My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 05.09.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 05.09.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:38:16 PM
Creation date
3/6/2025 11:35:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P o <br /> IlkDESIGN <br /> EXTERIOR MATERIAL FINISH SCHEDULE G R 0 U P <br /> POPE DESIGN GROUP <br /> MATERIAL ID MATERIAL MANUFACTURER FINISH COLOR LOCATION DOOR SCHEDULE- CORE AND SHELL 767 N. EUSTIS STREET, SUITE 190 <br /> Door Panels Door Frame FIRE ST. PAU L, M I N N ESOTA 55114 <br /> CMR-1 CORRUGATED METAL TBD TBD GREY ROOF Dr. Total of Panels #of Panel 1 Panel 2 Glass Head Glass Jamb Hard RATING 651.642.9200 <br /> ROOF <br /> Revision No. From Room To Room Width Height Pnls. Type Width Type Width Thick Material Type Type Height Material Type Detail ware (MIN) Comments WWW.POPEDESIGN.COM <br /> ENGINEERED WOOD LP FACTORY PRIMED; FIRST FLOOR <br /> EWS 1 HORIZ. LAP SIDING SMARTSIDE FACTORY FINISHED WHITE GROUND LEVEL, SEE ELEVATIONS 100A IRRIGATION CONTROLS& 3-0 71-011 1 PNL.F.HM 3-0 1 3/4 HM -- FRM.001.HM1 2 HM <br /> STORAGE <br /> CM-1 SPLIT FACE CMU AMCON SPLIT FACE GREY SPICE GROUND&ROOF LEVEL, SEE ELEVATIONS 100E IRRIGATION CONTROLS& 9'-0" 8'-0" 1 PNL.OHI.STL 9'-0" 2" STL -- FRM.1201.STL4 V-0" -- -- MOTORIZED <br /> STORAGE <br /> -- <br /> TRIM-1 ENGINEERED WOOD LP SMARTSIDE FACTORY PRIMEC; TBD GROUND&ROOF LEVELS, SEE ELEVATIONS 101A SEPTIC CONTROLS 3'-0" 7'-0" 1 PNL.F.HM 3'-0" 1 3/4" HM FRM.001.HM1 2" HM <br /> SIDING FASCIA FACTORY FINISHED 101B SEPTIC CONTROLS 9'-0" 8'4" 1 PNL.OHI.STL 9'-0" 1 1 <br /> 2" STL -- FRM.1201.STL4 V-0" -- -- MOTORIZED <br /> TRIM-2 ENGINEERED WOOD LP SMARTSIDE FACTORY PRIMEC; TBD GROUND&ROOF LEVELS, SEE ELEVATIONS <br /> SIDING TRIM FACTORY FINISHED <br /> _- -- FORM"DOME"OF LiBERTY <br /> EXPOSED CONC. CAP <br /> NOTE: <br /> " 11Classical Academy <br /> 0 w o 2" VARIES 2" <br /> THE BASIS OF DESIGN MATERIALS FOR THE PROJECT ARE LISTED ON THE SCHEDULE ABOVE. U) 46 <br /> `� SEE SCHED <br /> -- - T-6"LONG X 6" I.D. <br /> STEEL PIPE FILLED w/ <br /> -99 CONCRETE, FIELD PAINT o <br /> LU <br /> - 1/2" EXPANSION MATERIAL <br /> w/ROD&SEALANT w <br /> U) <br /> ' CONCRETE SLAB o <br /> Liberty c assica <br /> t' > <br /> a 18"TUBE FORM KICKPLATE Academy <br /> ;L VERIFY WITH <br /> o "MIN. OF CONC. COVER GROUPARE <br /> Phase 1 0 over <br /> Rogow! <br /> }-.4, a+ d1 FRM.001.HM1 PNL.OHI.STL PNL.F.HM C h o A H H t on <br /> F. <br /> Z HUGO U <br /> 9 PIPE BOLLARD DETAIL 8 FRAME TYPES 7 DOOR TYPES — <br /> Kimley >>> Horn <br /> A2.1 1 /2111 = 1 1-011 A2.1 1 /411 = 1 ,-0„ A2.1 1 /411 = 1 '-011 <br /> �w <br /> Expect More. Experience Better. <br /> 2 EWS-1 TYPICAL WOOD LOOK LAP SIDING CLADDING CMR-1 DARK CORRUGATED METAL ROOFING CM-1 SPLIT FACE BLOCK Z)'1 <br /> 1 C <br /> 2 <br /> A2.2 <br /> V) <br /> A B Z <br /> 1 C <br /> EXTERIOR ELEVATION KEY NOTES <br /> 0 <br /> E01 CMR-1 CORRUGATED TIN ROOF 121'-ROOF RIDGE ROOF RIDGE <br /> E02 EWS-1 LAP SIDING, FACTORY PRIMED WITH PAINT FINISH. 6 U <br /> E03 EWS-2 BOARD & BATTEN SIDING, FACTORY PRIMED WITH 4 E05 A2.1 <br /> PAINT FINISH. ..1E01, <br /> E04 TRIM-1 1X3 OVER 1X8 ROOF EAVE/RAKE TRIM, FACTORY <br /> PRIMED WITH PAINT FINISH. 1 <br /> T.O.STUD WALL OgL T.O.STUD WALL A2.2 <br /> E05 TRIM-2 1X8 GABLE TRIM, FACTORY PRIMED WITH PAINT FINISH. E04 110'-8" 110'-8" <br /> E06 TRIM-3 1X8 TRIM, FACTORY PRIMED WITH PAINT FINISH, 3 <br /> PROVIDE PRE-FINISHED METAL FLASHING CAP. EE 6 Eo6 A2.1 <br /> u <br /> E07 TRIM-3 1X6 DOOR TRIM, FACTORY PRIMED WITH PAINT FINISH, E Lj o7 100A <br /> PROVIDE PREFINISHED METAL FLASHING CAP AT HEAD. E09 <br /> E08 CONCRETE STOOP, SEE STRUCTURAL. u FIRST FLOOR FIRST FLOOR <br /> E09 PRIMED AND PAINTED PIPE BOLLARD, SEE DETAIL. 0 100'-o" E02 100'-o" FLOOR PLAN, EXT. <br /> E10 CONCRETE APRON, SEE STRUCTURAL. E08 <br /> T.O.FOOTING T.O.FOOTING ELEVATIONS EXT. <br /> 96'-0" — — — 96'-0" <br /> Z MI-iII111111 --i IL <br /> MATT FINISH <br /> 5 <br /> A2.1 SCHEDULE <br /> ISSUES& REVISIONS DATE <br /> FLOOR PLAN GENERAL NOTES 6 WEST BUILDING ELEVATION 5 SOUTH BUILDING ELEVATION 4 ROOF PLAN <br /> A2.1 A2.1 1 /8" = 1 '-0" A2.1 1 /8" = 1 '-0'I, <br /> 1/811 = 1 '-0" <br /> 9 P <br /> A. DO NOT SCALE DRAWINGS. TRUE PROJECT <br /> NORTH NORTH <br /> B. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. <br /> 2 <br /> C. IN THE CASE OF AMBIGUITIES, DISCREPANCIES, OR IRREGULARITIES IN THE DRAWINGS AND/OR 1 A2.1 C <br /> SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR CLARIFICATION <br /> FROM THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. 40'4" <br /> D. IN ALL CONSTRUCTION TYPES,ALL WOOD USED IN THE FOLLOWING LOCATIONS IS TO BE 8'-0" if 9'-0" 19 6'-0" 9'-0" 8'-0" <br /> PRESERVATIVE-TREATED: <br /> 6-6" 12'4" 3'-0" 12'-0" 6-6" <br /> 1. WOOD IN CONTACT WITH THE GROUND OR WATER <br /> 2. WOOD IN EXTERIOR FOUNDATION WALLS. CONC.APRON, -- CONC.APRON, <br /> 3. WOOD IN CONTACT WITH CONCRETE SLABS-ON-GRADE, OR IN CONTACT WITH CONCRETE OR B A C 1 SEE STRUCT. - SEE STRUCT. <br /> MASONRY FOUNDATION WALLS. <br /> 4. WOOD WITHIN A CRAWL SPACE OVER EXPOSED EARTH. 100B 101 B ' ---- PIPE BOLLARD <br /> 5. AT OTHER LOCATIONS NOTED ON THE CONSTRUCTION DOCUMENTS A <br /> E. SEE SHEET A0.2 FOR SYMBOLS, INDICATION OF MATERIALS, PARTITION TYPE DETAILS& ROOF RIDGE ROOF RIDGE <br /> ABBREVIATIONS. 121'-3" E03 OEOE 4 121'-3" A82 <br /> u <br /> F. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE BUILDING CODES AND E05 <br /> STANDARDS AS AMENDED BY LOCAL CODES. <br /> OE 1 u 6 <br /> G. PROVIDE WOOD BLOCKING WHERE WALL MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO A2.1 I hereby certify that this plan, specification, or <br /> CASEWORK, EQUIPMENT,ARTWORK AND FURNITURE ARE INDICATED. VERIFY LENGTHS AND o L - L — report was prepared by me or under my direct <br /> MOUNTING HEIGHTS OF BLOCKING. IRRIGATION SEPTIC supervision and that I am a duly Licensed <br /> T.O.STUD WALL T.O.STUD WALL CONTROLS CONTROLS <br /> H. INSTALL MANUFACTURED ITEMS, MATERIALS,AND EQUIPMENT IN STRICT ACCORDANCE WITH 110'-8" 110'-8" &STORAGE 101 Architect under the laws of the State of <br /> THE MANUFACTURER'S RECOMMENDED SPECIFICATIONS. E04 0 100 _ Minnesota <br /> 5-0 5-0 <br /> I. DELIVER, STORE,AND HANDLE MATERIALS IN A MANNER THAT WILL PREVENT DAMAGE. STORE E06 E07 OE 6 Cl) CONC. STOOP, CONC. STOOP, <br /> MATERIALS PER RECOMMENDATION OF SUPPLIER AND MANUFACTURER. REPLACE DAMAGED 01A `J E07 101 B 100B SEE STRUCT. _ SEE STRUCT. 3 <br /> MATERIALS. A2.1 <br /> J. CONTRACTOR SHALL PROVIDE CEILING AND WALL ACCESS PANELS AS REQUIRED. VERIFY EXACT <br /> q o <br /> LOCATION WITH THE ARCHITECT. FIRST FLOOR FIRST FLOOR ih C° Date: 02/27/24 <br /> E02 100'-0" E02 100'-0" <br /> K. THE CONTRACTOR SHALL SUBMIT PRODUCT INFORMATION (INCLUDING CUT SHEETS AND FINISH E08, E09 E10 <br /> SAMPLES)FOR THE FOLLOWING ITEMS TO THE ARCHITECT FOR COORDINATION AND — _ T.O.FOOTING — '—' — _ T.O.FOOTING o _ COMMISSION NO: <br /> COMPLIANCE WITH THE DESIGN INTENT: — — 96'-0" — — 96'-0" 1 00 °O <br /> WOOD FRAMING co ti ~ DRAWN BY: BW <br /> SIDING <br /> ROOF SHINGLES B CHECKED BY: EK <br /> DOORS, FRAMES AND HARDWARE <br /> WOOD TRUSSES <br /> MASONRY <br /> 5 SHEET <br /> L. REQUESTS FOR SUBSTITUTIONS FOR ITEMS SPECIFIED SHALL BE SUBMITTED IN WRITING TO THE A2.1 <br /> ARCHITECT FOR APPROVAL. THE BURDEN OF PROOF OF MERIT OF A SUBSTITUTION IS UPON THE <br /> PROPOSER. THE REQUEST SHALL IDENTIFY AND INCLUDE WITHIN THE SCOPE OF WORK FOR THE <br /> SUBSTITUTN ANY AND ALL ADJUSTMENTS MP EM NTIOTHE SUBSTITUTION REQUESTED. THEIARCHEURED IT CT'S DECISION OF APPROVAL OR THE ADJACENT CONSTRUCTION TO 3 EAST BUILDING ELEVATION 2 NORTH BUILDING ELEVATION 1 FIRST LEVEL FLOOR PLAN <br /> - - A2el <br /> DISAPPROVAL OF A SUBSTITUTION SHALL BE FINAL. A2.1 '°`2 1 1 /8" = 1 '-011 9 <br /> TRUE PROJECT TRUE SHEET SCALE <br /> NORTH NORTH <br /> 0" 1/2" V. <br /> C:\Revit Projects\2023\41129-23027C_Outbuilding_R23 Morthrup_PDG.rvt <br /> 2�8/2024 5:09:59 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.