Laserfiche WebLink
Enterprise Energy, LLC. Solar Farm Site Plan and IUP <br /> Page 2 <br /> 3. LEVEL OF CITY DISCRETION IN DECISION-MAKING: <br /> The City's discretion in approving or denying a site plan is limited to whether or not the proposed <br /> project complies with the Comprehensive Plan and Zoning Ordinance requirements. If it meets <br /> these standards, the City must then approve the site plan. <br /> The City's discretion in approving or denying an Interim Use Permit use permit is limited to <br /> whether or not the permit meets the standards outlined in the Comprehensive Land Use <br /> Regulations. If it meets these standards, the City must approve the interim use permit. <br /> 4. CONTEXT: <br /> A. Surrounding Land Use and Zoning <br /> The property is currently zoned Agricultural (AG) and guided for Large Lot Residential (LL) in <br /> the 2040 Land Use Plan. The surrounding properties to the north, west, and south are also zoned <br /> Agricultural and guided as Large Lot Residential, consisting of lots ranging from approximately <br /> 9-12 acres in size. The properties to the east are zoned Planned Unit Development(PUD), guided <br /> as Medium Density Residential(MD) in the 2040 Land Use Plan, and consist of townhomes in the <br /> Waters Edge development. This property is outside of the Municipal Urban Service Area(MUSA), <br /> but it is on the border with the townhome properties to the east being connected to municipal sewer <br /> and water. <br /> B. Natural Characteristics of Site <br /> The property is approximately 12 acres, and the applicant has indicated that the solar array will be <br /> constructed on approximately 5 acres in the center of the property. The property has some gently <br /> rolling terrain, with its lowest point in the south-central portion. The property contains <br /> approximately 3.6 acres of wetland. <br /> 5. ANALYSIS OF A SOLAR FARM INTERIM USE PERMIT: <br /> The zoning code outlines a number of general standards for the operation of all solar energy <br /> systems,whether it's a solar farm or accessory solar energy system. These include the requirement <br /> for a building permit,evidence of an agreement with the local utility,responsibility of the applicant <br /> to secure any solar energy easements, all solar energy components labeled in accordance with City <br /> code,all exterior electrical or service lines be buried,and all solar energy systems be in compliance <br /> with adopted city and state building codes. In addition to the general standards for all solar energy <br /> systems, there are performance standards for solar farms, which are described below: <br /> (a) Solar farms shall be located on a minimum lot size of ten acres within the Long Term <br /> Agricultural (LA), Agricultural (AG), Rural Residential(RR), and Future Urban Service (FUS) <br /> zoning districts. Solar farms may also be located in any other zoning district only in the <br /> floodplain, as long as all other conditions are met. <br /> 2 <br />