Laserfiche WebLink
EXISTING PONDWETLAND-3WETLAND-2WETLAND-8ROSEMARY WAY N.VICTOR HUGO BLVDNO PARKINGELECTRICVEHICLEELECTRICVEHICLEELEC <br />TR <br />ICVEHIC <br />LEELEC <br />TR <br />ICVEHIC <br />LE <br />93 UNITAPARTMENT BUILDINGFFE = 922.00 (ARCH 100'-00")NEW 40 UNIT GARAGEFFE = 922.00 (ARCH 100'-00")NEW 17 UNIT GARAGEFFE = 922.00 (ARCH 100'-00")NEW 20 UNIT GARAGEFFE = 922.00PROPOSED LOT LINEPROPOSED LOT LINEE <br />X <br />I <br />T DescriptionRev.DateHUGO WESTAPARTMENTSHUGO, MN 55038Sheet Title:Project #:Drawn By:Checked By:Issue Date:12246027.000NJNBDMxx.xx.20243524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.P:\Projects\Projects - 2024\12246027 - Hugo West Apartments\2. Design\b. Drawing Files\12246027 - C500 - Landscape.dwgLarsonEngineering, Inc.Project Title:Client:Date: Lic. No.:xx.xx.2024I hereby certify that this plan,specifications or report was preparedby me or under my direct supervisionand that I am a duly licensedProfessional Engineer under the lawsof the state of Minnesota.07/09/2024 CITY SUBMITTAL - NOT FOR CONSTRUCTION0NORTH153060Sheet:SUMMITMANAGEMENT, LLC6770 STILLWATER BLVD, SUITE 110STILLWATER, MN 55082Bryan D. Miller, P.E.54950LANDSCAPEPLANC500TREESSymbol Qty. Common Name SizeNote: Approximate planting locations and quantities are shown onthe plan. Final species and locations shall be approved by Ownerprior to planting, in accordance with City planting requirements.24Colorado Spruce6', B&B9American Red Maple2.5", B&B8Hackberry2.5", B&B18Red Jule Crab1.5", B&B4Purple Leaf Plum3 GAL8Sugar Maple2.5", B&B11River Birch2.5', B&BSHRUBSSymbol Qty. Common Name Size90Anthony Waterer Spirea15"90Little Princess Spirea15"50Isanti Dogwood24"85Scandia Juniper15"NATIVE SEED MIXMNDOT SEED MIXTURE #33-261LAWN AREASMNDOT SEED MIXTURE #25-131LANDSCAPING NOTES1.All work within the public ROW shall be restored in accordance with City ofHugo standard specifications and construction requirements.2.All other disturbed areas shall be restored with 4” of good quality topsoiland seed, or as otherwise specified.3.All areas shall be seeded and fertilized in accordance with the MnDOTSeeding Manual, latest edition.4.Landscape contractor to provide services for design-build undergroundirrigation system. All lanscaping including Lawn Areas (seed & sod),shrubs, and trees shall be irrigated unless otherwise directed by Owner.SOIL DECOMPACTION NOTES1.Soil surfaces compacted during construction to remain pervious uponcompletion of construction shall be decompacted prior to final seeding andlandscape establishment.2.These soils shall be scarified and/or amended to restore soil structure andpromote permeability of post-development conditions.3.All decompaction and soil amendment methods shall be in accordance withlocal watershed and/or Minnesota Stormwater Manual recommendationsfor alleviating compaction from construction activity.4.Avoid decompacting soil surfaces that may compromise the integrity of anyutilities, buildings, pavement, existing tree roots, slope stability, etc.PLANTING CALCULATIONSPARKING & LOADING AREA CALCULATIONSINTERIOR PARKING LOT AREA=60,688 SF±REQUIRED INTERIOR LANDSCAPING=5% x 60,688 SFREQUIRED=3,035 SFPROVIDED =3,427 SF±PLANTING CALCULATIONS:1 DECIDUOUS TREE PER UNIT =93 DECIDUOUSREQUESTED/PROVIDED=42 1 CONIFEROUS TREE PER UNIT =93 CONIFEROUSREQUESTED/PROVIDED=561 ORNAMENTAL PER 1,000 SF BLDG=46 ORNAMENTALSREQUESTED/PROVIDED=371 SHRUB PER 200 SF BLDG=230 SHRUBSREQUESTED/PROVIDED=31532Black Hills Spruce6', B&B6Red Oak2.5", B&BPLANTING LEGENDLAWN AREASSODWOOD MULCH PLANTING BEDOVER GEOTEXTILE FABRICSEE MULCH BED & SHRUB PLANTING DETAILORNAMENTALCONIFERSDECIDUOUS15Firebird Crabapple1.5", B&B