Laserfiche WebLink
Enterprise Energy, LLC. Solar Farm Site Plan and IUP <br /> Page 8 <br /> installation of solar panels will not significantly change the direction or runoff, and the site will <br /> drain as it currently drains. The stormwater plan meets the City's volume and rate control <br /> requirements to approve a stormwater permit. The applicant shall continue to work the staff on <br /> any additional measures necessary to obtain the stormwater permit prior to the issuance of a <br /> building permit. <br /> Utilities <br /> The proposed use does not require servicing for water or sanitary sewer. The solar panels will <br /> connect to the metering equipment via an underground conduit, and interconnects to the existing <br /> power distribution network operated by Xcel Energy. The solar farm will include an overhead <br /> utility pole that will connect to a second utility pole maintained by Xcel Energy. <br /> Streets and Access <br /> The site has adequate access from Everton Avenue North via the proposed access roads. <br /> Wetlands <br /> The property has approximately 3.6 acres of wetland. A portion of the solar array will be <br /> constructed within the wetlands,which is permitted by ordinance. The Technical Evaluation Panel <br /> (TEP)has reviewed and approved the request for a no-loss exemption for the solar panel locations. <br /> Park Dedication <br /> The proposed use does not require park dedication. <br /> It is in staff s opinion that the application meets all of the requirements for site plan approval. <br /> 8. CONCLUSION/RECOMMENDATION: <br /> It is in staffs opinion that the requests for a solar farm site plan and IUP meets the City Code and <br /> approval criteria for a solar farm. <br /> Staff recommends approval of the solar farm site plan and interim use permit applications with the <br /> conditions listed in the attached resolution and IUP. <br /> ATTACHMENTS: <br /> 1. Site Map <br /> 2. Resolution <br /> 3. Solar Farm Interim Use Permit <br /> 4. City Engineers memo dated April 8, 2024 <br /> 5. Applicant's Narrative <br /> 6. SSTS Site Evaluation Summary Report from Kloeppner Services & Design, LLC. <br /> 7. Site Plan/Landscape Plan <br /> 8 <br />