Laserfiche WebLink
CITY OF HUGO <br /> ATTACHMENT TO ORDINANCE NO.2024-537 <br /> 2024-2025 FEES,RATES AND CHARGES <br /> ESCROW <br /> FEES AND OTHER <br /> PLANNING&ZONING RELATED:(continued) <br /> STREET&ROADWAY RELATED: <br /> Street and Easement Vacation $ 110.00 $ 1,000.00 <br /> SUBDIVISION RELATED: Payable with Preliminary AND Final Plat Applications <br /> Minor Subdivision-Rural(3 lots or less) $ 220.00 $ 1,000.00 <br /> Minor Subdivision-Urban(3 lots or less) $ 220.00 $ 2,000.00 <br /> Subdivision-4 to 15 lots $ 540.00 $ 5,000.00 <br /> Subdivision-16 to 30lots $ 700.00 $ 10,000.00 <br /> Subdivision-31 to 100 lots $25 per lot $ 20.000.00 <br /> Subdivision-Over 100 Lots $25 per lot $ 30,000.00 <br /> VARIANCE RELATED: <br /> Variance to Zoning Ordinance $ 200.00 <br /> Minor Deviations to Zoning Ordinance $ 200.00 <br /> PUBLICATIONS: <br /> Audit/Comprehensive Plan $ 55.00 <br /> Municipal Code $ 125.00 <br /> Zoning Map $ 7.00 <br /> Zoning Ordinance $ 65.00 <br /> Other Publications Cost+10% <br /> DVD Recordings $ 10.00 Official Newspaper Exempt <br /> PUBLIC WORKS RELATED: <br /> Grass/Weed Mowing(with zero-turn mower only) $ 130.00 first half hour(minimum charge) <br /> Grass/Weed Mowing(with zero-turn mower only) $ 130.00 each additional hour or fraction thereof <br /> Maintenance Worker(no equipment) $ 80.00 per hour <br /> Maintenance Worker w/pickup truck $ 130.00 per hour <br /> All Other Equipment w/operator $ 205.00 per hour <br /> ROADWAY RECONSTRUCTION/REHAB: <br /> Single-Family Residential/Duplex Rates: <br /> Complete Reconstruction $ 5,200.00 per unit <br /> Partial Reconstruction $ 4,100.00 per unit <br /> Roadway Reclamation/Overlay $ 3,400.00 per unit <br /> Urban Roadway Overlay $ 2,100.00 per unit <br /> Rural Roadway Overlay $ 1,800.00 per unit <br /> UTILITY RELATED: <br /> Water Utility Permit $ 30.00 <br /> Water Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit as determined by MCES <br /> Sewer Utility Permit $ 30.00 <br /> Sewer Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit as determined by MCES <br /> City Sewer Availability Charges(SAC): <br /> Sewer Infrastructure Trunk Fee $ 1,632.00 per SAC unit as determined by MCES <br /> Sewer Infrastructure Connection Fee $ 588.00 per SAC unit as determined by MCES <br /> -Total SAC Fee $ 2,220.00 <br /> City Water Availability Charges(WAC): <br /> Water Infrastructure Trunk Fee $ 1,960.00 per SAC unit as determined by MCES <br /> Water Infrastructure Connection Fee $ 680.00 per SAC unit as determined by MCES <br /> -Total WAC Fee $ 2,640.00 <br /> Water Meter Rental-Standard Residential 3/4" $ 470.00 plus sales tax of$39.37 <br /> Water Meter Rental-Commercial-1"Meter $ 615.00 E-Series plus sales tax of$51.51 <br /> Water Meter Rental-Commercial-1&1/2"Meter $ 1,090.00 E-Series plus sales tax of$91.30 <br /> Water Meter Rental-Commercial-2"Meter $ 1,380.00 E-Series plus sales tax of$115.58 <br /> Water Meter Rental-Commercial-Larger than 2" Cost+10% Not a stocked item Call for availability and pricing <br /> Water Meter Rental-Irrigation-1"Meter $ 645.00 +1 WAC Fee$2,640 plus sales tax of$54.02 <br /> Water Meter Rental-Irrigation-1&1/2"Meter $ 1,120.00 +2 WAC Fees$5,280 plus sales tax of$93.80 <br /> Water Meter Rental-Irrigation-2"Meter $ 1,410.00 +2 WAC Fees$5,280 plus sales tax of$118.10 <br /> Water Meter Rental-Irrigation-Larger than 2" Cost+10% +WAC Fees as determined by City Engineer <br /> Page 3 <br />