Laserfiche WebLink
Feasibility Report <br />2025 Beaver Ponds Area Street Improvement Project <br />City of Hugo <br />WSB Project No. 026749-000 Page 9 <br />8. Feasibility and Recommendation <br />The proposed improvements for the 2025 Beaver Ponds Area Street Improvement <br />Project consist of roadway mill and overlay improvements. <br />The estimated cost of the street improvement project is $1,543,300. <br />Based on the information contained within this report, the proposed improvements as <br />described can be considered necessary, cost-effective, and feasible from an <br />engineering perspective. WSB recommends construction of the proposed <br />improvements as detailed in this report. The economic feasibility of this project will <br />be determined by the City Council.