Laserfiche WebLink
ISSUES & REVISIONS <br />COMMISSION NO: <br />DRAWN BY: <br />CHECKED BY: <br />SHEET <br />767 N. EUSTIS STREET, SUITE 190 <br />ST. PAUL, MINNESOTA 55114 <br />651.642.9200 <br />WWW.POPEDESIGN.COM <br />POPE DESIGN GROUP <br />DATE <br />160061004 <br />GAR <br />MCB <br />MICHAEL C. BRANDT, P.E. <br />03/29/2024 462661DATE: <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION OR REPORT WAS PREPARED BY <br />ME OR UNDER MY DIRECT SUPERVISION AND <br />THAT I AM A DULY LICENSED PROFESSIONAL <br />ENGINEER UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />MN <br />LIC. NO. <br />NOT FOR CONSTRUCTION <br />SCHEMATIC PRICING4-14-23 <br />1 CITY SUBMITTAL11-30-23 <br /> © 2023 KIMLEY-HORN AND ASSOCIATES, INC. <br />767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 <br />PHONE: 651-645-4197 <br />WWW.KIMLEY-HORN.COM <br />PRELIMINARY - NOT FOR CONSTRUCTIONCITY & BCWD <br />RESUBMITTAL 03-29-24 <br />NORTH <br />VICINITY <br />N.T.S. <br />SITE <br />HUGO, WASHINGTON COUNTY, MN <br />1.CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH <br />WHAT IS SHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION. <br />2.IF REPRODUCED, THE SCALES SHOWN ON THESE PLANS ARE BASED ON A 30x42 SHEET. <br />3.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR <br />UTILITY SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING <br />POSSESSION AND THE FINAL CONNECTION OF SERVICES. <br />4.ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, <br />AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. <br />5.VERTICAL DATUM: NAVD88 <br />NOTES: <br />LANDSCAPE ARCHITECT <br />KIMLEY-HORN AND ASSOCIATES, INC. <br />767 EUSTIS STREET, SUITE 100 <br />ST. PAUL, MN 55114 <br />TELEPHONE: 651-645-4197 <br />CONTACT: MITCHELL COOKAS <br />GEOTECHNICAL ENGINEER <br />AMERICAN ENGINEERING TESTING <br />550 CLEVELAND AVE. N <br />ST PAUL, MN 55114 <br />TELEPHONE: 651-659-9001 <br />CONTACT: THOMAS VENEMA <br />PROJECT TEAM: <br />SURVEYOR <br />CORNERSTONE LAND SURVEYING, INC <br />1970 NORTHWESTERN AVE. SUITE 200 <br />STILLWATER, MN 55082 <br />TELEPHONE: 651-275-8969 <br />CONTACT: DANIEL THURMES <br />ENGINEER <br />KIMLEY-HORN AND ASSOCIATES, INC. <br />PREPARED BY: MICHAEL C. BRANDT, PE <br />767 EUSTIS STREET, SUITE 100 <br />ST. PAUL, MN 55114 <br />TELEPHONE: 651-645-4197 <br />OWNER / DEVELOPER <br />LIBERTY CLASSICAL ACADEMY <br />10158 122ND STREET N <br />HUGO, MN 55038 <br />TELEPHONE: 651-772-2777 <br />CONTACT: REBEKAH HAGSTROM <br />LIBERTY CLASSICAL ACADEMY <br />SECTION 36, TOWNSHIP31 N, RANGE 21 W <br />FOR <br />SITE DEVELOPMENT PLANS <br />Know what'sbelow. <br />before you dig.Call <br />ARCHITECT <br />POPE DESIGN GROUP <br />767 EUSTIS STREET, SUITE 190 <br />ST. PAUL, MN 55114 <br />TELEPHONE: 651-642-9200 <br />CONTACT: ELISE KELLY <br />122ND ST <br />C000 <br />COVER SHEET <br />Sheet List Table <br />Sheet Number Sheet Title <br />C000 COVER SHEET <br />V100 EXISTING CONDITIONS <br />V101 EXISTING CONDITIONS <br />V102 EXISTING CONDITIONS <br />C100 GENERAL NOTES <br />C101 ADJACENT PARCEL MAP <br />C200 SITE DEMOLITION PLAN <br />C300 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 <br />C301 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 <br />C400 PHASE I OVERALL SITE PLAN <br />C401 OVERALL MASTERPLAN <br />C402 OVERALL PHASE I SITE PLAN <br />C403 PHASE I SITE PLAN ENLARGEMENT <br />C404 PHASE I SITE PLAN ENLARGEMENT <br />C405 PHASE I SITE PLAN ENLARGEMENT <br />C406 PHASE I SITE PLAN ENLARGEMENT <br />C407 PHASE 1 SIGNAGE PLAN <br />C408 PHASE 1 SIGNAGE PLAN <br />C500 OVERALL GRADING PLAN <br />C501 GRADING MASTERPLAN ENLARGEMENT <br />C502 GRADING MASTERPLAN ENLARGEMENT <br />C503 GRADING MASTERPLAN ENLARGEMENT <br />C504 GRADING MASTERPLAN ENLARGEMENT <br />C505 PHASE I GRADING PLAN ENLARGMENT <br />C506 PHASE I GRADING PLAN ENLARGMENT <br />C507 PHASE I GRADING PLAN ENLARGMENT <br />C508 PHASE I GRADING PLAN ENLARGMENT <br />C600 UTILITY PLAN <br />C601 SEPTIC PLAN - MOUND SITE PLAN <br />C602 SEPTIC PLAN - PHASE 1 MOUNDS <br />C603 SEPTIC PLAN - TREATMENT SITE PLAN <br />C604 SEPTIC PLAN - DOSE TANKS <br />C605 SEPTIC PLAN - HYDRAULIC PROFILE TANKS <br />C606 SEPTIC PLAN - METER MANHOLE <br />C607 SEPTIC PLAN - EQ TANK DETAIL <br />C608 SEPTIC PLAN - SEPTIC TANK DETAIL <br />C609 SEPTIC PLAN - TREATMENT TANK DETAIL <br />C610 SEPTIC PLAN - ALPHA DETAILS <br />C611 SEPTIC PLAN - CONTROL BUILDING <br />C612 SEPTIC PLAN - MOUND DETAIL <br />C700 CONSTRUCTION DETAILS <br />C701 CONSTRUCTION DETAILS <br />C702 CONSTRUCTION DETAILS <br />C703 CONSTRUCTION DETAILS <br />C800 OVERALL QUEUING PLAN <br />C801 FIRETRUCK MOVEMENT PLAN <br />L100 OVERALL PHASE 1 LANDSCAPE MASTERPLAN <br />L101 PHASE 1 LANDSCAPE PLAN ENLARGEMENT <br />L102 PHASE 1 LANDSCAPE PLAN ENLARGEMENT <br />L103 PHASE 1 LANDSCAPE PLAN ENLARGEMENT <br />L104 PHASE 1 LANDSCAPE PLAN ENLARGEMENT <br />L105 LANDSCAPE DETAILSKELLER AVE