Laserfiche WebLink
INTERIM USE PERMIT <br /> DATE OF APPROVAL: May 6, 2024 <br /> ISSUED TO: EESolarl3, LLC <br /> 2925 Dean Pkwy, Exe Ste 300 <br /> Minneapolis, MN 55416 <br /> PROPERTY OWNER: Katie Nguyen <br /> 2504 Helena Ave N <br /> Oakdale, MN 55128 <br /> PROPERTY ADDRESS: N/A <br /> PROPERTY ID: 18.031.21.43.0002 <br /> EXPIRATION: Expires in 25 years (timeline beginning at the issuance of <br /> the building permit) Expires when deemed abandoned. <br /> Expires when EESolarl3, LLC, is no longer the operator. <br /> REVIEW: The permit shall be reviewed each year for the first two <br /> years after installation and every five years following. <br /> ZONING DISTRICT: Agricultural (AG) <br /> LEGAL DESCRIPTION: See attached Exhibit A <br /> THIS INTERIM USE PERMIT ALLOWS FOR THE FOLLOWING: <br /> A solar farm on the property generally located east of Everton Avenue North and north of <br /> 149th Street North. <br /> THIS INTERIM USE PERMIT IS APPROVED SUBJECT TO COMPLIANCE <br /> WITH THE FOLLOWING SPECIAL CONDITIONS: <br /> 1. A building permit shall be required for the construction of the solar farm. <br /> 2. The solar farm shall operate in a manner that is consistent with applicant's <br /> narrative (Exhibit B) and applicant's site plan(Exhibit Q. <br /> 3. The solar farm owner/operator shall comply with the decommissioning plan <br /> (Exhibit D) and decommission plan City standards outlined in Section 90-278. <br /> 4. The solar energy system shall not exceed 15 feet in height when oriented at <br /> maximum tilt, and the elevation of the solar panels shall be level across the array. <br /> 5. The solar farm shall not permit light, glare, noise, odor, smoke, dust, or vibration <br /> that will in any way have an objectionable effect upon adjacent or nearby property <br /> owners. <br /> 6. It shall be the responsibility of the solar farm owner/operator or property owner to <br /> secure any solar energy easements, if applicable, to protect solar access for the <br /> system(as per MN Statute Section 500.30). <br /> 7. The landscaping shall be installed at the same time as construction of the solar <br /> farm. <br />