3 <br /> After the power is metered at the equipment pad, it interconnects into the electric utility's <br /> existing three phase distribution power distribution network. The solar installation includes a pole <br /> that houses overhead wires and leads to another pole that is controlled by the electric utility. <br /> I <br /> f <br /> The solar array will be contained within a 6 foot tall security fence described on the site plan. <br /> The fence will meet electrical code requirements and prevent people from trespassing, while <br /> allowing birds, insects, rodents, and other wildlife to pass through. <br /> Construction and Operation: We would like to begin construction as soon as summer 2024 <br /> and complete before winter. However, the actual construction process will only take about three <br /> months. We haven't set an exact groundbreaking date yet. The construction process begins with <br /> preliminary site testing for soil conditions for footings, as well as environmental, historical, and <br /> cultural diligence. That work has already been performed as part of this application. <br /> 7 Enterprise Energy <br /> ENTERPRISE 2925 Dean Parkway, Executive Suite 300 <br /> Ta. ENERGY <br /> Minneapolis, MN 55416 <br /> (952) 212-0824 <br />