My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 04.11.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 04.11.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:42:54 PM
Creation date
3/6/2025 11:33:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enterprise Energy, LLC. Solar Farm Site Plan and IUP <br /> Page 6 <br /> The intent of the Agricultural (AG) zoning district is to provide an area for uses dependent on the <br /> inherent productivity of the land. Many of the surrounding properties are used for single-family <br /> homes or agricultural activity, which generally translate into having a low impact on adjacent <br /> properties with limited noise, traffic, etc. The applicant has indicated that there will be routine <br /> maintenance on the property, which will generally consist of a truck using the access drive at <br /> various times and will not be intrusive. The applicant has taken measures to ensure that the solar <br /> farm will be adequately screened from the view of surrounding properties. <br /> It's in staff s opinion that the request for an IUP for a solar farm will not adversely affect the <br /> surrounding area and is compatible with the character of the surrounding area. <br /> 69 The proposed solar farm shall have a set date in which the permit shall be reviewed or <br /> terminated. <br /> The applicant has requested the permit to be approved for a period of 25 years, which is the life of <br /> the applicant's agreement with Xcel Energy in purchasing the power generated by the solar farm. <br /> City staff is comfortable with approving the IUP for a 25 year period from the date of the issuance <br /> of the final building permit inspection with the allowance, required by City code, that the <br /> owner/operator of the solar farm provide the City with evidence that the solar energy system is <br /> functioning properly at any time deemed necessary by the City. The solar farm shall be reviewed <br /> every five (5) years. <br /> (g) The proposed solar farm shall be subject to any conditions that the city council deems <br /> appropriate for the permission of the use. <br /> City staff have reviewed the application for a solar farm interim use permit and have outlined <br /> conditions of the permit within the IUP document. City staff can update the permit with any <br /> conditions deemed necessary for this use prior to final approval. <br /> 7. SITE PLAN APPROVAL REQUIREMENTS <br /> Building Setbacks <br /> Sec. 90-278(d)(2)(b) requires minimum setbacks for solar farms that exceed the minimum <br /> required setbacks for the AG zoning district. The proposed solar farm meets these requirements. <br /> Building Height <br /> Sec. 90-278(d)(2)(d) requires a maximum height of 15 feet for ground mounted solar energy <br /> systems that is less than the maximum height allowed in the AG zoning district. The applicant <br /> has indicated that the solar farm will have a panel height of approximately 10 feet. The proposed <br /> solar farm meets this requirement. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.