Laserfiche WebLink
<br /> <br /> <br /> <br />14669 Fitzgerald Avenue North, Hugo, MN 55038   • (651) 762‐6300  •   www.ci.hugo.mn.us  <br />  <br />  <br />  <br />  <br />  <br />TO: Honorable Mayor Tom Weidt and Members of the City Council  <br />FROM: Anna Wobse, Finance Director  <br />SUBJECT: 2025 Fees, Rates and Charges  <br />DATE: For the City Council Meeting of December 16, 2024  <br />  <br />  <br />DESIRED COUNCIL ACTION  <br />  <br />Adopt Ordinance Approving 2025 Fees, Rates and Charges  <br />  <br />INTRODUCTION  <br />  <br />In the fall of 2001, the City Council engaged the consulting firm of ISM, Inc., to undertake a study to determine if fees,  <br />rates and charges were adequate to finance the proposed 2002 budget and five‐year Capital Improvement Program.   <br />Specific attention was paid to fees charged as opposed to property taxes when there is not necessarily a direct benefit  <br />to a majority of citizens.  In short, fees are paid by those who benefit most.  The fees included in the report considered  <br />the past operating cost of each fund and department and allocated administrative costs appropriately.  Ultimately, the  <br />City Council adopted a schedule of fees, rates and charges that were based upon the study.  Staff was instructed to  <br />review these charges annually to ensure adequate reserves and fund balances.    <br />  <br />Since the authority to establish the various fees is found throughout the municipal code, the City Attorney drafted and  <br />the City Council adopted an ordinance that contained a comprehensive list of fees for easy reference.  <br />  <br />In keeping with the City Council’s instructions, the Finance Department consulted with the various department heads  <br />and drafted a recommended fee schedule for 2025.  The Finance Department offers the following with respect to each  <br />different type of fee that is proposed to change.    <br />  <br />DEVELOPMENT RELATED  <br />  <br />Developers are charged Street Maintenance fees as part of the Development Agreement. The fee collected is used to  <br />cover the cost of the first chip seal of the streets in the Plat, however Public Works and Engineering staff are no longer  <br />recommending chip seals as part of the pavement preservation practice due to performance issues.    Staff has  <br />reviewed the use of a different product by Corrective Asphalt Materials called Reclamite.  The City Engineer is  <br />recommending that the fee be increased to $4.50 per lineal foot to reflect the updated cost of the Reclamite. The fee is  <br />calculated per lineal foot and is based on the length of streets within the Plat.    <br />  <br />PUBLIC WORKS RELATED  <br /> <br />Fees for Public Works personnel and equipment charges were first added to the fee schedule in 2013 and were  <br />adjusted last year.   These are fees charged for a service performed that is over and above what is normally offered.   <br />Staff is recommending an increase in the hourly rates to reflect updated employee wages, insurance costs and  <br />equipment costs.    <br />  <br />  <br />  <br />  <br />