Laserfiche WebLink
�rt - <br /> L <br /> lie <br /> City environmental consultants reviewed the plan and made recommendations based on the <br /> other studies and plans that we submitted. Based on those recommendations, we changed <br /> vegetative screening trees to balsam fir and dogwood shrubs to ensure hardiness through diversity <br /> of species and tailored other plantings to specific soil types and hydrology. We also changed tree <br /> size to a minimum of 6 feet at the time of planting. The plan is attached as Exhibit 13. <br /> Decommissioning Plan: We prepared a decommissioning plan that addresses the specific <br /> costs and procedures associated with decommissioning the project. The solar tenant and its <br /> successors shall be responsible for decommissioning of the solar installation upon the expiration <br /> of the lease, land use permits, or the cessation of power generation for a period longer than 12 <br /> months, at which point the solar installation will be deconstructed and removed. All footings, <br /> electrical components and underground wires, fences, and other solar equipment will be removed, <br /> and the land can be reused for an alternative use. <br /> The solar installation will comply with decommissioning security requirements or procedures <br /> that are required by the land use authority. The land lease contains a contractual obligation for the <br /> solar tenant to decommission the solar installation and restore the property. It also requires that the <br /> tenant post a security for removal in the form of a bond, escrow, or letter of credit prior to <br /> construction,payable to the property owner,in the event that the land use authority does not require <br /> one. The purpose of the security is to ensure that sufficient money is set aside to remove the solar <br /> installation before it is built. <br /> Site Plan Changes: The site plan has been through multiple drafts and redesigns to comply <br /> with the new ordinance as well as in response to the results of the abovementioned work. Most <br /> noticeably,the setbacks to property lines and dwellings are far larger than before. This reduced the <br /> footprint of the project to approximately 4 acres. We also change the system from a tracker system <br /> that is organized in rows from North to South and follows the sun, to a fixed tilt system that is <br /> 4 Enterprise Energy <br /> ENTERPRISE 2925 Dean Parkway, Executive Suite 300 <br /> I ENERGY <br /> Minneapolis, MN 55416 <br /> (952) 212-0824 <br />