My WebLink
|
Help
|
About
|
Sign Out
Home
2024.12.16 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.12.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 4:22:59 PM
Creation date
1/2/2025 4:17:42 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/16/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QTY Unit - Item - Description Unit Price Total <br />1 <br />Training Room <br />Paint walls, door frames & steel door <br />Walls = 1408 sq. ft. <br />Door frames = 9 <br />Door Win Fr. = 5 <br />Steel door = 2 <br />$ 1,925.00 $ 1,925.00 <br />1 <br />Kitchen Area <br />Prep and paint door frames <br />Door frames = 2 <br />Door Win. Ft. = 2 <br />$ 220.00 $ 220.00 <br />1 <br />South Vestibule <br />Paint walls & ceiling <br />Walls = 256 sq. ft. <br />Ceiling = 63 sq. ft. <br />$ 225.00 $ 225.00 <br />1 <br />Women's Restroom - Paint <br />Paint walls, ceiling & door frame <br />Walls = 608 sq. ft. <br />Ceiling = 182 sq. ft. <br />Door frame = 1 <br />$ 715.00 $ 715.00 <br />1 <br />Men's Restroom - Paint <br />Paint walls, ceiling & door frame <br />Walls = 728 sq. ft. <br />Ceiling = 266 sq. ft. <br />Door frame = 1 <br />$ 905.00 $ 905.00 <br />>This bid is valid for 90 days from the date above. Beyond that date Fresh Paint reserves the right to reevaluate our bid and adjust if necessary. <br />>Prices include labor, materials, taxes and insurance. <br />>All materials to be top quality as specified by the manufacturer. <br />>All movable items within areas to be painted will be moved by client staff to allow adequate access of 4’ or more prior to our arrival. Any items that <br />need to be moved by Fresh Paint will be done on T & M and Fresh Paint will not be held liable for any damages. <br />Grand Total - > $ 8,120.00 <br />Downpayment: <br />>All materials to be applied in strict accordance with manufacturer's specifications regarding surface preparation and coating application. <br />>All edges and joints between surfaces to be clean and sharp. <br />>Prices include Clean; minor spackling; prime as necessary; finish. <br />>Wall finish coats to be applied by rolling, to achieve a durable stippled finish with an approximate dry PFT (paint film thickness) of 1.5 mils per <br />coat. <br />>Job site to be left neat and clean at the end of each workday. <br />Client agrees to all terms and conditions of this contract proposal, on both front and reverse <br />sides. <br />_________________ <br />FRESH PAINT INC <br /> _________________ <br />DATE <br /> ________________ <br /> CLIENT <br /> _______________ <br /> DATE <br />Fresh Paint adheres to the standards of the Painting Contractors Association (PCA) in all of our work. Learn more by visiting https://freshpaintinc.com <br />/pca-standards/ to review the full PCA Standards. <br />11/07/2024
The URL can be used to link to this page
Your browser does not support the video tag.