Laserfiche WebLink
<br />C:\Users\michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\1YNZS8FT\MEMO-Order Improvements and Auth Prep of Plans and <br />Specs 120224 (003).docxC:\Users\michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\1YNZS8FT\MEMO-Order Improvements and <br />Auth Prep of Plans and Specs 120224 (003).docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br /> <br />To: Honorable Mayor and City Council <br /> Bryan Bear, City Administrator <br /> <br />From: Mark Erichson, City Engineer <br /> <br />Date: November 22, 2024 <br /> <br />Re: 2025 Beaver Ponds Area Street Improvement Project <br /> WSB Project No. 026749-000 <br /> <br /> <br />On September 16, 2024, City Council authorized the preparation of a feasibility study for the <br />2025 Beaver Ponds Area Street Improvement Project. City Council accepted the competed <br />study at the November 4, 2024 City Council meeting and called for a Public Hearing to be <br />held on December 2, 2024. <br /> <br />The 2025 Beaver Ponds Area Street Improvement Project consists of roadway milling and <br />paving, spot curb replacement, and trail replacement improvements. <br /> <br />The project costs are summarized as follows: <br /> <br />2025 Beaver Ponds Area Street Improvement Project <br />City of Hugo, MN <br />Project Costs and Funding <br />Improvements City Fund <br />Special <br />Assessments Total <br />A. Surface Improvements $1,205,489.80 $337,810.20 $1,543,300 <br />Total Improvements $1,205,489.80 $337,810.20 $1,543,300 <br /> <br />Staff will detail the proposed improvements and findings of the feasibility study with a <br />PowerPoint presentation for the public hearing. <br /> <br />Staff recommends approval of the resolution ordering the project and authorizing the <br />preparation of plans and specifications for the 2025 Beaver Ponds Area Street Improvement <br />Project. <br />