My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 06.21.23
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2023
>
Parks Packet 06.21.23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 1:13:09 PM
Creation date
4/4/2024 12:59:28 PM
Metadata
Fields
Template:
Commissions
Meeting Date
6/21/2023
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 of 2 <br />Parks Commission Minutes <br /> April 19, 2023 <br />All ayes <br />Motion approved. <br /> <br /> <br />4. Updates on ongoing projects <br /> <br />1. Park Sign Replacement plan <br />Staff has continued researching pylon signs and potential vendors for the park sign replacement plan. <br /> <br />2. Bernin Property Planning <br />WSB and Associates is working on the Bernin Park master plan graphics. The next step is reviewing the <br />drafted plan and scheduling a community workshop in June. <br /> <br />3. North Star Wetland Bank & Trails <br />A draft prospectus has been prepared for TEP review for the North Star Wetland Bank and scheduled to be <br />reviewed on April 28, 2023. After the review is completed, the TEP recommendations will be discussed at the <br />June Parks Commission meeting. This meeting will also review the drafted cost estimates determined with <br />WSB and Associates. <br /> <br />Plan A: Wetland hydrology would be restored by constructing ditch plugs with construction grade clay, <br />topsoil, and vegetation. One plug would be located at the intersection of the eastern lateral ditch and the <br />east west main ditch. Two plugs would also be installed on the southern ditches. An outlet control structure <br />with a set elevation would be installed at the southwestern edge of the parcel where the ditch connects to <br />JD3. <br /> <br />Plan B: The western and central north/south lateral ditches would be filled. A ditch plug would be installed on <br />the south ditch. An OCS with a set elevation would be installed at the southwestern edge of the parcel where <br />the ditch connects to JD3. <br /> <br />4. Lions Volunteer Park Veterans Memorial <br />The Hugo American Legion Commander met with staff to discuss construction of a memorial at Lions <br />Volunteer Park in the area identified in the park’s plan. The Legion will put together a committee to discuss <br />fundraising, design, and management. <br /> <br /> <br />5. Adjournment <br /> <br />Rauschendorfer made a motion, Moore-Arcand seconded to adjourn the meeting at 7:50pm. <br /> <br />All ayes. <br />Motion approved. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.