ISSUES & REVISIONS
<br />COMMISSION NO:
<br />DRAWN BY:
<br />CHECKED BY:
<br />SHEET
<br />767 N. EUSTIS STREET, SUITE 190
<br />ST. PAUL, MINNESOTA 55114
<br />651.642.9200
<br />WWW.POPEDESIGN.COM
<br />POPE DESIGN GROUP
<br />DATE
<br />160061004
<br />GAR
<br />MCB
<br />MICHAEL C. BRANDT, P.E.
<br />03/29/2024 462661DATE:
<br />I HEREBY CERTIFY THAT THIS PLAN,
<br />SPECIFICATION OR REPORT WAS PREPARED BY
<br />ME OR UNDER MY DIRECT SUPERVISION AND
<br />THAT I AM A DULY LICENSED PROFESSIONAL
<br />ENGINEER UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />MN
<br />LIC. NO.
<br />NOT FOR CONSTRUCTION
<br />SCHEMATIC PRICING4-14-23
<br />1 CITY SUBMITTAL11-30-23
<br /> © 2023 KIMLEY-HORN AND ASSOCIATES, INC.
<br />767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
<br />PHONE: 651-645-4197
<br />WWW.KIMLEY-HORN.COM
<br />PRELIMINARY - NOT FOR CONSTRUCTIONCITY & BCWD
<br />RESUBMITTAL 03-29-24
<br />GENERAL CONSTRUCTION NOTES
<br />1.THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE STATE
<br />DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION"
<br />(LATEST EDITION) AND BECOME FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING
<br />WORK. UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM AS APPLICABLE TO
<br />THESE STANDARDS AND SPECIFICATIONS.
<br />3.PERFORM ALL WORK IN COMPLIANCE WITH APPLICABLE CITY REGULATIONS, STATE
<br />CODES, AND O.S.H.A. STANDARDS. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING
<br />THE NECESSARY MATERIALS & LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND
<br />DESCRIBED IN THE CONSTRUCTION DOCUMENTS, AND IN ACCORDANCE WITH THE
<br />SPECIFICATIONS AND REQUIREMENTS OF THE APPROPRIATE APPROVING AUTHORITIES.
<br />4.CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED,
<br />REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT AND ALL OTHER
<br />DELETERIOUS MATERIAL.
<br />5.THE EXISTING SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS QUALITY LEVEL "D"
<br />UNLESS OTHERWISE NOTED. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE
<br />GUIDELINES OF CI/ACSE 38/02, ENTITLED STANDARD GUIDELINES FOR THE COLLECTION
<br />AND DEPICTION OF SUBSURFACE QUALITY DATA BY THE FHA. EXISTING UTILITIES SHOWN
<br />ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO THE ENGINEER AT THE
<br />TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY
<br />THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING
<br />UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE
<br />ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE
<br />CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANY WORK
<br />IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
<br />ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND
<br />PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL
<br />ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF
<br />THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR
<br />TEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE,
<br />SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL
<br />BE CONTACTED AND THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR
<br />SUCH WORK.
<br />6.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES
<br />WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE CONSTRUCTION
<br />AREA BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PROVIDE 48 HOURS
<br />MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING CONSTRUCTION.
<br />7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
<br />CONSTRUCTION PERMITS AND BONDS IF REQUIRED PRIOR TO CONSTRUCTION.
<br />8.THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF
<br />THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, GEOTECHNICAL
<br />REPORT AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION
<br />PERMITS.
<br />9.ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE
<br />ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD
<br />CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF
<br />THE OWNER AND NOTIFICATION TO THE ENGINEER.
<br />10.ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO
<br />BE SENT TO THE OWNER DIRECTLY FROM THE TESTING AGENCY.
<br />11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING
<br />AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR
<br />AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE
<br />RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF
<br />CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA SHALL
<br />BE COLLECTED BY A STATE PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE
<br />ENGAGED BY THE CONTRACTOR.
<br />12.ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A
<br />LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL
<br />AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY WELL
<br />ABANDONMENT PERMITS REQUIRED.
<br />13.ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO
<br />THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS
<br />MADE.
<br />14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED
<br />IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR
<br />OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE
<br />CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF
<br />THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN
<br />IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF
<br />ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER.
<br />15.SHOULD CONTRACTOR ENCOUNTER ANY DEBRIS LADEN SOIL, STRUCTURES NOT
<br />IDENTIFIED IN THE DOCUMENTS, OR OTHER SOURCE OF POTENTIAL CONTAMINATION,
<br />THEY SHALL IMMEDIATELY CONTACT THE ENGINEER AND OWNER.
<br />16.CONTRACTOR SHALL NOTIFY OWNER AND/OR ENGINEER 48 HOURS IN ADVANCE OF THE
<br />FOLLOWING ACTIVITIES: PRE-CONSTRUCTION MEETING, SUBGRADE PREPARATION, BASE
<br />INSTALLATION, ASPHALT INSTALLATION, UNDERGROUND PIPING AND UTILITIES
<br />INSTALLATION,INSTALLATION OF STRUCTURES, CHECK VALVES, HYDRANTS, METERS,
<br />ETC., SIDEWALK INSTALLATION, CONNECTIONS TO WATER AND SEWER MAINS, TESTS OF
<br />UTILITIES.
<br />EROSION CONTROL NOTES
<br />1.THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THE
<br />EROSION CONTROL PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS
<br />INCLUDED IN THE SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL
<br />SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
<br />2.ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION
<br />PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN
<br />AND THE STATE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL
<br />PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS.
<br />3.BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL,
<br />STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE
<br />CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE
<br />PERMITTING AGENCY OR OWNER.
<br />4.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLYING WITH THE REQUIREMENTS
<br />OF THE AUTHORITIES HAVING JURISDICTION, AND SHALL MAINTAIN COMPLIANCE WITH
<br />APPLICABLE LAWS AND REGULATIONS FOR THE DURATION OF CONSTRUCTION.
<br />5.THE CONTRACTOR SHALL FIELD ADJUST AND/OR PROVIDE ADDITIONAL EROSION CONTROL
<br />BMP'S AS NEEDED TO PREVENT EROSION AND OFF-SITE SEDIMENT DISCHARGE FROM THE
<br />CONSTRUCTION SITE. LOG AND RECORD ANY ADJUSTMENTS AND DEVIATIONS FROM THE
<br />APPROVED EROSION CONTROL PLANS WITHIN THE SWPPP DOCUMENTS STORED IN THE
<br />JOB SITE TRAILER.
<br />6.BMPS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM
<br />WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL
<br />CONDITION AS REQUIRED BY ALL JURISDICTIONS UNTIL NO LONGER REQUIRED FOR A
<br />COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. ALL EROSION AND
<br />SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A CERTIFIED PERSON AT
<br />LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A 0.5-INCH
<br />OR GREATER RAINFALL EVENT.
<br />7.EROSION & SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN ACCORDANCE WITH THE
<br />FOLLOWING:
<br />7.1.INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF
<br />THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION.
<br />7.2.ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO VERIFY THAT A HEALTHY
<br />STAND OF VEGETATION IS MAINTAINED. SEEDED AREAS SHOULD BE FERTILIZED,
<br />WATERED AND RE-SEEDED AS NEEDED. REFER TO THE LANDSCAPE PLAN AND
<br />PROJECT SPECIFICATIONS.
<br />7.3.SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED.
<br />SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES WHEN IT REACHES ONE-THIRD
<br />THE HEIGHT OF THE SILT FENCE.
<br />7.4.THE ROCK CONSTRUCTION ENTRANCE(S) SHALL BE MAINTAINED IN A CONDITION
<br />WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY.
<br />THIS MAY REQUIRE PERIODIC ADDITIONS OF ROCK TOP DRESSING AS CONDITIONS
<br />DEMAND.
<br />7.5.THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION
<br />(SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC ADDITIONS OF
<br />TOP DRESSING IF THE TEMPORARY PARKING CONDITIONS DEMAND.
<br />7.6.PERFORM ALL MAINTENANCE OPERATIONS IN A TIMELY MANNER BUT IN NO CASE
<br />LATER THAN 2 CALENDAR DAYS FOLLOWING THE INSPECTION.
<br />PAVING AND STRIPING NOTES
<br />1.ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTION'S
<br />RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND
<br />STANDARDS (LATEST EDITION) OR STATE DOT SPECIFICATIONS AND STANDARDS (LATEST
<br />EDITION) IF NOT COVERED BY LOCAL OR COUNTY REGULATIONS.
<br />2.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL
<br />CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D) AND CITY
<br />STANDARDS.
<br />3.CONTRACTOR SHALL FURNISH ALL PAVEMENT MARKINGS FOR FIRE LANES, ROADWAY
<br />LANES, PARKING STALLS, ACCESSIBLE PARKING SYMBOLS, ACCESS AISLES, STOP BARS
<br />AND SIGNS, AND MISCELLANEOUS STRIPING WITHIN THE PARKING LOT AS SHOWN ON THE
<br />PLANS.
<br />4.ALL EXPANSION JOINTS SHALL EXTEND THROUGH THE CURB.
<br />5.THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE 2 FEET.
<br />6.ALL JOINTS, INCLUDING EXPANSION JOINTS WITH REMOVABLE TACK STRIPS, SHALL BE
<br />SEALED WITH JOINT SEALANT.
<br />7.THE MATERIALS AND PROPERTIES OF ALL CONCRETE SHALL MEET THE APPLICABLE
<br />REQUIREMENTS IN THE A.C.I. (AMERICAN CONCRETE INSTITUTE) MANUAL OF CONCRETE
<br />PRACTICE.
<br />8.CONTRACTOR SHALL APPLY A SECOND COATING OVER ALL PAVEMENT MARKINGS PRIOR
<br />TO ACCEPTANCE BY OWNER FOLLOWED BY A COAT OF GLASS BEADS AS APPLICABLE PER
<br />THE PROJECT DOCUMENTS.
<br />9.ANY EXISTING PAVEMENT, CURBS AND/OR SIDEWALKS DAMAGED OR REMOVED WILL BE
<br />REPAIRED BY THE CONTRACTOR AT HIS EXPENSE TO THE SATISFACTION OF THE
<br />ENGINEER AND OWNER.
<br />10.BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY SUITABLE ACCESSIBLE
<br />ROUTES (PER A.D.A). GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING
<br />CROSSING DRIVEWAYS SHALL CONFORM TO CURRENT ADA STATE/NATIONAL STANDARDS.
<br />IN NO CASE SHALL ACCESSIBLE RAMP SLOPES EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN
<br />NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED 2% . IN NO CASE SHALL LONGITUDINAL
<br />SIDEWALK SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKING STALLS OR
<br />AISLES EXCEED 2% (1.5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL
<br />BUILDING DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFY
<br />ENGINEER IMMEDIATELY IF ADA CRITERIA CANNOT BE MET IN ANY LOCATION PRIOR TO
<br />PAVING. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A COMPLIANCE
<br />ISSUES.
<br />11.MAXIMUM JOINT SPACING IS TWICE THE DEPTH OF THE CONCRETE PAVEMENT IN FEET.
<br />GRADING AND DRAINAGE NOTES
<br />1.GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY THE SUITABILITY OF
<br />ALL EXISTING AND PROPOSED SITE CONDITIONS INCLUDING GRADES AND DIMENSIONS
<br />BEFORE START OF CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF
<br />ANY DISCREPANCIES.
<br />2.THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL
<br />ADJUST BMP'S AS NECESSARY AND REGRADE WASHOUTS WHERE THEY OCCUR AFTER
<br />EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE
<br />STABILIZATION OCCURS.
<br />3.CONTRACTOR SHALL ENSURE THERE IS POSITIVE DRAINAGE FROM THE PROPOSED
<br />BUILDINGS SO THAT SURFACE RUNOFF WILL DRAIN BY GRAVITY TO NEW OR EXISTING
<br />DRAINAGE OUTLETS. CONTRACTOR SHALL ENSURE NO PONDING OCCURS IN PAVED AREAS
<br />AND SHALL NOTIFY ENGINEER IF ANY GRADING DISCREPANCIES ARE FOUND IN THE
<br />EXISTING AND PROPOSED GRADES PRIOR TO PLACEMENT OF PAVEMENT OR UTILITIES.
<br />4.CONTRACTOR SHALL PROTECT ALL MANHOLE COVERS, VALVE COVERS, VAULT LIDS, FIRE
<br />HYDRANTS, POWER POLES, GUY WIRES, AND TELEPHONE BOXES THAT ARE TO REMAIN IN
<br />PLACE AND UNDISTURBED DURING CONSTRUCTION. EXISTING CASTINGS AND
<br />STRUCTURES TO REMAIN SHALL BE ADJUSTED TO MATCH THE PROPOSED FINISHED
<br />GRADES.
<br />5.BACKFILL FOR UTILITY LINES SHALL BE PLACED PER DETAILS, STANDARDS, AND
<br />SPECIFICATIONS SO THAT THE UTILITY WILL BE STABLE. WHERE UTILITY LINES CROSS THE
<br />PARKING LOT, THE TOP 6 INCHES SHALL BE COMPACTED SIMILARLY TO THE REMAINDER OF
<br />THE LOT. UTILITY DITCHES SHALL BE VISUALLY INSPECTED DURING THE EXCAVATION
<br />PROCESS TO ENSURE THAT UNDESIRABLE FILL IS NOT USED.
<br />6.CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF 4" OF TOPSOIL
<br />AT COMPLETION OF WORK. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED
<br />BY CONSTRUCTION SHALL BE REGRADED AND SODDED.
<br />7.AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT,
<br />CONTRACTOR SHALL TEST AND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING.
<br />ALL AREAS SHALL ADEQUATELY DRAIN TOWARDS THE INTENDED STRUCTURE TO CONVEY
<br />STORM RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF
<br />ANY DISCREPANCIES ARE DISCOVERED.
<br />8.WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE
<br />CONTRACTOR SHALL SAW CUT FULL DEPTH FOR A SMOOTH AND STRAIGHT JOINT AND
<br />REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR
<br />AS INDICATED.
<br />9.THE CONTRACTOR SHALL INSTALL PROTECTION OVER ALL DRAINAGE STRUCTURES FOR
<br />THE DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE
<br />OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED
<br />DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS.
<br />10.IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE
<br />REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE
<br />DESIGN ENGINEER PRIOR TO ANY EXCAVATION.
<br />11.FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL
<br />JURISDICTIONAL AGENCY OR TO STATE DOT STANDARDS. IN THE EVENT THAT THE
<br />CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
<br />AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
<br />12.ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS.
<br />THE AREAS SHALL THEN BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED,
<br />MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN
<br />ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF
<br />THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
<br />OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED AND MULCHED AS SHOWN ON
<br />THE LANDSCAPING PLAN.
<br />13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING
<br />AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER
<br />SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL
<br />COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL
<br />PROTECTION.
<br />14.SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES
<br />WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS
<br />NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES.
<br />15.THE CONTRACTOR SHALL ENSURE THAT LANDSCAPE ISLAND PLANTING AREAS AND OTHER
<br />PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS.
<br />THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL
<br />FROM ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL
<br />MANNER.
<br />16.THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER
<br />MANUFACTURER'S RECOMMENDATIONS AND STATE DOT SPECIFICATIONS.
<br />17.PAVEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE RECOMMENDATION OF THE
<br />SITE SPECIFIC GEOTECHNICAL EVALUATION REPORT AND CITY & STATE DOT
<br />SPECIFICATIONS.
<br />18.SPOT ELEVATIONS REPRESENT THE FINISHED SURFACE GRADE OR FLOWLINE OF CURB
<br />UNLESS OTHERWISE NOTED.
<br />19.LIMITS OF CONSTRUCTION ARE TO THE PROPERTY LINE UNLESS OTHERWISE SPECIFIED
<br />ON THE PLAN.
<br />20.IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL
<br />FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS.
<br />21.THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES,
<br />AND SHALL REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT OCCUR DURING
<br />CONSTRUCTION WITHOUT COMPENSATION.
<br />22.BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE.
<br />23.ALL PROPOSED GRADES ONSITE SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE
<br />INDICATED ON THE PLANS. ANY SLOPES STEEPER THAN 4:1 REQUIRE EROSION AND
<br />SEDIMENT CONTROL BLANKET.
<br />24.ADHERE TO ALL TERMS AND CONDITIONS AS NECESSARY IN THE GENERAL N.P.D.E.S.
<br />PERMIT AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR STORMWATER
<br />DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES.
<br />25.ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND
<br />CONTINUOUS GRADE.
<br />WATER STORM SEWER & SANITARY SEWER
<br />NOTES
<br />1.THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES, GRAVITY
<br />SEWER LINES, AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON
<br />THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS,
<br />EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY
<br />TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN,
<br />DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS
<br />AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT
<br />DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT,
<br />THE MOST STRINGENT SHALL GOVERN.
<br />2.ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE
<br />CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND
<br />COORDINATION IN ACCORDANCE WITH THE NOTES CONTAINED IN THE GENERAL
<br />CONSTRUCTION SECTION OF THIS SHEET.
<br />3.THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS SHOWN
<br />OTHERWISE.
<br />4.DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE
<br />MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND
<br />FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF
<br />ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER THE PIPE
<br />HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED
<br />ACCORDING TO THE PLANS.
<br />5.ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S
<br />RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR
<br />LINING IN ANY D.I. PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS
<br />FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER,
<br />RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR USE
<br />SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL
<br />BE REPLACED AT THE CONTRACTOR'S EXPENSE.
<br />6.WATER FOR FIRE FIGHTING SHALL BE MADE AVAILABLE FOR USE BY THE CONTRACTOR
<br />PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE.
<br />7.ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING
<br />SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING
<br />JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT
<br />DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT,
<br />THE MOST STRINGENT SHALL GOVERN.
<br />8.UNDERGROUND UTILITY LINES SHALL BE SURVEYED BY A STATE LICENSED PROFESSIONAL
<br />LAND SURVEYOR PRIOR TO BACK FILLING.
<br />9.CONTRACTOR SHALL PERFORM, AT THEIR OWN EXPENSE, ANY AND ALL TESTS REQUIRED
<br />BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY
<br />INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION
<br />INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS
<br />SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER AND JURISDICTIONAL AGENCY AS
<br />REQUIRED.
<br />10.BETWEEN WATER AND SEWER MANHOLES AND PIPES, CONTRACTOR SHALL PROVIDE FOR
<br />A MINIMUM HORIZONTAL CLEARANCE OF 10-FEET AND A MINIMUM VERTICAL SEPARATION
<br />OF 18-INCHES.
<br />11.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT
<br />SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING
<br />STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER.
<br />12.ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION
<br />AT STRUCTURE IS WATERTIGHT UNLESS OTHERWISE STATED BY CITY AND STATE DESIGN
<br />STANDARDS AND SPECIFICATIONS.
<br />13.UNLESS OTHERWISE STATED IN CITY AND STATE DESIGN STANDARDS AND
<br />SPECIFICATIONS, ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH
<br />PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED
<br />AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER".
<br />EXISTING CASTINGS AND STRUCTURES WITHIN PROJECT LIMITS SHALL BE ADJUSTED TO
<br />MEET THESE CONDITIONS AND THE PROPOSED FINISHED GRADE.
<br />14.TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND
<br />SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN
<br />ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR
<br />EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER
<br />FOR REVIEW.
<br />15.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE
<br />CONSTRUCTED TO SAME.
<br />16.ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR FROM
<br />INVERT IN TO INVERT OUT.
<br />17.ROOF DRAINS SHALL BE CONNECTED TO STORM SEWER BY PREFABRICATED WYES OR AT
<br />STORM STRUCTURES. ROOF DRAINS AND TRUCK WELL DRAIN SHALL RUN AT A MINIMUM
<br />1% SLOPE, UNLESS NOTED OTHERWISE, AND TIE IN AT THE CENTERLINE OF THE STORM
<br />MAIN.
<br />18.PROVIDE INSULATION OF UNDERGROUND ROOF DRAINS AND SANITARY SEWER SERVICES
<br />IF ADEQUATE FROST DEPTH CANNOT BE PROVIDED.
<br />19.THE CONTRACTOR SHALL PROTECT EXISTING UNDERGROUND UTILITIES AND
<br />APPURTENANCES THAT ARE TO REMAIN FROM DAMAGE DURING CONSTRUCTION
<br />OPERATIONS.
<br />20.THE LOCATION OF EXISTING UTILITIES, STORM DRAINAGE STRUCTURES AND OTHER ABOVE
<br />AND BELOW-GRADE IMPROVEMENTS ARE APPROXIMATE AS SHOWN. IT IS THE
<br />CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION, SIZE AND INVERT
<br />ELEVATIONS OF EACH PRIOR TO THE START OF CONSTRUCTION.
<br />21.A MINIMUM SEPARATION OF 5-FEET IS REQUIRED BETWEEN UNDERGROUND UTILITIES AND
<br />TREES UNLESS A ROOT BARRIER IS UTILIZED.
<br />22.GAS, PHONE AND ELECTRIC SERVICES SHOWN FOR INFORMATIONAL PURPOSES ONLY.
<br />DRY UTILITY COMPANIES MAY ALTER THE DESIGN LAYOUT DURING THEIR REVIEW.
<br />CONTRACTOR TO COORDINATE FINAL DESIGN AND INSTALLATION WITH UTILITY
<br />COMPANIES.
<br />23.COORDINATE UTILITY INSTALLATION WITH IRRIGATION DESIGN AND INSTALLATION.
<br />24.ALL DIMENSIONS ARE TO FLOW LINE OF CURB UNLESS OTHERWISE NOTED. PERIMETER
<br />WALL DIMENSIONS ARE TO INSIDE WALL FACE. REFERENCE ARCHITECTURAL PLANS FOR
<br />EXACT WALL WIDTH AND SPECIFICATIONS.
<br />25.REFERENCE ARCHITECTURAL PLANS (BY OTHERS) FOR EXACT BUILDING DIMENSIONS,
<br />MATERIALS SPECIFICATIONS.
<br />26.REFERENCE M.E.P. PLANS (BY OTHERS) FOR MECHANICAL EQUIPMENT DIMENSIONS AND
<br />SPECIFICATIONS.
<br />27.CONTRACTOR SHALL REFERENCE STRUCTURAL PLANS (BY OTHERS) FOR FOOTING AND
<br />FOUNDATION PAD PREPARATION SPECIFICATIONS.
<br />28.CONTRACTOR SHALL REFERENCE M.E.P PLANS (BY OTHERS) FOR ROUTING OF PROPOSED
<br />ELECTRICAL & COMMUNICATIONS SERVICES AND SITE LIGHTING LAYOUT.
<br />THIRD PARTY SUPPLEMENTAL INFORMATION
<br />KIMLEY-HORN ASSUMES NO LIABILITY FOR ANY ERRORS, INACCURACIES, OR OMISSIONS
<br />CONTAINED WITHIN SUPPLEMENTAL INFORMATION PROVIDED BY THIRD PARTY CONSULTANTS.
<br />1.BOUNDARY & TOPOGRAPHIC SURVEY
<br />PERFORMED BY: CORNERSTONE LAND SURVEYING, INC
<br />ADDRESS: 1970 NORTHWESTERN AVE. SUITE 200 STILLWATER, MN 55082
<br /> PHONE: 651-275-8969
<br /> DATED: 12/09/2023
<br />2.GEOTECHNICAL EVALUATION REPORT
<br />PERFORMED BY: AMERICAN ENGINEERING TESTING
<br />ADDRESS: 550 CLEVELAND AVE. N ST PAUL, MN 55114
<br />· PHONE: 651-659-9001
<br />DATED: 05/12/2023
<br />C100
<br />GENERAL NOTES
|