|
MN/DOT
<br />SPECIFICATION
<br />NO.
<br />DESCRIPTION UNIT
<br />ESTIMATED
<br />QUANTITY
<br />ESTIMATED
<br />UNIT PRICE
<br />ESTIMATED
<br />TOTAL
<br />2021.501 MOBILIZATION L S 1 $55,700.00 $55,700.00
<br />2104.502 REMOVE CASTING EACH 50 $100.00 $5,000.00
<br />2104.503 REMOVE CONCRETE CURB L F 5000 $15.00 $75,000.00
<br />2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 200 $10.00 $2,000.00
<br />2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F 200 $6.00 $1,200.00
<br />2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 200 $10.00 $2,000.00
<br />2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 200 $10.00 $2,000.00
<br />2104.504 REMOVE BITUMINOUS PAVEMENT S Y 3500 $5.00 $17,500.00
<br />2104.518 REMOVE CONCRETE WALK S F 100 $6.00 $600.00
<br />2104.518 REMOVE BIUTUMINOUS WALK S F 10000 $1.50 $15,000.00
<br />2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR 40 $150.00 $6,000.00
<br />2231.509 BITUMINOUS PATCHING MIXTURE TON 500 $180.00 $90,000.00
<br />2232.504 MILL BITUMINOUS SURFACE (2") S Y 34900 $2.50 $87,250.00
<br />2331.501 JOINT ADHESIVE L F 19900 $1.00 $19,900.00
<br />2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 3500 $3.50 $12,250.00
<br />2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) TON 5200 $85.00 $442,000.00
<br />2504.602 IRRIGATION SYSTEM REPAIR EACH 10 $500.00 $5,000.00
<br />2504.602 ADJUST GATE VALVE AND BOX EACH 30 $500.00 $15,000.00
<br />2506.502 CASTING ASSEMBLY EACH 50 $1,250.00 $62,500.00
<br />2506.602 CHIMNEY SEALS EACH 50 $350.00 $17,500.00
<br />2531.503 CONCRETE CURB AND GUTTER DESIGN B618 L F 5000 $28.00 $140,000.00
<br />2531.518 6" CONCRETE WALK SF 600 $10.00 $6,000.00
<br />2531.518 3" BITUMINOUS WALK SF 9920 $3.00 $29,760.00
<br />2531.518 TRUNCATED DOMES SF 100 $50.00 $5,000.00
<br />2563.601 TRAFFIC CONTROL L S 1 $5,000.00 $5,000.00
<br />2573.502 STORM DRAIN INLET PROTECTION EACH 80 $250.00 $20,000.00
<br />2573.503 SILT FENCE, TYPE MS L F 500 $3.75 $1,875.00
<br />2573.503 SEDIMENT CONTROL LOG TYPE STRAW BIOROLL L F 1000 $5.00 $5,000.00
<br />2574.507 COMMON TOPSOIL BORROW C Y 200 $42.00 $8,400.00
<br />2574.508 FERTILIZER TYPE 3 LB 90 $5.00 $450.00
<br />2575.505 SEEDING ACRE 0.3 $2,500.00 $750.00
<br />2575.508 SEED MIXTURE 25-131 LB 60 $5.00 $300.00
<br />2575.508 HYDRAULIC BONDED FIBER MATRIX LB 600 $3.00 $1,800.00
<br />2575.523 RAPID STABILIZATION METHOD 3 M GALLONS 5 $1,500.00 $7,500.00
<br />2575.523 WATER M GALLONS 60 $65.00 $3,900.00
<br />STORM SEWER IMPROVEMENTS L S 1 $20,000.00 $20,000.00
<br />A. SURFACE IMPROVEMENTS CONSTRUCTION TOTAL $1,169,135.00
<br />+10% CONTINGENCY $116,913.50
<br />A. SURFACE IMPROVEMENTS DUCK PASS SUBTOTAL $1,286,048.50
<br />+ 20% INDIRECT COSTS $257,209.70
<br />A. SURFACE IMPROVEMENTS TOTAL $1,543,258.20
<br />2025 BEAVER PONDS AREA STREET IMPROVEMENT PROJECT
<br />A. SURFACE IMPROVEMENTS
|