Laserfiche WebLink
WETLAND-6WETLAND-7EXISTING PONDWETLAND-5WETLAND-3WETLAND-2WETLAND-8ROSEMARY WAY N.VICTOR HUGO BLVD8" PVC (PER RECORD DRAWING)INV: 905.89 (PER RECORD DRAWING)INV: 915.17 (PER RECORD DRAWING)INV (S): 914.80INV (N): 914.7021" RCP (PER RECORD DRAWING)INV: 917.81 (PER RECORD DRAWING)18" (PER RECORD DRAWING)B-07B-01B-08B-09B-10B-03B-11B-04B-02B-12B-13B-05B-06B-16B-18B-15B-17B-1424" (PER RECORD DRAWING)18" RCP (PER RECORD DRAWING)8" (PER RECORD DRAWING)1122334444555555WETLAND-7 IMPACT: 5,753 SFWETLAND-5 IMPACT: 3,138 SFWETLAND-3 IMPACT: 4,351 SFWETLAND-6 IMPACT: 5,484 SF666DescriptionRev.DateHUGO WESTAPARTMENTSHUGO, MN 55038Sheet Title:Project #:Drawn By:Checked By:Issue Date:12246027.000NJNBDMxx.xx.20243524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.P:\Projects\Projects - 2024\12246027 - Hugo West Apartments\2. Design\b. Drawing Files\12246027 - C100 - Demo.dwgLarsonEngineering, Inc.Project Title:Client:Date: Lic. No.:xx.xx.2024I hereby certify that this plan,specifications or report was preparedby me or under my direct supervisionand that I am a duly licensedProfessional Engineer under the lawsof the state of Minnesota.07/09/2024 CITY SUBMITTAL - NOT FOR CONSTRUCTION0NORTH153060Sheet:SUMMITMANAGEMENT, LLC6770 STILLWATER BLVD, SUITE 110STILLWATER, MN 55082Bryan D. Miller, P.E.54950DEMOLITION PLANDEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessary utilitydemolitions and relocations from existing utility locations to all onsite amenitiesand buildings. These connections include, but are not limited to, water, sanitarysewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.REMOVE AND DISPOSE OF BITUMINOUS PAVEMENTREMOVE AND DISPOSE OF CONCRETE PAVEMENTREMOVE AND DISPOSE OF CONCRETE CURB AND GUTTERREMOVE AND DISPOSE OF STORM SEWER PIPE AND/OR STRUCTUREREMOVE AND DISPOSE OF TREE, STUMP, AND ROOTSCAP EXISTING STORM SEWER TO REMAIN IN ACCORDANCE WITH CITYREQUIREMENTS.12C100REMOVE AND DISPOSE OFBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OFCONCRETE PAVEMENT SECTIONPROPOSED WETLAND IMPACT (18,726 SF)REMOVE AND DISPOSE OF TREE, STUMP, AND ROOTSAPPROXIMATE BORING LOCATIONSEE PROJECT GEOTECHNICAL REPORTSYMBOL LEGENDGENERALKEY NOTESEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINESETBACK LINE3456