAL (20%) <br />SUBTOTAL