My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 04.11.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 04.11.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 11:44:43 AM
Creation date
3/6/2025 11:33:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INTERIM USE PERMIT <br /> <br /> <br />DATE OF APPROVAL: May 6, 2024 <br /> <br />ISSUED TO: EESolar13, LLC <br /> 2925 Dean Pkwy, Exe Ste 300 <br /> Minneapolis, MN 55416 <br /> <br />PROPERTY OWNER: Katie Nguyen <br /> 2504 Helena Ave N <br /> Oakdale, MN 55128 <br /> <br />PROPERTY ADDRESS: N/A <br /> <br />PROPERTY ID: 18.031.21.43.0002 <br /> <br />EXPIRATION: Expires in 25 years (timeline beginning at the issuance of <br />the building permit) Expires when deemed abandoned. <br />Expires when EESolar13, LLC, is no longer the operator. <br /> <br />REVIEW: The permit shall be reviewed each year for the first two <br />years after installation and every five years following. <br /> <br />ZONING DISTRICT: Agricultural (AG) <br /> <br />LEGAL DESCRIPTION: See attached Exhibit A <br /> <br /> <br />THIS INTERIM USE PERMIT ALLOWS FOR THE FOLLOWING: <br /> <br />A solar farm on the property generally located east of Everton Avenue North and north of <br />149th Street North. <br /> <br />THIS INTERIM USE PERMIT IS APPROVED SUBJECT TO COMPLIANCE <br />WITH THE FOLLOWING SPECIAL CONDITIONS: <br /> <br />1. A building permit shall be required for the construction of the solar farm. <br />2. The solar farm shall operate in a manner that is consistent with applicant’s <br />narrative (Exhibit B) and applicant’s site plan (Exhibit C). <br />3. The solar farm owner/operator shall comply with the decommissioning plan <br />(Exhibit D) and decommission plan City standards outlined in Section 90-278. <br />4. The solar energy system shall not exceed 15 feet in height when oriented at <br />maximum tilt, and the elevation of the solar panels shall be level across the array. <br />5. The solar farm shall not permit light, glare, noise, odor, smoke, dust, or vibration <br />that will in any way have an objectionable effect upon adjacent or nearby property <br />owners. <br />6. It shall be the responsibility of the solar farm owner/operator or property owner to <br />secure any solar energy easements, if applicable, to protect solar access for the <br />system (as per MN Statute Section 500.30). <br />7. The landscaping shall be installed at the same time as construction of the solar <br />farm.
The URL can be used to link to this page
Your browser does not support the video tag.