<br /> ,f POPE DESIGN GROUP
<br /> I \ / �, 767 N. EUSTIS STREET, SUITE 190
<br /> x x x x x x x \ ST. PAUL MINNESOTA 55114
<br /> 651.642.9200
<br /> - - - / - - - - - - - - - r \ \\�\ \ \ / r / WWW.POPEDESIGN.COM
<br /> I \ \ \ \ \\\ \\\
<br /> I
<br /> - - -- -------- _ ___ _ _
<br /> ------------- -----_ -------- - ------- ----- ----- -------------- - - ---- ------- , - ------------------ _-���
<br /> ---------------------- --------- _ _ _
<br /> ----� ------ -`-�--- �------------ ------------- --------�-- /_ �� - ---- -- - - --- --- -�-�- - ----_--------- ------- r----- I /� \ \� �\ \�\\ \\\ \\\ \ \
<br /> - - \ - - �_� �-
<br /> L�
<br /> SF \\\ \\ �\SF
<br /> APPROXIMATE I I \
<br /> I r - I \\ \ \\ WETLAND LIMITS 456 \
<br /> I \ I \ 49 \ �o \\ \ \ \� 1LiBERTY
<br /> \\\\ 0INV
<br /> =\ ) Classical Academy
<br /> I I W \ \ �� oHw 507
<br /> I 3.03/° \ _ I
<br /> I I
<br /> ��\ �tio I I of
<br /> \\\SF N
<br /> SF-
<br /> ti I
<br /> G I \`\�\\
<br /> I \\ \\ \ \\ \ \\ I
<br /> 60\0 LibertyC assica
<br /> \ \ \ \ _ _ \\ \\\��\ \\ \\\\\ \\ oti
<br /> �\ \\ \\ \\ Academy\ x \ \\ \\\ \ y
<br /> \
<br /> Phase 1 o Lower
<br /> \ > \ \ I \ \ \ \ 1� .\ \�\ / I SCh oo Addition
<br /> �1 11 APPROXIMATE
<br /> WETLAND SETBACK \\\ -- U G O M \
<br /> I r \ \ 1.68% \ \ \ \ \ \ I I I \\ .\ 5
<br /> \ \ \ \ \ \ J l \
<br /> APPROXIMATE
<br /> WETLAND LIMITS \
<br /> \ \ \ \ III \
<br /> ��
<br /> I, I I , � II � , ►► I i m e orn
<br /> 02023 KIMLEY-HORN AND ASSOCIATES,INC.
<br /> I I \ I I IIIII I I 1
<br /> 767 EUSTIS STREET,SUITE 100,ST.PAUL,MN 55114
<br /> � IIII IIII I I III I I
<br /> 0.75% I I I I 120 WWW.KIM EY-HORN1COM
<br /> II IIII I \ 0
<br /> I J \ \ \ \ \ I III I I 1 \
<br /> IW 1 I
<br /> / \ \ \ 1 \
<br /> 1) 1 \
<br /> 11 \ r
<br /> 5 7 A \ I \ \ \ \ �, I \\\\\ \\ \ \
<br /> \\\\ \
<br /> W
<br /> 49 I \ 1 1 \ \ \ l \ \ \\ \ \
<br /> 0 9 USE PERMANENT BMP AS
<br /> TEMPORARY SEDIMENTATION
<br /> I I � I ✓ ,�� \. J \ / / � I \ \ \ I oti \ \ � � \\\\\\���� \ \\
<br /> BASIN. CONTRACTOR TO REMOVE
<br /> SEDIMENTATION FROM BMP ONCE
<br /> I wl \ I \ SITE HAS BEEN FULLY STABILIZED. \ \\\\ \\ \ \ \
<br /> \ \ \ \ \\\ \\ \ \
<br /> \ \ , \\ \ \
<br /> DO NOT DISTURB
<br /> \\\\ \\\ \\ \ \
<br /> EXISTING NATIVE
<br /> AREA \�\ \\
<br /> I \
<br /> I I / -
<br /> \ N �
<br /> I ✓I w I F \ I \ I \ \ \ \ \ \ \ \ 2.20% \ \�\\\\
<br /> II \
<br /> \ \
<br /> W
<br /> 01
<br /> \ I
<br /> I II I I I / \ /iaiaiaiaiaiiiiiiiiiiiaiaiaaaiaiia i�,r \ \ � \ \ I \ I
<br /> I I ( ®-
<br /> µ�a
<br /> I fi I C SF SF SF
<br /> 1 I� - - - - - - - \ \ \ \ \
<br /> - - I \ \ \
<br /> I \ \ vc+>� � � �.riaiior�iaiiiiiiaiii 4iraiaiaiiia/ \ \ \ � \
<br /> \ ! �` � U� \ � \ I\ •,1 � _;�_= I � I / � \ `� \ � \ _ � \ ���� / �o\ \ \ \ \ � � \ � \ \ ISSUES & REVISIONS DATE
<br /> �
<br /> Bl \ \\ \ 'I _ � - t A / \ I Jg$ \ \ I I \ \ \ \ \ \��� SCHEMATIC PRICING 4-14-23
<br /> f
<br /> 1 CITY SUBMITTAL 11-30-23
<br /> �- 1 - - � \ \ / ` \
<br /> r26 �,�- I I r - �.,,,�,g I �,�,�✓ s„u/ W ` \ \ \ \ CITY & B C W D
<br /> \ I W \ \ \ r g` I LO
<br /> I ► / \ , \ \ / \ \ \ )® ` \ �� \ 03-29-24
<br /> l \\ \ RESUBMITTAL
<br /> o ` i E66�
<br /> \- - - - - - - - - - Y I - - - - -C -ELS O=LtE�B`
<br /> _ _
<br /> _EL
<br /> �..1 \`L ELC
<br /> \ � 0-E C ��-b-�� 0-ELC /�l I _ / -
<br /> O�C L� �Ems_ �0-ELC 0-KC _-_0-ELC 0-ELC ELC .L -
<br /> \- A5= GAS `- - - � 0 ---- ---=� �_ - - - -- -- ------ -- L-- ------ / / �- ,
<br /> -__-- --- - ---- ------- ---------- ---------- --------------- ------------- ----- ---- �- - - �-� ------ ` - -
<br /> 453.07 /
<br /> 4 07 EFN _ \ \ ' 246 3.92 / - ---�---- -- --- -_�---------------�------------ -----�--------------------_�- ------- - ------ -_- '�i
<br /> S89 3'42"W-_ \ l �_ i - �� \ /
<br /> 1302.2� � ��_ ��
<br /> _ I nq
<br /> Iz
<br /> LEGEND EROSION CONTROL PLAN NOTES PHASE 1 SEQUENCE OF CONSTRUCTION O
<br /> SOIL MAP LEGEND �
<br /> 1. THE STORM WATER POLLUTION PREVENTION PLAN SWPPP" IS 7. CONTRACTOR SHALL DENOTE ON THE PLAN THE TEMPORARY THAT MAY LEAD TO UNAUTHORIZED DISCHARGE OF STORM WATER 1. INSTALL PERIMETER EROSION CONTROL(I.E.SILT FENCE)AND INLET PROTECTION AT
<br /> ROCK ENTRANCE ("SWPPP") EXISTING CTORMWATER INLETS. MAP UNIT SYMBOL MAP UNIT NAME ACRES IN AOI PERCENT OF AOI • U
<br /> COMPRISED OF THE EROSION CONTROL PLAN, THE STANDARD PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE POLLUTANTS. UNAUTHORIZED POLLUTANTS INCLUDE (BUT ARE NOT 2. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT � I HEREBY CERTIFY THAT THIS PLAN,
<br /> DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE LIMITED TO) EXCESS CONCRETE DUMPING, CONCRETE RESIDUE, 3. PREPARE TEMPORARY PARKING AND STORAGE AREA. ANTIGO SILT LOAM, O TO 2% • �/ SPECIFICATION CERTIFY
<br /> REPORT WAS PREPARED BY
<br /> EROSION CONTROL BLANKET SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, PAINTS, SOLVENTS, GREASES, FUELS, LUBRICANT OILS, PESTICIDES, 49 60.1 56.05% O LL ME OR UNDER MY DIRECT SUPERVISION AND
<br /> 4. CONSTRUCT AND STABILIZE DIVERSIONS AND TEMPORARY SEDIMENT BASINS.
<br /> SUBSEQUENT REPORTS AND RELATED DOCUMENTS. OFFICE TRAILERS,AND TOILET FACILITIES. AND SOLID WASTE MATERIALS. SLOPES THAT I AM A DULY LICENSED PROFESSIONAL
<br /> 5. CLEAR AND GRUB THE SITE. l-'
<br /> 6. BEGIN MASS SITE GRADING AND ROUGH GRADE SITE SUFFICIENTLY TO ESTABLISH ANTIGO SILT LOAM, 2 TO 6% �/� ENGINEER UNDER THE LAWS OF THE STATE OF
<br /> INLET PROTECTION 2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH LAND 8. ALL WASH WATER FROM THE CONSTRUCTION SITE (CONCRETE 14. EROSION CONTROL BMP'S SHOWN ON THESE PLANS SHALL BE 49B 6.6 6.2% vJ MINNESOTA.
<br /> DISTURBING ACTIVITIES SHALL OBTAIN A COPY OF THE SWPPP AND TRUCKS,VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.)SHALL BE INSTALLED PRIOR TO THE START OF LAND DISTURBING ACTIVITIES PROPOSED DRAINAGE PATTERNS. SLOPES z
<br /> 7. START CONSTRUCTION OF THE BUILDING PAD AND STRUCTURES. Z
<br /> � � SILT FENCE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) DETAINED AND PROPERLY TREATED BEFORE DISPOSAL. ON THE PROJECT,AND INITIATED AS SOON AS PRACTICABLE. g. TEMPORARILY SEED,THROUGHOUT CONSTRUCTION,DISTURBED AREAS THAT WILL BE 120 BRILL SILT LOAM 11.8 11.1% h NOT CTION
<br /> GENERAL PERMIT,AND BECOME FAMILIAR WITH THEIR CONTENTS. Know what's S below. O
<br /> 9. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND 15. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLYING WITH INACTIVE FOR 7 DAYS OR MORE OR AS REQUIRED BY THE NPDES AND/OR CITY GRADING
<br /> (BMP'S) PERMIT(S). Call before you dig. MICHAEL C.BRANDY,P.E.
<br /> LIMITS OF DISTURBANCE 3. BEST MANAGEMENT PRACTICES BMP'S AND CONTROLS SHALL FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION, CHETEK SANDY LOAM, 1 TO
<br /> CONFORM TO FEDERAL, STATE AND LOCAL REQUIREMENTS, AS AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND SHALL MAINTAIN COMPLIANCE WITH APPLICABLE LAWS AND 155B 1.4 1.40% MN
<br /> APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL AND LEAKS. REGULATIONS FOR THE DURATION OF CONSTRUCTION. NOTE:THE SEQUENCE OF CONSTRUCTION IS INTENDED TO CONVEY THE GENERAL CONCEPTS 6% SLOPES O DATE: 03/29/2024 LIC.NO. 462661
<br /> x x SAFETY FENCE CONTROLS AS DIRECTED BY THE PERMITTING AGENCY, ENGINEER OF THE EROSION CONTROL DESIGN AND SHOULD NOT BE RELIED UPON FOR CONSTRUCTION
<br /> OR OWNER. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON 16. THE CONTRACTOR SHALL FIELD ADJUST AND/OR PROVIDE PURPOSES.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETAILED PHASING AND MAHTOMEDI LOAMY SAND, 6 U_
<br /> BIOROLL SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR ADDITIONAL EROSION CONTROL BMP'S AS NEEDED TO PREVENT CONSTRUCTION SEQUENCING NECESSARY TO CONSTRUCT THE PROPOSED IMPROVEMENTS. 454C 0.6 .5%
<br /> 4. SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS EROSION AND OFF-SITE SEDIMENT DISCHARGE FROM THE THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING IMMEDIATELY, PRIOR TO AND/OR TO 12% SLOPES
<br /> DURING CONSTRUCTION IF ANY ADDITIONAL INFORMATION ON THE CONSTRUCTION SEQUENCE NORTH O COMMISSION No: 160061004
<br /> SOIL BOUNDARY-PER NRCS CONDITION THAT WILL PREVENT THE TRACKING OR FLOWING OF PROHIBITED. CONSTRUCTION SITE. LOG AND RECORD ANY ADJUSTMENTS AND BARRONETT SILT LOAM, 0 TO
<br /> IS NECESSARY. 456 2.7 2.6%
<br /> SEDIMENT ONTO PUBLIC ROADWAYS. SEDIMENT SPILLED, DROPPED, DEVIATIONS FROM THE APPROVED EROSION CONTROL PLANS 2% SLOPES DRAWN BY: GAR
<br /> XXX SOIL TYPE-PER NRCS WASHED, OR TRACKED ONTO A PUBLIC ROADWAY FROM THE 11. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS WITHIN THE SWPPP DOCUMENTS STORED IN THE JOB SITE TRAILER. z
<br /> CONSTRUCTION SITE MUST BE REMOVED AS SOON AS PRACTICABLE. SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL 507 POSKIN SILT LOAM 18.1 17%
<br /> WHEN WASHING IS REQUIRED TO REMOVE SEDIMENT PRIOR TO BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE PHASE I BMP QUANTITIES CHECKED BY: MCB
<br /> ENTRANCE ONTO A PUBLIC ROADWAY, IT SHALL BE DONE IN AN ACTION OF WIND OR STORM WATER DISCHARGE INTO DRAINAGE SWPPP UPDATES & AMENDMENTS GRAPHIC SCALE IN FEET
<br /> AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN DITCHES OR WATERS OF THE STATE. ±6,675 LF W WATER 0.1 .1% 0 40 80 160
<br /> KEYNOTE LEGEND APPROVED SEDIMENT BASIN. ANY FINES IMPOSED FOR SILT FENCE
<br /> DISCHARGING SEDIMENT ONTO A PUBLIC RIGHT OF WAY SHALL BE 12. STAGING AREAS, STOCKPILES, SPOILS, ETC. SHALL BE LOCATED THE CONTRACTOR MUST UPDATE THE SWPPP BY NOTING ON THE SITE MAPS SHEET
<br /> OA SILT FENCE PAID BY THE CONTRACTOR. OUTSIDE OF DRAINAGE WAYS SUCH THAT STORM WATER RUNOFF IN THE JOB SITE BINDER TO REFLECT THE PROGRESS OF CONSTRUCTION INLET PROTECTION 3 EA TOTAL FOR AREA OF INTEREST 106.5 100% Q
<br /> WILL NOT BE ADVERSELY AFFECTED. PROVIDE STABILIZATION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE FOR THE z EROSION AND SEDIMENT
<br /> 5. TEMPORARY SEEDING OR OTHER APPROVED METHODS OF MEASURES SUCH AS PERIMETER EROSION CONTROL BMP'S, DURATION OF LAND DISTURBING ACTIVITIES.AT A MINIMUM,UPDATES SHALL
<br /> OB INLET PROTECTION BE MADE DAILY TO TRACK CONSTRUCTION PROGRESS DESCRIBED IN THE ROCK CONSTRUCTION ENTRANCE 2 EA C
<br /> STABILIZATION SHALL BE INITIATED WITHIN 7 DAYS OF THE LAST SEEDING, OR OTHER COVERING AS NECESSARY TO PREVENT O G CONTROL PLAN - PHASE 1
<br /> DISTURBANCE ON ANY AREA OF THE SITE. EROSION. SEQUENCE OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR C ROCK CONSTRUCTION ENTRANCE NOTING THE LOCATION OF THE JOB SITE TRAILER,TEMPORARY PARKING& J
<br /> 6. THE CONTRACTOR SHALL MINIMIZE LAND DISTURBANCE AND 13. CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING ANY LAYDOWN AREAS, PORTA-POTTY,WHEEL WASH,CONCRETE WASHOUT, FUEL
<br /> CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED EROSION CONTROL BMP DISTURBED DURING CONSTRUCTION &MATERIAL STORAGE,SOLID WASTE CONTAINERS,AND OTHER Uj
<br /> BY THE GENERAL PERMIT. OPERATIONS. NOTIFY THE OWNER'S REPRESENTATIVE OF ANY CONSTRUCTION RELATED FACILITIES THAT MAY IMPACT STORMWATER
<br /> DEFICIENCIES IN THE ESTABLISHED EROSION CONTROL MEASURES RUNOFF. C300