My WebLink
|
Help
|
About
|
Sign Out
Home
2024.12.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.12.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 4:23:55 PM
Creation date
1/2/2025 4:17:01 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/2/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C:\Users\michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\1YNZS8FT\MEMO-Order Improvements and Auth Prep of Plans and <br />Specs 120224 (003).docxC:\Users\michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\1YNZS8FT\MEMO-Order Improvements and <br />Auth Prep of Plans and Specs 120224 (003).docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br /> <br />To: Honorable Mayor and City Council <br /> Bryan Bear, City Administrator <br /> <br />From: Mark Erichson, City Engineer <br /> <br />Date: November 22, 2024 <br /> <br />Re: 2025 Beaver Ponds Area Street Improvement Project <br /> WSB Project No. 026749-000 <br /> <br /> <br />On September 16, 2024, City Council authorized the preparation of a feasibility study for the <br />2025 Beaver Ponds Area Street Improvement Project. City Council accepted the competed <br />study at the November 4, 2024 City Council meeting and called for a Public Hearing to be <br />held on December 2, 2024. <br /> <br />The 2025 Beaver Ponds Area Street Improvement Project consists of roadway milling and <br />paving, spot curb replacement, and trail replacement improvements. <br /> <br />The project costs are summarized as follows: <br /> <br />2025 Beaver Ponds Area Street Improvement Project <br />City of Hugo, MN <br />Project Costs and Funding <br />Improvements City Fund <br />Special <br />Assessments Total <br />A. Surface Improvements $1,205,489.80 $337,810.20 $1,543,300 <br />Total Improvements $1,205,489.80 $337,810.20 $1,543,300 <br /> <br />Staff will detail the proposed improvements and findings of the feasibility study with a <br />PowerPoint presentation for the public hearing. <br /> <br />Staff recommends approval of the resolution ordering the project and authorizing the <br />preparation of plans and specifications for the 2025 Beaver Ponds Area Street Improvement <br />Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.